| 1 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting excetra complete. - (Lift upto 1.5 metre) By Mechanical MeansItem / Page No : 2 / 115Specification No : Bd.A.1Spec. Page No : 259 |
| 2 | Excavation for foundation in hard murum including removing the excavated material upto a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting excetra complete. (Lift upto 1.5 metre) By Mechanical MeansItem / Page No : 6 / 115Specification No : Bd.A.2Spec. Page No : 259 |
| 3 | Providing dry dry/ trap/ granite/ quartzite/ gneiss rubble stone soiling 15 centimetre to 20 centimetre thick including hand packing and compacting, excetra complete.Item / Page No : 38 / 117Specification No : Bd.A.12Spec. Page No : 264 |
| 4 | Providing and laying Cast in situ/Ready Mix, cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailling out water, formwork, laying/ pumping, compacting and curing, excetra complete, with fully automatic micro processor based Programmable Logic Controller with Supervisory Control and Data Aquisition enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) excetra complete. With fine aggregate (Natural Sand / Crushed sand VSI Grade finely washed, excetra)Item / Page No : 1 / 131Specification No : Bd.E.1Spec. Page No : 287 - 288Additional Specifications : 1. With additional specifications for controlled concrete. 2. If artificial / VSI crushed sand is used instead of natural sand; terms, conditions and specifications mentioned in Circular by Chief Engineer, Public Works Region, Pune bearing No CEP/D-2/Buildings-2/5940/2017 dated 17/10/2017 and Annexure-I attached to it and also Circular by Chief Engineer, Public Works Region, Nagpur bearing No 36 dated 15/01/2019 and Annexure-I attached to it will be appicable. |
| 5 | Providing cast in situ / ready mix M-20 grade cement concrete for head walls of cross drainage work / retaining walls excetra including necessary form work, compaction, finishing and curing excetra complete. (with reversible drum type mixer/ concrete batch mix plant (pan mixer) with Supervisory Control and Data AquisitionItem / Page No : 29 / 63Specification No : CD.8Spec. Page No : 163-164Additional Specifications : 1. With addtional specifications for controlled concrete. 2. If artificial / VSI crushed sand is used instead of natural sand; terms, conditions and specifications mentioned in Circular by Chief Engineer, Public Works Region, Pune bearing No CEP/D-2/Buildings-2/5940/2017 dated 17/10/2017 and Annexure-I attached to it and also Circular by Chief Engineer, Public Works Region, Nagpur bearing No 36 dated 15/01/2019 and Annexure-I attached to it will be appicable. |
| 6 | Providing and laying weep holes of 100 milimetre diameter asbestos cement / polyvinyl chloride pipes as per drawing for abutment, returns, return walls, excetra complete.Item / Page No : 37 / 99Specification No : MORTH 2705, 2706Spec. Page No : ---Additional Specifications : The work shall be done as per instructions of Engineer in charge. |
| 7 | Back filling behind abutment, wing wall and return wall as per drawings and technical specifications excetra complete. (by granular material)Item / Page No : 70 / 69Specification No : MORTH 2200, Spec. Page No : 107 - 108 |
| 8 | Providing and fixing Road junction / Information sign board of size 0.90 metre X 0.60 metre prepared on 16 gauge mild steel sheet with angle iron frame of size 35 milimetre X 35 milimetre X 5 milimetre including painting with one coat of zinc cromate stoving primer and two coats each of green/ white back ground and back side gray stove enamelled, bonded with red retro-reflective sheet Engineering grade, border / letters / numeral / arrows, coated with non pealable crystal clear protective coat retaining 100 percent reflection including two angle iron post of size 50 milimetre X 50 milimetre X 5 milimetre of 3.65 metre long inflated at bottom drilled on top and painted in white and black bands of 30 centimetre. with 4 numbers high strength galvanised iron bolts and nuts of size 10 milimetre diameter and 20 milimetre long sheet and angle iron post in one piece without joints including all taxes, conveying, fixing in ground with cement concrete 1:4:8 block of 60 centimetre X 60 centimetre X 75 centimetre size as directed by Engineer-in-charge, excetra complete. Mild Steel Board with Engineering Grade.Item / Page No : 47 / 49Specification No : MoRTH-801Spec. Page No : ---Additional Specifications : The work shall be carried out as per instructions of Engineer in charge. |
| 9 | Royalty charges for various building construction bonafied materials which are used for government bonafied works and for which Royalty charges are to be paid by the contractor. (This Item is to be paid to the contractor only after he pays the Royalty amount to Revenue department and produces the required voucher.)Item / Page No : 3 / 0Additional Specifications : 1. Government of Maharashtra, Revenue and Forest Department Gazette Number 146 Dated 04/06/2021 and Government of Maharashtra Public Works Department State Schedule of Rates 2021-22 General Note Number A(v), Page 5. 2. The amount of royalty charges will be paid only after submission of the receipt in original from Revenue authority for payment of royalty to Government, stating the name of work. 3. Above / below percentage quoted by the contractor will not be applicable for this item. |
| 10 | Laboratory testing charges for various materials required for items of work, on the basis of testing frequency and charges fixed by Vigilence and Quality Control Circle, Pune.Item / Page No : 4 / 0Additional Specifications : 1. The amount of laboratory testing charges will be paid to contractor only after submission of the original receipt from the Vigillence and Quality Control Office with the name of work mensioned on it. 2. Above / below percentage quoted by the contractor will not be applicable for this item. |
| 11 | Add insurnace 0.50%Non-Dsr ItemAdditional Specifications : The work shall be carried out as per the instructions of Engineer in-charge. |
| 12 | Add G.S.T. 18%Non-Dsr ItemAdditional Specifications : The work shall be carried out as per the instructions of Engineer in-charge. Please Enable Macros to View BoQ information |