|
| 1 | सी0सी0रोड व कवर्ड नाली |
| 2 | Earthwork in excavation by mechanicalmeans (Hydraulic excavator) /manualmeans in foundation trenches or drains(not exceeding1.5minwidthor10sqmonplan), including dressing of sidesandramming of bottoms, lift upto 1.5 m,including getting out the excavated soiland disposal of surplus excavated soil asdirected,within aleadof50m. (UPPWDSOR sl. no. 2.8.1) |
| 3 | Earth work in filling of ordinary soil(including royalty) by mechanicaltransport up to alead of 5km also includingramming and watering of the earth inlayers not exceeding 20 cmin trenches,plinth,side soffoundationetc.completeasper analysis of rates |
| 4 | Providing and laying cement concrete1:6:12(1cement: 6C.sand:8gradedbrickaggregate40mmnominal size.) includingsupplyofallmaterials,labourandT&Petcrequiredforpropercompletionoftheworkas per (UPPWD SOR sl no. 273) |
| 5 | First classbrickwork in1:4cement andcoarse sand of 1.25 FM mortar infoundationandplinth includingsupplyofallmaterials,labourandT&Petcrequiredforproper completionofwork (UPPWDSOR sl. no. 6.1.1) |
| 6 | 12mm thick plaster in1:4 incement andcoarse sand including including supplyofmaterials, labour, tools, plants etc.required for proper completion of thework.(UPPWD SOR sl. no. 13.4.1) |
| 7 | Providingandlaying cementconcrete1:2:4(1cement: 2C.sand:20gradedstoneaggregate20mmnominal size.) includingsupplyofallmaterials,labourandT&Petcrequiredforpropercompletionofthework(UPPWD SOR sl. no. 4.1.3) |
| 8 | Construction of granular sub-base byprovidingwellgradedmaterial, spreadingin uniformlayerswithmotor grader onpreparedsurface,mixingbymix inplacemethod with rotavator at OMC, andcompactingwith smoothwheel roller toachieve the desired density complete asper Technical Specification Clause 401. |
| 9 | Cementconcretepavementconstuctionofun- reinforced, dowel jointdat expansionand constuction joint only, plain cementconcrete pavement, thickness as peredesing,overapreparedsubbase,eith43grade cement or any other type as percaluse1501,2.2M30(Grade), provisionofcontraction and expansion, constractionjoint applying debonding strips, primerseailant, dowel bars, neer approaches tobridge/ culvert and constuction joints,bridge/ culvert and constuction joints,admixtrue. all respects as analysis of rates |
| 10 | R.C.C. work in slab in1:2:4 in cementcoarse sand&20mmgrade stone gritexcluding supply of reinforcement butincludingcostofcenteringandshutteringetc. all respects as pwd S.I. No. 5.1.3 |
| 11 | Mildsteel or iron inplainworksuchasreinforced concrete or reinforced, brickwork (whennot included in anover allrates) wrought to required shape asnecessary including bending for propercompletion of the work and includingsupply of steel its wastage bend hooks(UPPWD SOR sl. no. 504) |
| 12 | P/Fofdisplay/ inaugurationblackgraniteboardincludingletterwritingetc.Allcost complete. Please Enable Macros to View BoQ information |