|
| 1 | Amalner Nagarparishade 2026-27 Sathi Agnishaman Vibhagache Balkatikaran Karane Kami Agnishaman Vahan v Itar Vahan Durusti Karne v Durusti kami lagnare sahitya purvine |
| 2 | Half greasing/liner/bearing full work |
| 3 | Complete all oil change. |
| 4 | Gear cross - putting in a new one |
| 5 | Clutch plate new seal – freewheel, finger clutch bearing new |
| 6 | Joining bolts with new ones with a strip of glue |
| 7 | Replacing the air pressure kit |
| 8 | Removing radiator choke/installing new radiator |
| 9 | Replace all oil seats. |
| 10 | Headlight replacement |
| 11 | New indicator, put |
| 12 | Putting in a new horn. |
| 13 | Installing a new wiper |
| 14 | Replacing the bar light |
| 15 | Installing a new P.A. system |
| 16 | Replacing mattress cushions/seat covers |
| 17 | Laying a new pressure pipeline |
| 18 | Putting on fire sirens |
| 19 | Replacing the joint shaft |
| 20 | Re-inserting the joint |
| 21 | Inserting the head gas kit |
| 22 | Working on a diesel pump |
| 23 | Insert a new air filter |
| 24 | Installing a new clutch cylinder |
| 25 | Working with a gear booster |
| 26 | Working with Air DVD |
| 27 | Replacing the entire air pipe |
| 28 | Replacing the steering rod/knuckle |
| 29 | Working the entire engine |
| 30 | Working on the entire gearbox |
| 31 | Working on fire gear box |
| 32 | Depression, new pills |
| 33 | Replacing the engine crankshaft |
| 34 | Tire puncture removal/inflating |
| 35 | Greasing the entire vehicle |
| 36 | Repairing fire pumps |
| 37 | Monitor repair. |
| 38 | Putting new steering, shaft, bearing, bearing |
| 39 | Replacing battery terminals/wiring |
| 40 | welding Item |
| 41 | Replacing the center bearing and rubber |
| 42 | Servicing a portable pump |
| 43 | Repairing P.T.O |
| 44 | Replacing the diesel tank. |
| 45 | Installing a new diesel pump line. |
| 46 | Silencer, where to put a new one. |
| 47 | Working on the power steering box. |
| 48 | Car body work. |
| 49 | Repairing the hose reel. |
| 50 | Replacing the dipper light |
| 51 | To cast a new ray of light |
| 52 | Fitting new tires and tubes: i) Size 10/20 |
| 53 | 15/75 R16 |
| 54 | 255/65 R15 |
| 55 | 700 R15 |
| 56 | 100/90 |
| 57 | 19/M/C 57P |
| 58 | 165/80R14 |
| 59 | 275/R15 |
| 60 | Replacing the battery: Size i) 100Amp |
| 61 | 180Amp |
| 62 | 75Amp |
| 63 | 40Amp |
| 64 | 18Amp Please Enable Macros to View BoQ information |