| 1 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : |
| 3 | Removal of Excavated mulba, dismantled unserviceable material from the site of work by MT/Animal transport or other wise including loading /unloading complete job. |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: . All works upto plinth level 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 7 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Cold twisted bars. Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for: Suspended floors, roofs, landings, balconies and access platforms. |
| 11 | Centering and shuttering including strutting, propping etc. and removal of form work for: Walls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc. |
| 12 | Centering and shuttering including strutting, propping etc. and removal of form work for: Edges of slabs and breaks in floors and walls Under 20 cm wide |
| 13 | 12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) |
| 14 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 15 | Carriage of sand and Stone Agg. by Mech. Transport from source to site of work Including loading unloading and stacking 10 km Avg. Sand and Bajree. Please Enable Macros to View BoQ information |