| 1 | Earthwork in excavation for structures i/c all comp. as SR No.251 |
| 2 | Providing and laying cement concrete 1:6:12 i/c all com as SR No.273 |
| 3 | First class brick work in 1:4 cement and fine sand i/c all comp. as SR No.305(a) |
| 4 | Furnishing and placing reinforced cement concrete in super structure as per drawing and Technical specification. M20 (1:2:4) SR No. 283 |
| 5 | Supplying fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and Technical specifications clauses SR No. 504 |
| 6 | Plastering with cement mortar (1:4) 12 mm thick on brickwork in substructure/superstructure. SR .584 |
| 7 | Finishing walls with white bases putty i/c all comp. D.S.R. 13.46.1 |
| 8 | Finishing walls with w.p.c. paint i/c all comp. as SR No. 660+661 |
| 9 | Providing and laying verified tiles in floor i/c all comp. |
| 10 | Solar water System with Storage facility (1 HP 160V Solar Submersible Pump, etc.) |
| 11 | Boring with 100mm dia casing pipe for hand pump/tubewell… |
| 12 | 100mm dia pipe PVC lowering in boring (DSR 2021-23.3.1) |
| 13 | Site Clearance and other unforeseen items. |
| 14 | Distribution System-Pipeline Excavation (Ordinary soil) Excavation of earth in ordinary soil for pipe line and using treches including lift upto 1.50m and lend upto 50m and refilling watering ramming of the excavated earth into the trenches and also disposal of surplus eath upto 50m from the center of trenches including supply of all materials labour t&P complete as per instructions of engineer in charge .Ordinary soil @ 70% of total excavation |
| 15 | Mixed doil with kankar @30% of total excavation |
| 16 | Construction of chambers.Sluice valve chamber (surface box type) |
| 17 | Air valve chamber 350(L)x350(W)x500(H)mm |
| 18 | Scour valve chamber dia up to 200mm-1000mm*1300mm |
| 19 | PRV Valve Chamber-1000x1200x1300 |
| 20 | Construction of single top pillar type stand post as per |
| 21 | Distribution System-Pipeline Excavation.Supply of following sizes for distribution system conforming to latest/relevant IS 4984-1995 specification with all joints materials and specials conforming to latest/relevant IS specification including F.O.R. Detination and all taxes and insurance etc. With loading, unloading and carting upto site of work, also including special for these pipes and loweing them into the trenches and laying true to alignment and gradient and jointing etc. complete as per instruction75mm dia HDPE Pipe PN-6, Class PE-100 |
| 22 | 63mm dia HDPE Pipe PN-6, Class PE-100 |
| 23 | Valves & Fittings.Supply and carting upto site of work of the following dia butterfly sluice valves, class I working pressure 10Kg/c conforming to IS:780/1969 or its latest amendments, In valve fittings & dismantelling joints as per requirement destination, and lowering them into the already prepares trenches, fixing in position and jointing them with pipelin testing etc, complete and also including supply and join materials etc. complete including all taxes as per istruct engineer In charge. Sluice valve-80mm dia. |
| 24 | Sluice valve-80mm dia.Supply and installation, testing etc. Ol single/double ball type air valve confirming to Intest/relevant IS specification including all taxes and insurance, carting upto site of work and lowering them into the trenches, fixing in position and jointing them with pipelines and testing etc. complete (including supply of jointing materials ans valve fittings etc.) as per instruction of engineer in charge.20 MM |
| 25 | Rising Main.Supply of following sizes of main/distribution system conforming to latest/relevant IS 8329/2000 specifications with all jointing material such as specials conforming to latest/relevant IS specification, suitable for DJ pipes as per IS-1239/2000 and IS-8329/2000 or their latest amendment including F.O.R. destination and all in taxes and insurance etc. with loading, unloading and carting upto site of work, also including specials for these pipes and lowering them into the trenches and laying true to alignment and gradient and cutting of pipes for making up the length but excluding the cost of trenches all complete as per engineer of incharge.100mm dia K-7 including bypass |
| 26 | Excavation Work.Excavation of earth in ordinary soil for pipe line and rising main treches including lift upto 1.50m and lend upto 50m and refilling watering, ramming of the excavated earth into the trenches and also disposal of including supply of all materials labour, T&P etc.complete as per instruction of engineer in charge. |
| 27 | Dismanteling of following type of surfaces including sorting out and slacking of serviceable materials and disposal of unservisable materials upto a distance of 50m as per instruction of engineer in charge.Interlocking Road |
| 28 | CC Road |
| 29 | Reinstatement of the following type of road surface with old and new materials Including supply of all materials, labour, T&P etc required for proper.Interlocking Road |
| 30 | CC Road |
| 31 | SUPPLY AND FIXING 3 NO SOLAR WATER COOLER WITH 150 X 150 WATER COOLER COMPLETE ALL RESPECT Please Enable Macros to View BoQ information |