| 1 | Providing and laying of dry stone soling including ramming, dressing & all sorts of carriage etc. complete in foundations and under floors |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 3 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including curing but excluding the cost of centering , shuttering and finished with1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for foundations |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 6 | Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes conforming to IS: 15801, UV stabilized and anti-microbial fusion welded, having thermal stability for hot and cold water supply including all PP-R plain and brass threaded Polypropylene random fittings. This includes testing of joints complete as per direction of Engineer-incharge. External work including trenching, refilling etc |
| 7 | PN-10 pipe , 50mm OD (SDR-11) |
| 8 | PN-16 pipe, 40mm OD (SDR-7.4) |
| 9 | PN-16 pipe , 25mm OD (SDR-7.4) |
| 10 | PN-16 pipe , 20mm OD (SDR-7.4) |
| 11 | Providing and fixing PPR Fittings |
| 12 | PPR Union 50mm |
| 13 | PPR Union 40mm |
| 14 | PPR Union 25mm |
| 15 | PPR Union 20mm |
| 16 | Making connection of G.I. distribution branch with G.I. main of following sizes by providing and fixing Tee, including cutting and threading the pipe etc. complete |
| 17 | Upto 40mm Nominal Bore |
| 18 | Cleaning including Silt Clearance of RCC chamber, The Job includes cleanising of the Walls, Floor, Prior to Storing of the Drinking Water Complete Job |
| 19 | Providing, Installation of Sign Boards made of Flexies Over Iron Installed Posts at designated Spots . |
| 20 | Providing, Supplying, Installation, Testing, Commissioning, Operation & Maintenance of water purifier with inbuilt RO purifier that uses RO+UF+TDS Control purification process to make water Pure. Equipped with Mineral ROTM Technology with Purification Production Rate upto 40L/Hr, Storage Capacity of 20 Litres, Of approved Make as approved by engineer incharge suitable for transit camp usage, including 02 Nos. tap outlets, complete in all respects including its O&M for the entire SANJY 2026 period. |
| 21 | Cleaning and disinfection of PVC storage tanks, including draining out water, scrubbing internal surfaces, removal of algae, dirt, and sediments, and applying approved disinfectants (bleaching powder/chlorine) complete in all respects prior to use and During the Yatra period if required and after sucessful completion of the Yatra. |
| 22 | 500 Litre PVC Tank |
| 23 | 1000 Litre PVC Tanks |
| 24 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank ISI : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes including necessary fittings. |
| 25 | Placing/re-fixing of existing polyethylene (PVC) water storage tanks up to 2000 litres capacity on terrace at all floor levels, over existing angle iron stands or directly on RCC slab/ceiling, including carefully shifting/lifting of tank from ground or any other location to terrace (all leads & lifts), positioning and proper alignment, minor adjustments in inlet, outlet and overflow connections, tightening of fittings, minor leak rectification, testing for proper functioning after installation, complete in all respects as directed by the Engineer-in-Charge. The Job Also Include Removal Of tanks after the sucessful completeion of Yatra. |
| 26 | Providing, Fixing, Reappairing of Sanitary Items like Bib Cocks, Sockets, Unions,elbows, reducers as per the requirements at site during the whole yatra period of 60 Days. This item is payable only after production of GST Voucher of the items installed at site. |
| 27 | Rubber/ PVC/ Bib Cocks of Standard Quality |
| 28 | PPR Sockets of various dias as required for reapiarment of existing system. |
| 29 | PPR elbows of various dias as required for reapiarment of existing system. |
| 30 | PPR reducers of various dias as required for reapiarment of existing system. |
| 31 | Suction Pipe 50mm/40mm Dia |
| 32 | Suction Pipe 25mm/20mm Dia |
| 33 | Engagement of water tanker service or Tractor or Tipper with installed PVC Tank storage of minimum 5000 litres with commercial licenced driver for filling of storage tanks for drinking purposes and Lungers, from filling point to camp sites, Including POL(HSD) Charges and other maintenance charges, including motor of sufficient capacity with necessary connected pipe to supply water into the Installed PVC Tank/RCC Chamber complete job. Tanker service for 60 days. 4 trips per day minimum or as per requirment (Hire charges of tanker with capacity min 5000litr). The item should be as per the Log Book dully vetted. |
| 34 | POL (HSD) charges in case of utilising the services of Departmental Tanker in case of emmergencies to cater extra requirements of yatra site and of designated secuirity establishments within 40Kms to and fro complete TO BE PAID AS PER ACTUAL REQIREMENT,LOG BOOK. |
