| 1 | Compound Wall |
| 2 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge In cement mortar. |
| 3 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils |
| 4 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40mm nominal size). |
| 5 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix / Design Mix |
| 6 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. for upto floor five level for :Columns, pillars, posts and struts etc. |
| 7 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. ('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) Hot rolled deformed bars (IS : 1139). |
| 8 | Providing and fixing steel gate, grating , and grills made of angles, tees, square bars, flats,or black pipe with holdfast and fittings complete as per design and drawing including cutting welding and fabrication with priming coat of red oxide |
| 9 | Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish : 20mm thick. |
| 10 | Finishing wall with water proofing cement paint of approved brand and manufacture and or required shade to give an even shade including all scaffolding: New work (Two or more coats applied @ 3.84 kg/10 sqm). |
| 11 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : One or more coats on old work. |
| 12 | 120cm. high fencing with angle iron posts 50x50x6mm. placed at every 3 Mtr. apart 30cm. in ground embedded in cement concrete 1:3:6 (30x30x45cm) corner & every tenth posts to be strutted with 50x50x6mm angle iron provided with four horizontal lines and two diagonals of black barbed wire between two posts fitted and fixed with G.I. staple including earth work in excavation etc. complete. Extra for using galvanized barbed wire instead of black barbed wire. |
| 13 | Providing and fixing expansion joint board for building RCC column beams, walls, slab of Polyethylene foam of density 30 to 35 Kg/m3 of Armour Board. 40 mm Thick |
| 14 | Refebrication work with existing steel work including cutting, welding & refebrication as per requirement with fixing at site complete as per direction of Engineer In charge |
| 15 | Conversion of Roofsheet |
| 16 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge: In cement mortar |
| 17 | Dismantling roofing including ridges, hips, valleys and rafters etc. and stacking the within 50 meter lead of: Asbestos Sheet. |
| 18 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plater, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50metres lead. |
| 19 | Repair to stone masonary in cement sand mortar 1:6 with old and new stone. |
| 20 | Repairs to plaster of thickness 12mm to 20mm in patches of area 2.5 sq. metres and under including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complate including disposal of rubbish to thw dumping ground within 50mm\ lead With cement mortar 1:4 (1 cement : 4 coarse sand) |
| 21 | White washing with lime to give an even shade including all scaffolding:Old work (two or more coats) including scrapping old surface and repairing with putty where ever necessary. |
| 22 | Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in :Cement mortar 1 : 6 (1 cement : 6 coarse sand) |
| 23 | Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 stone aggregate 10mm and down gauge) including finishing with cement mortar 1:3 ( 1 cement: 3 fine sand) as per standard design: |
| 24 | Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish : 20mm thick. |
| 25 | Finishing wall with water proofing cement paint of approved brand and manufacture and or required shade to give an even shade including all scaffolding: Old work (One or more coats) |
| 26 | Supply and installation of Multi Rib Proofing/cladding Sheet Manufacture out of 0.50mm TCT (Total Coated Thickness) high tensile Zinc aluminum alloy coated galvalume steel (as per 150gsm zinc aluminum coated 550Mpa tuekd strength) confirming to IS: 1397/astm A-792 sheet to have wide pens 30mm high NB at 250 centre and centre width of 1020mm sheets be casted with regular modified polyster system on a continuous with line on centre for face and with a polyster coating respectively sheet shall have proportionality with siphoned plate made to prevent leakage sheet shall be fixed by more of sell drilling lift tapping hot dip zinc coated hox head fasterner of size 12x14x55mm long. The sheet shall be supplied in cost one length and for a minimum up to 12mts with all scaffolding. Add extra for 0.60mm TCT (Total Coated Thickness) high tensile Zinc aluminum alloy coated galvalume steel sheet in place of 0.50mm thick |
| 27 | Less :- Credit for dismantled item in Chhabra (Old Steel @ 25/Kg @ *200 = 5000.00) = 5000.00 |
| 28 | Note :- (1) The quantity of dismantled material are tentative which my vary depending upon actual weightment/counting/measurement respectively. Please Enable Macros to View BoQ information |