|
| 1 | Development of Park near Masjid Sharief Ghat Mohalla Awantipora. |
| 2 | Cleaning grass and removal of the rubbish outside the periphery of the area lead upto 3.0 kms as directed by Engineer-incharge. |
| 3 | Supplying and filling of good earth obtained from borrow pits with all lifts and leads, transporting to site, spreading grading to required slope and consolodating by ramming & watering as directed by Engineer-in-charge. |
| 4 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes (for grill work boundary wall, repair). |
| 5 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc complete On steel work (Existing Grill ) |
| 6 | Development of Park near GHS Ghat Mohallah Awantipora |
| 7 | Cleaning grass and removal of the rubbish outside the periphery of the area lead upto 3.0 kms as directed by Engineer-incharge. |
| 8 | Supplying and filling of good earth obtained from borrow pits with all lifts and leads, transporting to site, spreading grading to required slope and consolidating by ramming & watering as directed by Engineer-in-charge. |
| 9 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth anddisposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : |
| 10 | Providing & Laying of stone soling (dully hand packed)including watering dressing and ramming with all carriages loading un-loading and stacking etc complete incl Head load upto 200 meters |
| 11 | Providing & laying in position cement concrete of specified grade excld. The cost of centring and shuttering all work upto plinth level(1:4:8 coarse sand 40mm nominal size crushed stone agg.) |
| 12 | P/L in position specified grade of reinforced cement cencrete excld. The cost of centring, shuttering, finishing and reinforecement-All work upto plinth level. 1:1.5:3 graded stone agg. 20mm nominal size |
| 13 | Reinforcement for RCC work incld straightning, cutting, bending, placing in position & binding all complete (Thermo-mechanically treated bars) |
| 14 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 15 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns |
| 16 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes. |
| 17 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc complete On steel work. |
| 18 | Carriage of materails By Mech.Transport, from source to site of work |
| 19 | sand & Stone agg. for an avg lead of 5 km |
| 20 | Development of Footpath for park near GHS Ghat Mohallah Awantipora |
| 21 | Engagement of labours for site clearance removal of vegetative matter etc including disposal of dismantled material beyond MC limits.and as directed by EIC. |
| 22 | Providing & Laying of stone soling /Boulders (dully hand packed)including watering dressing and ramming with all carriages loading un-loading and stacking etc complete |
| 23 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 24 | Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colou r& pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand complete all as per direction of Engineer-in-Charge. 60mm thick cement concrete paver block of M-35 grade with approved colour, design & pattern. |
| 25 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 26 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns etc |
| 27 | Carriage of materails By Mech.Transport, from source to site of work |
| 28 | sand & Stone agg. for an avg lead of 5 km |
| 29 | Development of Herpora Nag Park at Awantipora. |
| 30 | Cleaning grass and removal of the rubbish outside the periphery of the area lead upto 3.0 kms as directed by Engineer-incharge. |
| 31 | Supplying and filling of good earth obtained from borrow pits with all lifts and leads, transporting to site, spreading grading to required slope and consolodating by ramming & watering as directed by Engineer-in-charge. |
| 32 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc complete On steel work. (Existing Grill ) |
| 33 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes (for grill work repair wall). |
| 34 | Engagement of Black Smith for repair and rectification of Existing Grill work as per the directions of Engineer-Incharge. |
| 35 | Engagement of Mason for repair and rectification of Fencing as per the directions of Engineer-incharge. |
| 36 | Development of Park near Mukdam Mohalla at Awantipora. |
| 37 | Cleaning grass and removal of the rubbish outside the periphery of the area lead upto 3.0 kms as directed by Engineer-incharge. |
| 38 | Supplying and filling of good earth obtained from borrow pits with all lifts and leads, transporting to site, spreading grading to required slope and consolidating by ramming & watering as directed by Engineer-in-charge. |
| 39 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc complete On steel work.(Excluding Grill work). |
| 40 | Development of Park Near PHE office Awantipora. |
| 41 | Cleaning grass and removal of the rubbish outside the periphery of the area lead upto 3.0 kms as directed by Engineer-incharge. |
| 42 | Supplying and filling of good earth obtained from borrow pits with all lifts and leads, transporting to site, spreading grading to required slope and consolidating by ramming & watering as directed by Engineer-in-charge. |
| 43 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth anddisposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : |
| 44 | Providing & Laying of stone soling (dully hand packed)including watering dressing and ramming with all carriages loading un-loading and stacking etc complete incl Head load upto 200 meters |
| 45 | Providing & laying in position cement concrete of specified grade excld. The cost of centring and shuttering all work upto plinth level(1:4:8 coarse sand 40mm nominal size crushed stone agg.) |
| 46 | P/L in position specified grade of reinforced cement cencrete excld. The cost of centring, shuttering, finishing and reinforecement-All work upto plinth level. 1:1.5:3 graded stone agg. 20mm nominal size |
