| 1 | Construction of Subgrade and earthen shoulders with apporved material obtained from borrow pits with attl ifts and leads transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300.2 as per Tecnical Specification Clause 303.1 |
| 2 | Construction of embankment with approved material obtained from borrow pits with atti ifts upto 1.5m transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300.1 and 3001.2 with a lead upto 1000m as per Tecnical Specification Clause 301.5 |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing bymix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specificatin Clause 401. |
| 4 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 4.7-405(2) |
| 5 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 4.7-405(3) |
| 6 | Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at rate of 0.70- Kg/Sqm using mechanical means as per Technical Specification Clause 5.1-502. |
| 7 | Providing and applying tack coat with Bitumen (VG-10) using emulsion distributor at the rate of 0.35 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 5.2-503(iii) |
| 8 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type as per Technical Specification Clause 5.9-508 |
| 9 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 5.12-510. |
| 10 | Brick edging on both sides of the road of first class bricks 8 cm (3\\") wide and 12 cm. 4½\\"deep laid with mud mortar including labour and supply of. bricks finished to required template and proper alignment and also including dressing and ramming the excavated earth as directed by Engineer-in-Charge. |
| 11 | Excavation for roadway in soil using mechnical means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 |
| 12 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 |
| 13 | Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications Clause no.600,1200&1203 |
| 14 | Supply & laying of compacted 40 mm gauge brick ballast around and below hume pipe (As per N.S. Item No. 2 C) |
| 15 | Struck pointing with cement mortar consisting of one part cement and 2 part of fine sand of 1.25 F.M. on brick work including supply of all material, labour and T & P etc. required for proper completionof the work. (S.I.No. 574) |
| 16 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 |
| 17 | Supply of R.C.C. Hume Pipe NP-3 1000 mm dia |
| 18 | Supply of R.C.C. Hume Pipe NP-3 350 mm dia |
| 19 | Laying & Fixing of R.C.C. Hume Pipe (NP3) as per direction of E/I H.P.1000 mm dia NP3 |
| 20 | Laying & Fixing of R.C.C. Hume Pipe (NP3) as per direction of E/I H.P.350 mm dia NP3 Please Enable Macros to View BoQ information |