|
| 1 | Excavation in foundation trenches etc.mechanical means in all classification of soil such as pick work,jumper work,pick jumper work,blasting work and hard blasting work in dry or saturated condition upto any depth and lift including pumping and bailing out water where required including stacking the serviceable and unserviceable material separately as directed and then returning the stacked soil in 15cm(fifteen centimeter) layers when required into plinth and sides of foundation etcetra consolidating each deposited layer by ramming and watering and then disposing of all surplus unserviceable excavated earth as directed by the engineer in charge including carriage of material in all leads and lifts disposed material to be neatly dressed leveled as per instructions of the Engineer in charge.The rates are inclusive octroi, royality,malkana ,toll tax,sale tax ,GST,labour cess or other taxes imposed by the Government. |
| 2 | Providing and laying mechanically mixed and vibrated concrete for plain/ reinforced concrete in open foundation/ for all type structure complete of plain cement concrete nominal mix 1:4:8 ( One cement :four sand:eight graded crushed stone aggregate 20mm (twenty Millimeter) nominal size in or under wateror ground complete including pumping or bailing out water,dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights/ depths including the cost of form work as per drawings and technical specification Clause 802.803.1202 and 1203 as per the direction of the Engineer-in- charge ,including carriage of material within all leads and lifts and other incidential.The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government.. |
| 3 | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering-All work upto plinth level 1:3:6(one cement: three coarse sand): six graded stone aggregate 20mm nominal size) as per the direction of the Engineer-in- charge including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government.. |
| 4 | Providing and laying in position cement concrete for plain/reinforced concrete in open foundation for all type structure complete in cement concrete 1:2:4 (one Cement : two coarse sand) : four graded stone aggregate 20 mm nominal size) of specified grade including the cost of centering and shuttering as per the direction of the Engineer-in- charge including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government.. |
| 5 | Providing and laying reinforcement cement concrete work of grade M-25(M-twenty five )design mix to obtain the minimum crushing strength of 25 N/mm2 (twenty five Newton per millimeter square ) with minimum cement content not less than 400 kg (Four hundred kilogramme ) per cubic meter mechanically mixed and vibrated including curing complete including cost of form work and reinforced concrete work in suspended floors, roofs, landing and shelves and their supports balconies beams,girders, bressumers and cantilevers upto all floor level/height including entire carriage of material within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government. |
| 6 | Steel reinforcement (Sail/RINL/Shyam steel Tisco, Jindal panther (JSPL) make)for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more including entire carriage of material within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government. .NOTE: 1) All Type of material shall be arranged by the contractor vide Notification by Additional Secy.to the Govt. of HP vide letter No.PBW(B)©(17)2/0212 dated 7.8.2018 2) The rates shall be inclusing of all types of taxes including GST etctra) 3) The bidder are requested to submit their bid as per notification issued by the Principal Secy.PW to the Govt.of HP vide letter No.PBW(B) A(3)1/2020 dated 22.7.2020 & Govt. of HP vide letter No.PBW(B) A(3) 1/2020-1 dated 7.10.2021 Please Enable Macros to View BoQ information |