| 1 | Works Details |
| 2 | Providing & Fixing of Gate Roller incl. ,Pin, GM Bush with the help of welding machine, welding rods , Gas cutting Machine, Diesel Generator, Manpower, Transporation, lifting system complete in all repect. |
| 3 | Repairing of Gate Roller incl. Disassembling, Pin & GM Bush fitting & refitting back with the help of welding machine, welding rods , Gas cutting Machine, Diesel Generator, Manpower, Transporation, lifting system complete in all repect. |
| 4 | Fitting/Turn Back Master Gear back to size in axle/shaft after build it up with welding & turning; incl. Unbolt & opening Gear box casing, Mounts it using transmission jack or lifting equipment & shift to workshop, Diassemble internal compontent such as shaft, gears, bearings and selecotor forks and repair and re assembling of all internal parts , shift back to Site & fit in Gear box casing with the help of welding machine, welding rods , Gas cutting Machine, Diesel Generator, Manpower, Transporation, lifting system complete in all repect. |
| 5 | Providing & Fixing of Bottom Rubber Seal 80mm x 12mm incl. Nut & Bolts , Welding with mchine, Diesel Generator with HSD, Cutting machine with cutting blade, oxygen cylking, transportation at all risk & cost complete in all respect |
| 6 | Providing & Fixi ng of Gate Side Rubber Seal (p-Type) 5\\"x1.5\\"x 12mm incl. Nut & Bolts , Welding with mchine, Diesel Generator with HSD, Cutting machine with cutting blade, oxygen cylking, transportation at all risk & cost complete in all respect |
| 7 | Repairing of Master gear by making New Teeths on its periphery incl. Unbolt & opening Gear box casing, Mounts it using transmission jack or lifting equipment & shift to workshop, Diassemble internal compontent such as shaft, gears, bearings and selecotor forks and repair of master gear and re assembling of all internal parts , shift back to Site & fit in Gear box casing with the help of welding machine, welding rods , Gas cutting Machine, Diesel Generator, Manpower, Transporation, lifting system complete in all repect. |
| 8 | Alignment & Balancing of Gates with the help of manpower complete in all respect. |
| 9 | Adjustment of rope drum assembly and re-setting of drum gears assembly. |
| 10 | Railing welding at Weak Joints including Welding with welding machine, Diesel Generator with HSD, Cutting machine with cutting blade, oxygen cylking, transportation at all risk & cost complete in all respect |
| 11 | Providing & Fixing of worm gear incl. Unbolt & opening Gear box casing, Mounts it using transmission jack or lifting equipment & shift to workshop, Diassemble internal compontent such as shaft, gears, bearings and selecotor forks and replacement Worm gear and re assembling of all internal parts , shift back to Site & fit in Gear box casing with the help of welding machine, welding rods , Gas cutting Machine, Diesel Generator, Manpower, Transporation, lifting system complete in all repect. |
| 12 | Charges for Hydra crane machine for Gate & Gear box assembly lifting, shifting & refitting after repair including HSD, Manpower, transportation complete in all respect at all risk & cost |
| 13 | Providing & Fixing of Shaft Coupling joining Gear box assembly with Drum box assembly incl. Unbolt & opening Gear box casing, Mounts it using transmission jack or lifting equipment & shift to workshop, Diassemble internal compontent such as shaft, gears, bearings and selecotor forks and replacement of shaft coupling and re assembling of all internal parts , shift back to Site & fit in Gear box casing with the help of welding machine, welding rods , Gas cutting Machine, Diesel Generator, Manpower, Transporation, lifting system complete in all repect. Please Enable Macros to View BoQ information |