| 47 | Reinforcement for RCC work incld straightning, cutting, bending, placing in position & binding all complete (Thermo-mechanically treated bars) |
| 48 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 49 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns |
| 50 | 12mm plaster of 1:6 mix (1 cement : 6 fine sand). |
| 51 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes. |
| 52 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc complete On steel work. |
| 53 | Finishing walls with acrylic smooth exterior paint of required shade onNew work (Two or more coats applied @ 1.67 liter/10sqm over and including priming coat of exterior primer applied @ 2.20kg/10sqm) |
| 54 | Carriage of materails By Mech.Transport, from source to site of work |
| 55 | sand & Stone agg. for an avg lead of 5 km |
| 56 | Development of Foot path for Booh Park Near PHE Awantipora. |
| 57 | Engagement of Welder /Black Smith for repair of fencing and refixing as per the directions of Engineer-Incharge. |
| 58 | Engagement of Labours for site clearance, removal of vegetative matter etc including disposal of dismantled material beyond MC Limits and as directed by EIC. |
| 59 | Providing & Laying of stone soling /Boulders (dully hand packed)including watering dressing and ramming with all carriages loading un-loading and stacking etc complete |
| 60 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 61 | Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colou r& pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand complete all as per direction of Engineer-in-Charge. 60mm thick cement concrete paver block of M-35 grade with approved colour, design & pattern. |
| 62 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 63 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns |
| 64 | Carriage of materails By Mech.Transport, from source to site of work |
| 65 | sand & Stone agg. for an avg lead of 5 km |
| 66 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 67 | Plantation and Development OF Green Avenue |
| 68 | Digging pits in all type of soil and refilling the same with the good earth(excavated/imported) & manure (organic manure/cow dung/ sludge in the ratio-of 3:1 (03 part of stacked volume of good earth in needed additionally to be paid separately after reduction of 20% of stacked volume of good earth & 8% stacked volume of mare.AVENUE / FLOWERING TREESPT SIZE- (a) 0.60m x 0.60m x 0.60m (LxBxD) |
| 69 | Earth pit to be added with 100 gms of Thimet 10G granule, to control termite attack (repeat the treatment after 06 months if termite persist) Flooding the pit basin with water including removal of rubbish and surplus earth, if any dressing with all lead and lift. |
| 70 | Supply and plantation of approved varieties of healthy disease-free stout stem & well-developed root system tree sapling of 5' -6 height with clear minimum height of 45' from basin /ground level after plantation. Staking the tree sapling up to 3/4 a height with appropriate strength of Bamboo stick. Lower 1 feet of stake chemical. (Services should be treated with anti-termite by portion of Gardening Expert to be utilised by the contractor) AVENUE / FLOWERING/SHADY TREES. |
| 71 | Maintenance of tree sapling, after plantation for 30 days or more AS minimum guarantee period for well establishment of tree sapling. Stacking to be continued till tree sapling attains the stem strength. Replacement of sapling casualties immediately |
| 72 | Afterward the regular maintenance for 1 year as per each standard specification. |
| 73 | Digging trenches of approved/desired size of LxW (45-50 cms) x (30-60 cms) in all type of soil. Refilling the tranches with good earth (excavated / imported) mixed with manure (cow dung/sludge/dump) in the ratio of 5:1 (05 part of stacked volume of good earth and 01 part of manure). Cost of manure /sludge and good earth if needed additionally to be paid separately, after reduction of 20% for good earth & 8% in stakes volume of manure. For termite treatment add Thimet10G granules @100 cms running its. Flooding the trench with water then rough & fine dressing of trenched area including removal of undesirable weeds 7 vegetation. |
| 74 | a) Hedge which saplings height- (0.45mts 0.60 Rmt (after planation) Density @07 Nos plants / running meters (staggard condition) |
| 75 | b) Maintenance the hedge of regular watering, trimming, & pruning for 30days initially. Replacement of sapling casualties immediately. |
| 76 | c) Afterward maintenance of hedge length for One (1) year as per standard maintenance specification. |
| 77 | Preparation of ground by trenching in all types of soil up to a depth of 30 cm including removal and stacking of serviceable material then disposing the surplus soil with all lead & lift, by spreading and levelling neatly making up the trenched area well Levelled filling with additionally supplied earth (if need). |
| 78 | Now rough dressing of trenched ground including breaking clods & flooding with water. |
| 79 | After 10-15 days removal of weeds / unwanted grass (motha etc) with roots & disposal of uprooted material, stone rubbish etc. With all lead & lifts. |
| 80 | Then fine dressing of ground. Spreading and mixing with the good earth (excavated/ imported) & manure (orgonic manure /cow dung sludge) in the ratio of 8:1 (08 part of good earth & 01 part of manure). Cost of manure / sludge and good earth if needed to additionally be paid separately, after reduction of 20% of stacked volume of good earth & 8% volume of manure. The area to be mixed with antitermite chemical / granules, Thimet 100@100-200 gm/sqm, if termite persists repeat the treatment after 06 months by surface spreading the chemical. |
| 81 | Grassing with selection no. 1 grass including watering & maintenance of the lawn for 30 days or more till the grass forms a thick lawn free from weeds & fit for moving including supplying of good earth if needed (the good earth shall be paid separately.) in rows 5 cm apart in either direction. |
