| 1 | Works at GSS Pampore |
| 2 | Design, Engineering, Manfacture, Shop Testing, Supply including packing and forwarding, Transportation and delivery at site as per Technical Specifications and approved drawings |
| 3 | 50 MVA, 132/33 kV Three Phase Power Transformer with OLTC, HV and LV connectors and other required accessories and fittings with online DGA monitoring kit, online dehydration kit and maintenance-free automatic breathers as per detailed Technical specs as per SBD incliding other related works/accessories & Civil works required for its complete commissioning. (Current density for HV/LV winding not more than 2.4 A/sq mm. Core Flux density not more than 1.5T) alongwith spares strictly as per the details contained in the Standard Bidding Document. The Transformer supplied is without NIFPS & SCADA Compatible RTCC |
| 4 | 132KV Post Insulators Solid Core Type/ PolymerType, Power Frequency Withstand Voltage 275KV RMS Dry lightning impulse withstand voltage± 650 (KVP) |
| 5 | Handling, Storage, Preservation, Erection, Testing and commissioning of equipments and material including all comsumables required for 50 MVA Power Transformers etc including Ferrules, Lugs, Printed sleeves, cable ties, cable glands, Tags, minor cutting, wielding works etc. complete in all respects |
| 6 | 50 MVA, 132/33 kV Three Phase Power Transformer with OLTC, HV and LV connectors and other required accessories and fittings with online DGA monitoring kit, online dehydration kit and maintenance-free automatic breathers as per detailed Technical specs as per SBD incliding other related works/accessories & Civil works required for its complete commissioning. (Current density for HV/LV winding not more than 2.4 A/sq mm. Core Flux density not more than 1.5T) . |
| 7 | 132KV Post Insulators Solid Core Type/ PolymerType, Power Frequency Withstand Voltage 275KV RMS Dry lightning impulse withstand voltage± 650 (KVP) |
| 8 | Civil Works |
| 9 | Retrofitting of Existing Power Transformer Foundations for Installation of 50 MVA Transformer in 1:1.5:3 Mix( Min Qty 24.22 Cum) including Dismantalling work =2.65 Cum, Earth Work= 15.84 Cum, 1:4:8 Mix= 1.34 Cum, Reinforcement=463 Kg, Form work,plaster and Carriage-COMPLETE JOB as per instructions of Site Engineer. |
| 10 | Demolishing R.C.C. work ( Minimum Qty 14.64 Cum) manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. |
| 11 | Dismantelling of 5 No 16.66 MVA Power Transformers at Grid station Pampore |
| 12 | De-erection/Dismantelling of existing 16.66 MVA,132/33KV Power Transformers by way of opening of Jumpers, draining oil into Barrels, opening of Conservator Tank etc, manual carriage up to loading site, loading, Mechanical Transportation up to Divisional Stores Awantipora , unloading of Power Transformer at the site along with assessories & Transformer Oil, Manual dragging of transformer & other items up to stacking site as per the instructions of Engineer Incharge.(Complete Job) |
| 13 | Works at GSS Amargarh |
| 14 | Design, Engineering, Manfacture, Shop Testing, Supply including packing and forwarding, Transportation and delivery at site as per Technical Specifications and approved drawings |
| 15 | Main Equipments |
| 16 | 50 MVA, 132/33 kV Three Phase Power Transformer with OLTC, HV and LV connectors and other required accessories and fittings with online DGA monitoring kit, online dehydration kit and maintenance-free automatic breathers as per detailed Technical specs as per SBD incliding other related works/accessories & Civil works required for its complete commissioning. (Current density for HV/LV winding not more than 2.4 A/sq mm. Core Flux density not more than 1.5T) alongwith spares strictly as per the details contained in the Standard Bidding Document.The Transformer supplied is without NIFPS & SCADA Compatible RTCC) |
| 17 | 33KV VCB (36 KV, 2000 Amps of 3 phase, 50 c/sand 31.5 KA for 3 sec) outdoor type with allaccessories and auxiliaries along withsupporting structures etc. complete in allRespects SS BODY, UNIVERSAL SPRINGCHARGING MOTOR alongwith spares strictly as per the details contained in the Standard Bidding Document (SBD) |
| 18 | Handling, Storage, Preservation, Erection, Testing and commissioning of equipments and material including all comsumables required for 50 MVA Power Transformers etc including Ferrules, Lugs, Printed sleeves, cable ties, cable glands, Tags, minor cutting, wielding works etc. complete in all respects |
| 19 | Main Equipments |
| 20 | 50 MVA, 132/33 kV Three Phase Power Transformer with OLTC, HV and LV connectors and other required accessories and fittings with online DGA monitoring kit, online dehydration kit and maintenance-free automatic breathers as per detailed Technical specs as per SBD incliding other related works/accessories & Civil works required for its complete commissioning. (Current density for HV/LV winding not more than 2.4 A/sq mm. Core Flux density not more than 1.5T) . |
| 21 | 33KV VCB (36 KV, 2000 Amps of 3 phase, 50 c/sand 31.5 KA for 3 sec) outdoor type with allaccessories and auxiliaries along withsupporting structures etc. complete in allRespects SS BODY, UNIVERSAL SPRINGCHARGING MOTOR . |
| 22 | Civil Works |
| 23 | Retrofitting of Existing 15 MVA Power Transformer Foundations for Installation of 50 MVA Transformer in 1:1.5:3 Mix( Min Qty 24.22 Cum) including Dismantalling work =2.65 Cum, Earth Work= 15.84 Cum, 1:4:8 Mix= 1.34 Cum, Reinforcement=463 Kg, Form work,plaster and Carriage-COMPLETE JOB as per instructions of Site Engineer. |
| 24 | Dismantelling of 1 No 15.00 MVA Power Transformers at Grid station Amargarh. |
| 25 | De-erection/Dismantelling of existing 15 MVA,132/33KV Power Transformers by way of opening of Jumpers, draining oil into Barrels, opening of Conservator Tank etc, manual carriage up to loading site, loading, Mechanical Transportation up to Divisional Stores of TLMD-III , unloading of Power Transformer at the site along with assessories & Transformer Oil, Manual dragging of transformer & other items up to stacking site as per the instructions of Engineer Incharge.(Complete Job) Please Enable Macros to View BoQ information |