| 1 | Supply at site including installation of triple layer water tanks of standard make including all sorts of carriage Yatra Camp site at Panthachowk including making connections by way of Making bore including providing & fixing of pipe specials like Jam Nut & Nipple etc including providing & fixing of Ball Cock etc complete Job.` |
| 2 | Collection of water tanks already existing at Top & Bottom Station Tangnar Plant and angle Iron Stands upto the installations spots at Yatra Camp Site including cleaning of water tanks with chlorinated water including making necessary connection including providing & fixing of pipe specials like,Tank nipple, Jam nut & nipples union, elbow, & installation of cleaned Tanks at Langar, Bathroom, washroom & lavtory block sites & like including cost of pipe specials ,Providing PVC Tank Lids, interconnecting the tanks wherever required incl cost of pipes & pipe specials ,Loading unloading & carriages as per the directions of site engineer complete Job.I. Angle iron stand with necessary weldings/fixings. |
| 3 | 2000Lts PVC Tank /1000Ltrs /500ltrs |
| 4 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade, one or more coats on old work. |
| 5 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work.I. 15 mm dia nominal bore |
| 6 | I. 20 mm dia nominal bore |
| 7 | II. 25 mm dia nominal bore |
| 8 | III. 40 mm dia nominal bore |
| 9 | IV. 80 mm dia nominal bore |
| 10 | Carriage of pipe material used in yatra 2025 -26 from divisional store to the yatra camp Pantha chowk . This include loading ,unloading and stacking of pipe material. |
| 11 | Providing & installation of Flex Banners with holow MS Tubular frame with the texts & images printed as per the directions of Engineer Incharge complete Job. |
| 12 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded |
| 13 | Hire charges of hydraulic excavator including driver and POL complete job, as per the direction of site engineer. |
| 14 | Hire charges of welder including gen set for welding of pipes, including cost of fuel, electrodes and all sorts of carriages to and fro also including manpower complete job. |
| 15 | Installation of submersible pump unit with stabilizer including carriage from sub divisional office to yatra Camp.this item include the cost of necessary electrical items and works including necessary pipe fittings for successful commissioning of pump units and its return to sub-divisional office complete job. |
| 16 | Installation of horizontal pumps including carriage from sub divisional office to yatra camp ,this item also includes cost of necessary electrical items and necessary electrical work including necessary pipe fittings for successful commissioning of pumping units and its return to sub-divisional office after successful completion of Shri Amarnath Ji yatra. complete job. |
| 17 | Disassembling/ Dismantalling & stacking of material viz (pvc tanks/GI pipes/motors/ chairs and all other materials at location of yatra camp/Yatra Niwas)complete job. |
| 18 | Carriage of material from site of work at Panthachowk to Sub Divisional Store including loading unloading complete. |
| 19 | Carriage of material from site of work at Panthachowk to Divisional Store including loading unloading complete. |
| 20 | Supply of cushioned chair set (1 Tablet / 4 Chairs) for the PHE Staff / Lab Staff deputed at Yatra Camp as directed by Engineer Incharge. |
| 21 | Supply and Installation High-Efficiency Cooling System of standard make as approved by the engineer incharge that Delivers 40 litres per hour cooling with an 80-litre storage tank /80 liter coller with 80 liter coller purification followed by RO +UV+UF+TDS CONTROLLER ,FULL STAINLESS STEEL BODY, ensuring uninterrupted cold water supply for 100–120 users, ideal for , offices, and commercial settings including necessasry electrical fittings,MS stands complete job.Dual Tap Dispensing: Features 2 cold water taps to enable simultaneous usage, reducing wait time during high-demand periods and enhancing user convenience. Optimized Cooling Technology, efficient cooling while maintaining consistent water temperature throughout the day. |
| 22 | Supply & installing ,fixing of PIPE SPECIALS.I. 15 mm PTMT bib cock. |
| 23 | I. union 40 mm dia GI. |
| 24 | II. union 25 mm dia GI. |
| 25 | III. union 20 mm GI |
| 26 | IV. elbow 20mm GI |
| 27 | V. elbown 25 mm GI |
| 28 | VI. elbow 40mm GI |
| 29 | VII. Flanged Joints 100mm/80mm Complete Job |
| 30 | VIII. SOCKET 20 MM GI |
| 31 | IX. SOCKET 25 MM GI |
| 32 | X. SOCKET 40 MM GI |
| 33 | PVC BALL VALVE 25 MM |
| 34 | XIII. BRASS GATE VALVE 40MM (MAKE ;VAG/ ZOLOTO/ TALIS) complete Job |
| 35 | XIV. BRASS GATE VALVE 20 MM(MAKE ;VAG/ ZOLOTO/ TALIS complete Job) |
| 36 | XV. BRASS GATE VALVE 25 MM(MAKE ;VAG/ ZOLOTO/ TALIS)complete Job |
| 37 | XVI. 80mm Dia Sluice Valve(MAKE ;VAG/ ZOLOTO/ TALIS) complete Job |
| 38 | XVII. Single Lobed Air Release Valve 50mm dia complete with Fittings(MAKE; VAG/ ZOLOTO/ TALIS) complete Job |
| 39 | Cost on account of Operation & maintenece of Water Supply system at Yatra Camp & Yatra Niwas during Yatra 2026-27 complete by way of 24x7 Deputation of Skilled labours Two Plumbers at Each station including cost of lodging/boarding (Yatra camp/Yatra Niwas) (Electrican/ welder whenever needed) at the Yatra Camp beat including cost of repairing works by way of repairing/providing & fixing of pipe specials(Reputed make) / repairing/ replacement of damaged regulatory valves(Regulatory valves)/welding complete job for the period of 60 Days for uniteruppted water supply to Camp as per the directions of Engineer Incharge. |
| 40 | Making connection of G.I. distribution branch with G.I. main of following sizes by providing and fixing Tee, including cutting and threading the pipe etc. complete I. 25 to 40 mm nominal bore |
| 41 | 50 to 80 mm nominal bore. |
| 42 | Providing/Fabricating/Fixing of MS Fittings Viz Bends, Tees , Double Collars ,Tail Pieces ,MS Connection Clips of suitable degrees to be fabricated from 6mm/8mm thick MS plate as per the requirement at site.This also includes welding charges, cutting , threading etc .The work should be leak proof .This item aslo including lead clauking , Red Oxide primer coat, cost of spun yarn Complete Job. |
| 43 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 1 meter from cutting edge. All kinds of soil : |
| 44 | Providing Refreshment to supervisory/field/lab staff/phe staff during Yatra period for a period ofabout 75 days including fifteen days before starting of yatra and ten days after completion of yatra at yatra camp/niwas. The refreshment should be neat , clean and hygienic with the following menu.(to be paid as per actual in respect of persons/day).I. water bottle |
| 45 | II. Tea with butter toast |
| 46 | III. veg pulao Please Enable Macros to View BoQ information |