| 1 | Earthwork in cutting or filling its cartage upto 05km all complete analysis |
| 2 | Excavation for pipe line in ordinary soil …as per jal nigam sor |
| 3 | supply of high density polyethylyine pipes hdpe (pn-6) /pe-100 … |
| 4 | supply of high density polyethylyine pipes hdpe (pn-6) /pe-100 … |
| 5 | Providing and laying cement concrete in 1:5:10(1 cement:5 fine sand :10 graded stone aaggregate 40 mm nominal size) and curing complete, Including cost of form work. in Foundation and floors with all complete. PWD SOR CH.5 SL. NO.1 (2023-24) |
| 6 | Class -150 (Non modular brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work . PWD SOR CH.6 SL. NO.2 (2023-24) |
| 7 | 12mm cement plaster with cement mortar in proportion of 1:4 cement & coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chamfers, and rounded angles not exceeding 80mm. In girth and finished even and smooth. PWD SOR CH.13 SL. NO.1 (2023-24) |
| 8 | Construction of un-reinforced ,plain cement concrete pavement thickness as per design ,over a prepared Sub base with 43 grade cement or any other type as per Clause 1501.2 .2 M-30 (Grade), coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, . sealant, near approaches t o bridge/culvert and construction Joints, admixtures as approved, curing of concrete slabs for '14 days, curing compund (where spec1f1ed) and water fin1sh111g to lines and grade as per drawing and technical specification clause 1501 .(For Agra) PWD SOR CH.20 SL. NO.12 (2023-24) |
| 9 | Constructing brick masonry manhole in cement mortar '1:4 ( 1 cement : 4 coarse sand ) with R.C.C. top slab with 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), foundation concrete l:4:8 mix (1 cement :4 coarse sand : I graded stone aggregate 40 mm nominal size), inside plastering 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand) finished ivith floating coat of neat cement and making channels in cement concrete 1:2:4 ('1 cement: 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) Fisnihed with a lloating coat of ne |
| 10 | Providing arrd Laying NP-3 pipe RCC con on first class in single row including fixing socket with cement moriar 1:2 but excluding excavation, proteclion works, backfilling, concrete and masonry works in head walls and parapets clause 2900. crete pipe for culvert350mm dia |
| 11 | RCC work providing and laying in position specified grade of reinforced cement concrete ,slab including the cost of centering,shuttering,finishing and excluding rem forcement Above plinth level upto fifth floor lable :1:1:5:3 (1 cement:1.5 coarse sand :3 graded stone ) PWD SOR CH.5 SL. NO. 10 (2023-24) |
| 12 | S&F MS iron work in reinforcement work &all complete. |
| 13 | add gst 18% Please Enable Macros to View BoQ information |