| 35 | Supply, Installation and successful commissioning of Open well Single phase Horizontal Submersible Motors of 2HP Capacity of approved brand and Manufacture preferably Crompton/ Crompton Grieves/ Havelles/Kirloskar Make with all necessary wiring, piping upto the nearest 50mm PPR Pipe, Suction pipe if required, Starter/Push Botton, Panel Board, 5.0mm service wire within 50.0metres complete job with necessary anchorage against washing away, ready to lift water from River Jehlum. Complete Job |
| 36 | Open well Single phase Horizontal Submersible Motors of 2HP |
| 37 | Starter & Panel Board |
| 38 | 5.0mm service wire within 50 meters. |
| 39 | Anchorage / protection works |
| 40 | Supply, Installation and successful commissioning of Domestic Monoblock pump of 1.0 HP/2.0 HP Capacity of approved brand and Manufacture preferably Crompton/ Crompton Grieves/ Havelles/Kirloskar Make with all necessary wiring, pipe connections with the nearest 50mm/40mm/25mm PPR Pipe, Suction pipe, Starter/Push Botton, Panel Board, 5.0mm service wire within 30.0metres complete job ready to pump water from the PVC Tanks to the required with necessary roof covering to protect from the rains/water . Complete Job |
| 41 | Domestic Monoblock pump of 1.0 HP Capacity |
| 42 | Domestic Monoblock pump of 2.0 HP Capacity |
| 43 | Starter/control panell with complete installation for 2.0 HP Motor |
| 44 | Starter/control panell with complete installation for 1.0 HP Motor |
| 45 | Single Phase Cable 2.5mm Copper Wire including necessary fitting complete |
| 46 | Suction pipe with foot valve |
| 47 | installation, fitting and testing |
| 48 | Protective roof covering (GI/FRP) |
| 49 | Providing, Installation, Testing & Commissioning of 10 KW Oil Cooled Servo Voltage Stabilizer (Copper Wound) with all accessories including Operation & Maintenance for complete contract period – Complete Job |
| 50 | Providing PVC Pipe Roll of 20mm dia of total length 30.5m required during emmergencies |
| 51 | Fixing and installation of water proof tent for the operational staff during the yatra period including providing necessary supports if required |
| 52 | Providing refreshments for the operational staff minimum 0 4 No. On daily basis for Breakfast, lunch and dinner during the yatra period of 60 days |
| 53 | Teas 03 Times a Day for 03 No. Deputed employees with necessary Bread/Biscuits Etc |
| 54 | Lunch for 03 Employees |
| 55 | Dinner For 03 Employees |
| 56 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. Chequered plate wherever required, all complete In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works for IRON STANDS/ Iron Posts for Sign Boards |
| 57 | Providing of the necessary items including all installations and carriages to the operational staff during the yatra period for ensuring night stay at the camp site as approved by of Engineer in charge |
| 58 | Air Cooler Of Approved Brand Preferably Havelles |
| 59 | Desk top Tables Of approved Make |
| 60 | 3.00 core 10 sqmm copper flexible cable (preferable polycab or havells including LT Cable for nearest electric pole upto RCC Chamber |
| 61 | Blankets of King Size with weight not less than 6.00 kgs |
| 62 | Extension With 03 No. female socket GM QUALITY and a male plug top made out of 4.00 meter long 2.50 mm polycab/havells cable |
| 63 | Permenant Marking of All PHE PVC Tanks, Angle Iron Stands With the Departmental PHE Sub Division Sumbal Name Complete as per the Directions Of Engineer in Charge |
| 64 | Rechargeable Torches |
| 65 | Reappair of existing Stabilizers and ensuring that the Stailizers are fully operational during the whole period of yatra period including providing of necessary oiling for operation including all carriages to and fro. Complete Job, The Job also includes Reappair of Any damages to the Stabilizers during the Yatra . |
| 66 | Repair of the existing old horizontal motors including all carriages to and fro including necessary installations at the required Site and ensuring their working throughout the yatra.Domestic Monoblock pump of 1.0 HP Capacity |
| 67 | Repair of the existing old horizontal motors including all carriages to and fro including necessary installations at the required Site and ensuring their working throughout the yatra.Domestic Monoblock pump of 2.0 HP Capacity |
| 68 | Carriage of cement/Steel /GI Pipes upto 80mm Dia By Mechanical Transport Average Lead 25 Kms |
| 69 | Carriage of materials by mechanical transport including loading, unloading, stacking of materials for Sand /20mm Aggregiates within 30 kms Lead |
| 70 | Laying and fitting of PPR/ G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work. 25 MM |
| 71 | Laying and fitting of PPR/ G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work.16 MM |
| 72 | Laying and fitting of PPR/ G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work.20 MM |
| 73 | Hire Charges Of Commercial Goods Carrier Vehicle with commercial licensed driver for carraige of the PVC Tanks, Motors, various items From Divisional Store to Camp and back from to Store after Completion of Yatra Including all loadings and Lifting. |
| 74 | Carriage of PVC Tanks/ Motors/ Iron Stands From Divisional Store to Shadipora Camp /Designated Spots |
| 75 | Carriage Of Items After Sucessful Culmination Of Yatra from Camp To Divisional Store. Please Enable Macros to View BoQ information |