| 1 | Clearing Grass and Removal of Rubbish up to a distance of 50 metres outside the periphery of the area. |
| 2 | Construction of embankment with material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to achive the dry density not less then 97% as per table 300-2. work should be done as per MORTH & H Specification Clause 305 complete in all respects. |
| 3 | Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of table 300-2 for subgrade construction. |
| 4 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres |
| 5 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m |
| 6 | Construction of granular sub-base by grade-1 for providing well graded material from approved quarry , spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density complete as per Technical Specification Clause 401. |
| 7 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 8 | Construction of earthen shoulders with material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to the desired dry density not less then 97% as per table 300-2. work should be done as per MORTH & H Specification Clause 305 complete in all respects. |
| 9 | Providing and applying primer coat with bitumen emulsion (SS2) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mannual means. |
| 10 | Providing and applying tack coat with bitumen VG-10 using Bitumen Boiler with sprayer at the rate of 0.30 kg per sqm on the prepared surface cleaned with hydraulic broom as per MoRT & H Specifications Clause 503 complete in all respects. |
| 11 | Providing and laying dense graded bituminous macadam Grading 2 with Batch type hot mix plant producing 120 TPH using crushed aggregates from Kabrai quarry of specified grading, premixed with bituminous binder VG_30 @ 4.5 % , transporting the hot mix to work site,laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled and tandem roller to achive the desired compaction as per MORTH & H Specification Clause 505 complete in all respects. |
| 12 | Providing and laying bituminious concrete Grading 2 with Batch type hot mix plant producing 120 TPH using crushed aggregates from Kabrai quarry of specified grading, premixed with bituminous binder VG_30 @ 5.4%, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, tandem roller and Pneumatic Tyre roller to achive the desired compaction as per MORTH & H Specification Clause 507 complete in all respects. |
| 13 | Providing and laying of interlocking concrete block pavament M-30 Mpa compressive strength thickness 80 mm over prepared sub base / Base and prepared over sand bed surface including all labour T&P etc. required for proper completion of work.( Rate excluding sub base / Base ) |
| 14 | Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and back filling in trenches with excavated suitable material.. |
| 15 | Providing reinforced NP3 350mm cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets |
| 16 | Laying reinforced NP3 350mm cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets |
| 17 | Providing reinforced NP3 600mm cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets |
| 18 | Providing reinforced NP3 1000mm cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets |
| 19 | Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed, placed in foundation and compected by vibration including curing for 14 days. |
| 20 | Laying of Brick Bats in Cusion |
| 21 | Granular Materials (OBB) Fillings in trenches as per drawing and technical specification clause 305.3.9 on the sides of Hume Pipe. |
| 22 | Brick masonry work in 1:3 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical speficiations clauses 600, 1202 & 1203 |
| 23 | Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification clauses 613.3 , 1204 and 1208.4 |
| 24 | Providing Weep holes in Brick masonary/Plain/ Reinforced Concrete abutement, wing wall/return wall with 100mm dia AC pipe, extending through the full width of Structure with slope of 1V:20H towards drawing force. Complete as per drawing And Technical Specification. |
| 25 | Furnishing and Placing Reinforced Cement Concrete (RCC Grade M20) |
| 26 | Providing and laying reinforced cement concrete in super structure as per drawing and technical specifications clause 800, 1205.4 and 1205.5 (M-25) |
| 27 | Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications |
| 28 | Drainage spouts complete as per drawing and technical specification |
| 29 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification. |
| 30 | Kerb Stone |
| 31 | 5 year Maintenance Please Enable Macros to View BoQ information |