| 1 | Construction of Tube-well upto 100 Meter depth and above in all type of rocks by DTH system and over burden to accommodate casing pipe of following sizes in all types of soils and over burden including lowering of casing pipes but excluding cost of casing pipes as per IS : 2800 (Part I & II) 1979 specifications. The work would be completed after obtaining sand free water. The tube well should have a throughout bore as per nominal dia of casing pipe: |
| 2 | Construction of tube-well from ground levels to accommodate housing and assembly pipe of following sizes in all types of alluvium strata by percussion/ rotary drilling method and with gravel as per IS:4097-1967 and packing as per IS:2800 (Part I -& II) 1979 as amended upto date (the work includes the cost of gravel & its primary packing and packing during development, lowering of housing & strainer assembly pipes, with supply and wrapping of coir-rope, wherever necessary for arresting fine sand particles. The work will not include cost of housing pipe and strainer pipe assembly and development work, but work would be completed after obtaining sand free water).Nominal bore 150mm dia |
| 3 | Supply of ERW M.S. black casing pipe ISI marked (IS: 4270/1992) of grade Fe410 of following nominal bore sizes at site of work.150 mm dia |
| 4 | Supply of strainer pipes made of ERW M.S. black pipe ISI mark of following sizes at the site of work including required size of slotting as per IS:8110-1985 of following nominal bore sizes at site of work.150 mm dia |
| 5 | SITC of Radial / mixed flow ISI marked water and anti-corrosive liquid filled submersible motor pump sets suitable for 100/150mm dia borewell. The size of adopter fixed on top of the motor should exceed the top of coupler , for safegaurd the coupler. The construction material of motor and pump should match IS: 8034 : 2018 and IS: 9283 guideline. The radial flow pumpset should operate at 5 star energy efficiency level of BEE and mixed flow pump set should operate at 3 star energy level of BEE, accompained by valid BEE certificate. Motor should be IE2 class as per IEC 60034-2-1: 2007, IEC 60034-30: 2008, & IS12615:2011 with required accessories including making connection suitable for Bore well. The job includes labour part of lowering of riser pipe G.I./ H.D.P.E. with rope, cables & pump, installation of complete fitting and accessories, jointing of electrical cables up to Starter. All labour for testing of submersible pumps set and supply of water to water mains, complete in all respect. OEM shall have submit NABL / CPRI / ERDA accrediated lab type test certificate before execution. All as per pre approved by Engineer in-charge. For additional technical parameters of products/ work , refer Annexure \\"A\\" attached with this BSR .100 mm diameter Submersible pump shall have following HP Rating, phase, Head range, Discharge range respectively.3.0 HP, 3-Ø, (54 -95)Mtr, (250-50) LPM |
| 6 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank ISI : 12701 marked with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank |
| 7 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete: |
| 8 | SITC of Contactor OEM Fabricated DOL/Star-Delta Starter panel with switchgear selection as per Type-2 Cordinatiom Chart and made out from 1.6 mm thick powder coated CRCA sheet, enclosure comprising of over load protection relay, short circuit & single phasing protection, Illuminated ON / OFF push buttons, ammeter, voltmeter, indicating lamps etc. suitable for following rating motors complete in all respect. All as per pre approved by Engineer in-charge. For additional technical parameters of products/ work , refer Annexure \\"A\\" attached with this BSR .For single phase Submersible / Monoblock pump 2.0 HP to 3.0 HP (DOL starter) |
| 9 | Providing & Laying of Polypropylene rope Confirming to IS:5175 for submersible pump of following sizes. complete in all respect. All as per pre approved by Engineer in-charge. For additional technical parameters of products/ work , refer Annexure \\"A\\" attached with this BSR12mm (suitable up to 50 mm OD pipe) |
| 10 | Providing & Laying P.V.C. / XLPE insulated & P.V.C. sheathed Un-Arrmoured Aluminium cable confirming to IS:1554 P-I / IS :7098 P - I of 1.1 KV with H4- Grade electrolytic aluminium conductor confirming to IS 8130 of purity >99.6 %, Inner / outer sheath confirming to IS:5831 in existing RCC / Hume / Stoneware / PVC pipe/ open duct/cable trench / Cable tray (with cable tie) including testing etc. as required of following size. OEM must have it's own in house NABL accrediated Laboratory for testing procedure as per IS:10810. For additional technical parameters of product / work refer Annexure 'A' attached with this BSR 10.0 Sq. mm 4 core |
| 11 | P/Laying ISI marked P.V.C. insulated submersible cable confirming to(IS:694) and as per IS 8130 : 2013 of 1.1 kV grade . Wire should be made from 99.90 % purity copper, stranding in acc. to IS:8130/IEC 60228 for lower watt loss , oxygen free for less chances of oxidization, insulation PVC type A/C/D , flame retardant as per IS 10810-53, better amperage rating as per IS:3961 part 5, existing pipe / open trench / Cable tray / on surface including making connection etc. as required. For additional technical parameters of product / work refer Annexure 'A' attached with this BSR 4.0 Sq.mm 3 core flat / Round |
| 12 | Supply and fixing of tube well cover of M.S. sheet (6mm thick) with nuts and bolts complete for casing size:150 mm dia Please Enable Macros to View BoQ information |