|
| 1 | Cleaning jungle including up rooting ofrank, vegetations grass, push, wood trees and samplings of grith upto 30 cms.measured at a height of 1 M. aboveground level and removal of rubbish up to a distance of 50M. out side the periphery of area cleared. S.I No. 259(i) |
| 2 | Dewatering of Rub Water under Pond Complete item all labour Material T&P completed by 7.5 HP Diesal Engine including all arrangement. |
| 3 | De-silting and excavation of pond with removal and disposal of surplus earth moorum single polythine kankar required with labour complete. |
| 4 | Disposal of silt and slush upto 8th km. complete work. |
| 5 | Disposal of silt up to 1.00 KM distance complete with labour T&P ETC at site. (S.I-231) |
| 6 | E/W Cutting or in embankment for making road foemation with carted earth lead upto 8km. |
| 7 | Excavation in foundation in Soil mixed with kanker upto1.50m and lead upto 30m ……….. surplus earth as directed by the Engineer-in charge upto a distance of 30m from the foundation trenches. In foul position S.I No. 252 (a) |
| 8 | Cement Concrete with 2 cm gauge brick ballast, fine sand & cement proportion of 1:4:8 complete work as per S.i no. 281 |
| 9 | M-150 class Bricks work of mix 1:4 cementand coarse sand in foundation i/c supply of all materials,labour, T & P etc. |
| 10 | C.C 1:2:4 with cement, C.sand and stone grit complete asper S.I. No. 279(a). |
| 11 | 12mm thick cement plaster with cement & coarse sand of mix 1:4 complete. |
| 12 | Cement Concrete with 2c.m.gauge approved slone balliast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. |
| 13 | Reinforced Cement Concrete with 2c.m.gauge approved stone balliast, coarse sand & cement in the proportion of 1:1.5:3 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (S.I.284 a) |
| 14 | Reinforcement and its bending, but including its fixing and binding centering and shuttering etc. and supply of all materials, Labor ,Tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra. |
| 15 | Construction of granular sub-base by providing …………... and compacting with smooth wheel roller …...complete as per Technical Specificationin clause 401 . |
| 16 | Supply and laying 80mm thick cement inter locking tiles with 4cm. Cushin fine sand layer all material, labour and T&P etc. comp. work. |
| 17 | Supply and stacking of good earth at site including royalty and carriage for all leads and lift (earth measured at stack will reduced by 20% for Payment) |
| 18 | Spreading of Sludge, Dump, Manure or /and good earth in required thickness (Cost of sludge, Dump, Manure or / and good earth to be paid separately) |
| 19 | Digging the holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 volume (2 part of stacked volume of good earth after reduced by 20% : 1 part of stacked volume of dray manure after reduced by8% ) flooding with water dressing including removal of rubbish and surplus earth if any with all leads and lifts (cost of manure sludge or extra good earth if needed to be paid for separately) |
| 20 | Timber Plants Complete maintenance of shrubs with water for 12 months including weeding, hoeing, watering, pruning application of good earth. Manure, insecticides fungicides & fertilizers, security of plants, disposal of garden rubbish from the premises to the approved municipal dumping ground replacing causality of plants (occurred due to any reason) by healthy plants. All the materials required for maintenance water shall be provided by the contractor (cost of material including in the item) and nothing shall be provided by the Department. |
| 21 | Bottle palm ht. 270-300 cm bottom girth 40-50 cm well developed in big HDPE bag |
| 22 | Seasonal plants Complete maintenance of shrubs with water for 12 months including weeding, hoeing, watering, pruning application of good earth. Manure, insecticides fungicides & fertilizers, security of plants, disposal of garden rubbish from the premises to the approved municipal dumping ground replacing causality of plants (occurred due to any reason) by healthy plants. All the materials required for maintenance water shall be provided by the contractor (cost of material including in the item) and nothing shall be provided by the Department. |
| 23 | Supply and fixing Sign board (Granite Board with Wrighting of matter) |
| 24 | RAIN WATER HARWESTING |
| 25 | SITTING CHAIR |
| 26 | ELECTRIC POLE |
| 27 | ELECTRIC POLE LIGHT |
| 28 | BAMBOO HUT |
| 29 | DRAINAGE |
| 30 | ELECTRICITY FITTING & MATERIAL |
| 31 | WATER TREATMENT PLANT |
| 32 | Supply and Installation of 80 Ltr stainless Steel-RO+UV Water Cooler (Aquaguard/ Blue Star/Voltas or equivalent make) including all the accessories required for fitting/Installation and completion in all respect including supply of all material labour T&P etc as per direction of Engineer-in-Charge. |
| 33 | 18%GST Please Enable Macros to View BoQ information |