| 1 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls |
| 2 | Doors & windows including removal of frames, hinges and fastenings |
| 3 | Precast Concrete Block masonry using Autoclaved Cellular Aerated Concrete Block of size 600x200x150mm conforming to IS 2185 (Part 3) : 1984 with Self Curing AAC Joint Mortar for Partition Wall of non load bearing type in accordance with IS 6041:1985 including neat finishing, etc., complete complying with standard specification and as directed by the departmental officers. |
| 4 | In Ground floor |
| 5 | In First floor |
| 6 | In Second floor |
| 7 | Hire charges for 16 days temporary fire proof G.I Sheet view cutter Right and Left side from Sterile zone till the end of the structure fixing over the MS pipe and finishing with white cloth and tying rigidly with MS Clamp, the same was carried out as per the direction of the Departmental officers and removing the same after the function is over. |
| 8 | Re-fixing the partition with necessary rubber beadings Alu. clips, of size 17.27x17.15x1.40mm@ 0.175 kg/m and including cost of all materilas, labours, power consumptions required for fabrications,drilling holes in RCC column, slab, masonry walls wherever necessary with powerdrills to the required extent and make good to the original condition after fixing etc., complete complying with standard specification and as directed by the deparmental officers. |
| 9 | Hire charges for 16 days for temporary weld mesh of size 2.5cmx2.5cm with M.S angle of size 25mmx25mmx5mm and square tube of size 25mmx25mmx3mm for lateral support to the counting hall allround etc., complete complying with standard specification, including all labour charges, transportation diamantling and removing etc., complete and as driceted by the deptl officers and removing the same after the function is over. |
| 10 | Hire charges for 16 days for temporary fixing in plywood with 12mm thick with windows and ventilator closing with reeper, nails and etc., and removing all the materials after counting over. |
| 11 | Hire charges for 16 days for barricading arrangements using 10 to 13cm dia casurina props 75cm c/c for vertical post and 60cm below ground level embedding and 1.90 above ground level fixing and tying 5cm to 8cm dia casurina props five rows horizontally @ 0.38m c/c and tying with new coir rope and removing all the materials after counting over. |
| 12 | Supplying and Fixing of Pigion box using plywood materials making box section vertically and tied horizontally at sheet necessary sizes etc., complete complying with standard specification, including nails, adhesives, all labour charges, transportation charges etc.,complete and as driceted by the deptl officers and removing the same after the function is over. |
| 13 | Providing Q Manager carried out as per the direction of the Departmental officers and removing the same after completion of the event. |
| 14 | Hire & Labour charges for VIP Sofa 3 seater sets with necessary accessories carried out as per the direction of the Departmental officers and removing the same after completion of the event. |
| 15 | Hire & Labour charges for VIP Sofa 2 seater sets with necessary accessories carried out as per the direction of the Departmental officers and removing the same after completion of the event. |
| 16 | Hire & Labour charges for VIP Chairs with necessary accessories carried out as per the direction of the Departmental officers and removing the same after completion of the event. |
| 17 | Hire & Labour charges for VIP Table with necessary accessories carried out as per the direction of the Departmental officers and removing the same after completion of the event. |
| 18 | Hire charges for 16 days for temporary Watch tower using casurina props vertically for posts 25' -4 Nos and tied horizontally at top for purlins with roof GI sheet necessary slope and fixing watch tower above the purlins etc., complete complying with standard specification, including all labour charges, transportation dismantling and removing etc.,complete and as driceted by the deptl officers and removing the same after the function is over. |
| 19 | Labour and hire charges for supplying long table as per the direction of the Departmental officers and removing the same after counting is over. |
| 20 | Labour and hire charges for supplying wooden table as per the direction of the Departmental officers and removing the same after counting is over. |
| 21 | Providing signage board sheets necessary size with sun board printing and removing the same after the function is over as directed by the departmental officers. |
| 22 | Providing Location map signage board sheets necessary size with sun board printing and removing the same after the function is over as directed by the departmental officers. |
| 23 | Hire charges for temporary MS Sheet with Red and green carpet for function floor site carried out as per the direction of the Departmental officers and removing the same after function over. |
| 24 | Hire charges for temporary toilet for function site carried out as per the direction of the Departmental officers and removing the same after function over. |
| 25 | Hire charges for SS Sink with taps, necessary PVC pipes with specials carried out as per the direction of the Departmental officers and removing the same after completion of the event. |
| 26 | Supply of Plastic buckets and mugs including loading, unloading and transportation charges etc., complete |
| 27 | Supplying and fixing in position 15mm dia brass PVC screw down tap / Pillar tap (heavy duty) of approved make conforming to BIS specifications and quality including cost of shellac, thread, etc., complete complying with standard specification and including cutting and threading wherever necessary. (Taps should be got approved by the Executive Engineer before use on the works) |
| 28 | Supplying and fixing in position Health facet of approved make conforming to BIS specifications and quality including cost of shellac, thread, etc., complete complying with standard specification and including cutting and threading wherever necessary. |
| 29 | Distempering the old wall and ceiling one coat with best oil bound distember of approved quality including preparation of surface, the rate includes cost of brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers. - For two coat including scraping |
| 30 | Painting Old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with Two coats of best approved first quality and colour of synthetic enamel paint in all floors etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) - two coat |
| 31 | Painting Old wood work with Two coat of synthetic enamel ready mixed paint of approved quality and colour in all floors etc., complete complying with standard specification and as directed by the departmental officers. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) - two coat |
| 32 | Hire charges for temporary PVC tank for function site carried out as per the direction of the Departmental officers and removing the same after function over. |
| 33 | Hire charges for temporary PVC tank stand for function site carried out as per the direction of the Departmental officers and removing the same after function over. |
| 34 | Hire charges for temporary lifting the voting machine (manual operating system) for function site carried out as per the direction of the Departmental officers and removing the same after function over. |
| 35 | Towards engaging JCB/Bulldozer or Levelling the site, removing existing bushes, strubs, and uprooting small plants and busy plants and levelling the earthern shoulders and removing debries from the work site area and filling the same in the low laying area with the old campus cleaning and levelling the site etc., complete. |
| 36 | Hire charges for supplying, placing plastic chairs of best quality including loading, unloading, stacking placing and removing after the counting is over. |
| 37 | Labour and hire charges for supplying long table as per the direction of the Departmental officers and removing the same after counting is over. |
| 38 | Hire charges for supply of RO water cane with Drinking water remove the same after the function is over as directed by the departmental officers. |
| 39 | Hire charges for supply of RO water cane pump with Drinking water remove the same after the function is over as directed by the departmental officers. |
| 40 | Hire charges for supply of RO water cane bubble top with Drinking water remove the same after the function is over as directed by the departmental officers. |
| 41 | Hire charges for supplying Steel table as per the direction of the Departmental officers and removing the same after counting is over. |
| 42 | Hire charges for supplying Steel chair as per the direction of the Departmental officers and removing the same after counting is over. |
| 43 | Supply of labour for shifting the furnitures, tables, cleaning the vegetation, cleaning floor etc from the counting hall, strong room etc to the places as directed by the officials and placing them back in the places etc., |
| 44 | Mazdoor Gr- I |
| 45 | Mazdoor Gr- II |
| 46 | Plumber Gr- II |
| 47 | Add GST Please Enable Macros to View BoQ information |