| 1 | Carriage of sub station structure by private carrier from EFU Naini Prayagraj to 220KV Sub Station Harahua . Job includes loading of material by shifting of these from storage place to road side, safely loading of these on vehicle, transportation of materials from EFU Naini Prayagraj to 220KV S/S HARHUA by private vehicle having one side distance approx. 140Kms. Unloading of material from vehicle safely and shifting these to store and proper stacking. (Rate includes all labour, T&P charges and all associated work to perform the job satisfactorily) |
| 2 | Dismantling of PI and its structure including with all assosiate work |
| 3 | Erection of structure parts of Main & Auxiliary structure. The job consist to shifting of all material, structure parts, nut bolts washers etc from store to work site, erection of structure as per relevant drawing and practices. |
| 4 | Erection of following equipments as per instruction manual of various equipments including its shifting from the store to site including other associated works to complete the job satisfactory. |
| 5 | 36 KV VCB |
| 6 | 36 KV CT ( Metering ) |
| 7 | 36 KV CT Junction Box (Metering) |
| 8 | 36 KV CT(Protection) |
| 9 | 36 KV CT Junction Box (Protection) |
| 10 | 36 KV LSI |
| 11 | 36 KV LSI Junction Box |
| 12 | 36 KV BSI |
| 13 | 36 KV BSI Junction Box |
| 14 | 36 KV PI |
| 15 | 33 KV C&R Panel (Numerical Type) |
| 16 | Laying of D/C 33 KV XLPE Power cable of size 3Cx300 sq.mm below 1000mm from ground level including excavation of trench and laying of cable and putting Ist class bricks on its 75mm edge along with cable on both side. Filling the same with ganga sand and then putting bricks on 380mm/patiya to cover the trench and then filling with earth including cost of bricks sand miscellaneous and all other associated work to complete the job satisfactorily. |
| 17 | Hoisting of 33 KV 3Cx300 sq.mm cable on pole/structure through GI pipe of size 6\\"(150mm) dia 3 mtr long including its jumpering with the help of suitable size of aluminium lugs. |
| 18 | Termination of jointing of above power cable by 3Cx300 sq.mm cable jointing kit O/D type and all other associated works to complete the work satisfactorily as per technical specification |
| 19 | Fabrication fixing and fitting of cable structure in shape of H-pole, 3 mtr long including its grouting with RCC of size 150x150x150mm in ratio 1:4:8 including all men material except structure/angle. |
| 20 | Jumpering of following bay equipments with the help of ACSR Panther conductor including cutting bending clamping with all other associated work from main bus to outgoing isolators for all phases. |
| 21 | Laying of following sizes of control cable in the cable trenches from C&R Panel to various type of equipments, junction boxes in switch yard as per cable schedule, its clamping/binding at every two meter distance with aluminium sticks 25x1mm size including carriage of cable drums from store to laying site and shifting back to store and all other associated work to complete the job satisfactorily as per tech. specification: |
| 22 | 2x2.5mm²Control Cable |
| 23 | 4x2.5mm²Control Cable |
| 24 | 6x2.5mm²Control Cable |
| 25 | Termination of following size control cable as laid above as per cable schedule including making necessary holes in glands plate of junction boxes , supply and fixing of cable gland ferrule of appropriate size and quantity respectively for each core of cable and its termination with crimping type lugs including lugs, ferrules & other minor accessories to complete job satisfactory |
| 26 | 2C x 2.5 mm² |
| 27 | 4C x 2.5 mm² |
| 28 | 6C x 2.5 mm² |
| 29 | Fabrication of electrode by 40 mm dia MS rods in length of 3 mtr by making an edge at one end for ease in piercing below 1200mm into the ground using wooden hammer completely at all the junction points along with welding & painting at outer periphery of earth mat as per relevant IS (M.S. round bar shall be provided by department). |
| 30 | Cutting straitening bending laying of 75x10 mm MS flat for earthing of main structures including welding with main earth mat below 500-700 mm of ground level with object to earth excavation of trenches its back filling, painting with one coat of red oxide primer and two coats of synthetic enameled green colour with all cost of MS flat, Paint, T&P required for completion of work. |
| 31 | Earthing of trench along with 50x6mm MS flat after cutting and welding with cable rack and trench with all cost of MS flat, including painting with one coat of red oxide primer and two coats of synthetic enameled paint. |
| 32 | Interconnection of the earth mat laid with the existing earth mat of the 220 KV S/S Harahua at 10 specified point by welding as that complete earth mat acts in coherent manner to provide proper earthing of the substation. |
| 33 | Fabrication of display board made of M.S. angle iron 50x50x6mm, 3 long support and M.S. board of 2'x1' M.S. sheet 18 gauge and M.S. flat iron 25x6mm size 2'x1' welded on M.S. sheet after then M.S. pipe of 1.5\\" dia. fitted around M.S. flat on the sheet board and 0.5\\" dia M.S. pipe 4\\" long welded in M.S. angle iron from two places at one side and two at other to complete the display board. Digging pit size 2'x2'x3' and grouting above board with 1:2:4 cement, ballast, sand ratio and making plinth of size 1'x2'. Board shall duly painted by yellow color and equipment name shall be written in black. |
| 34 | Integration of newly contructed 33kv bay with IEC 61850 based SCADA system. The work includes SLD generation for feeder bay in existing HMI,bay IEDS, ICS files configuraration data base creation for newly bay ,event alarm greeration ,interlocks and soft logics configuration and testing if any GPS time synchronisation etc. |
| 35 | Supply |
| 36 | PG clampTarantull to Zebra made of LM-6 alloy four bolted type complete with good quality nut bolt washer and spring washer exactly as per sample in ready to use condition. |
| 37 | PG clamp Zebra to Zebra made of LM-6 alloy four bolted type complete with good quality nut bolt washer and spring washer exactly as per sample in ready to use condition. |
| 38 | PG clamp Panther to Panther made of LM-6 alloy four bolted type complete with good quality nut bolt washer and spring washer exactly as per sample in ready to use condition. |
| 39 | PG clamp Zebra to Panther made of LM-6 alloy four bolted type complete with good quality nut bolt washer and spring washer exactly as per sample in ready to use condition. |
| 40 | Supply of GI Nut bolt of Size 16x40mm |
| 41 | Supply of GI Nut bolt of Size 16x45mm |
| 42 | Supply of GI Nut bolt of Size 16x50mm |
| 43 | Supply & fixing of 150W outdoor type flood light complete fitting with all fixing accessories including bracket and clamps of Philips/Crompton/Havells/Bajaj/Halonix make. Original warranty card should also be submitted along with above material. |
| 44 | Supply of 75x10mm MS Flat |
| 45 | Supply of 50x6mm MS Flat |
| 46 | Supply of 25x6mm MS Flat |
| 47 | MS Round Bar 40MM |
| 48 | Supply of 3Cx300 sq. mm high conductivity alluminium conductor XLPE cable armoured 33kv cable |
| 49 | 36 kv termination kit for3c x300 sq.mm XLPE cable (out door) |
| 50 | supply GI Pipe B class size 150mm (6\\"dia) |
| 51 | Fire Extinguisher carbon dioxide (CO2) as per latest IS 22.5 kg |
| 52 | Fire Extinguisher carbon dioxide (CO2) as per latest IS 4.5 kg |
| 53 | Perforated tray size 225 mm |
| 54 | Perforated tray size 75 mm Please Enable Macros to View BoQ information |