| 82 | Afterward maintenance of lawn area, green & weed free for one (1) year with standard specification. |
| 83 | Edging with bricks (Class-1) laid in pcc (1:2:4) lengthwise, including required excavation, refilling consolidating with and packing spreading surplus earth neatly with all lead and lifts. |
| 84 | Logging pits in all type of soil and refilling the same with the good earth excavated/imported) & manure (organic manure/ cow dung/ sludge in the ratio-of 5:1 (05 part of stacked volume of good earth 01 part of manure). Cost of manure /sludge and good earth it needed additionally to be paid separately, after reduction of 20% for good earth & 8% in stakes volume of manure. leached pit to be mixed with ant termite chemical / granules Thamet 100 @ 50-100 grm/pita) Pit size 0.45 mts x 0.45 mts x 0.45 mts (LxBxD) |
| 85 | Supply and plantation of disease free, well established shrubs sapling size 0.45 to 0.60 mts (after plantation) |
| 86 | Appropriate stacking & initially maintenance for 30 days. Replacement of slapping causalities immediately |
| 87 | Afterward 01-year maintenance as per standard specification. |
| 88 | Sitting Garden Bench (35 N0.s) |
| 89 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. |
| 90 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth anddisposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : |
| 91 | Providing & Laying of stone soling (dully hand packed)including watering dressing and ramming with all carriages loading un-loading and stacking etc complete |
| 92 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 93 | Providing and placing 3 seater cast Iron bench with Arm rest 5 feet long wirh back support of approved design. |
| 94 | P/F of Retro-Refractory Boards. |
| 95 | Providing Retro-reflective regulatory sign board of size 900mm diameter made out of 2mm thick aluminum sheet, face to be fully covered with high intensity encapsulated lens type retro-reflective sheeting as approved by Engineer-in-charge. Letter, symbols, borders, etc. will be as per IRC:67 with required colour scheme on the boards and with the high intensity grade A. the aluminum sheet to be riveted to M.S. frame of angle iron of size 40x40x4mm. The boards will be fixed to 1 No. 50x50mm square post made of M.S. angle 50x50x4mm, 4m long welded to the frame with adequate anti-theft arrangement. Sheet work to be painted with two or more coats of synthetic enamel paint over an under coat (primer) and back side of aluminum sheet to be painted with two or more coats of epoxy paint including appropriate priming coat complete in all respects as per directions of Engineer-in-charge.informatory Sign boards. |
| 96 | Construction of View point/Rain Gazebo( 2 Nos.) |
| 97 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth anddisposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : |
| 98 | Providing & Laying of stone soling (dully hand packed)including watering dressing and ramming with all carriages loading un-loading and stacking etc complete |
| 99 | Providing & laying in position cement concrete of specified grade excld. The cost of centring and shuttering all work upto plinth level(1:4:8 coarse sand 40mm nominal size crushed stone agg.) |
| 100 | P/L in position specified grade of reinforced cement cencrete excld. The cost of centring, shuttering, finishing and reinforecement-All work upto plinth level. 1:1.5:3 graded stone agg. 20mm nominal size |
| 101 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 102 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes (As per design). |
| 103 | Providing and fixing Hi-rib Colour Coated galvanized iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.(0.50 mm thickness ) including ridge/valleys. |
| 104 | Reinforcement for RCC work incld straightning, cutting, bending, placing in position & binding all complete (Thermo-mechanically treated bars) |
| 105 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc complete On steel work. |
| 106 | P/F of ornamental type wooden Eaves boarding with high and shafaq work and carving of wood of approved pattern (Size 300x400mm) of Ist class Kail wood) including cost of nails and two or more coats of touch wood polishing complete job. |
| 107 | P/F of 12mm thick wooden panelling (T&G) of Ist class budloo wood knots including cost of head less nails with see holding charges and carriage of material including cost of wooden frame work budloo work 12mm thick plyboard and touch wood polishing (Two or more coats) complete in all respects. |
| 108 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns |
| 109 | Providing and laying gang saw cut of specified thickness, mirror polished pre- moulded and pre polished machine cut granite stone of required size and shape of approved shade, colour and texture in footpath, flooring cut granite stone of required size and shape of approved shade, colour and texture in footpath, flooring in road side plazas and similar locations, laid over 20mm thick base of cement mortar 1:4 (1cement : 4 coarse sand) including grouting the joints with white cement mixed with matching pigment, epoxy touch ups etc. complete as per direction of Engineer-in- Charge.18 mm thick |
| 110 | Carriage of materails By Mech.Transport, from source to site of work |
| 111 | sand & Stone agg. for an avg lead of 5 km |
| 112 | Construction of Drain near Park PHE office Awantipora. |
| 113 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth anddisposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : |
| 114 | Providing & Laying of stone soling (dully hand packed)including watering dressing and ramming with all carriages loading un-loading and stacking etc complete. |
| 115 | Providing & laying in position cement concrete of specified grade excld. The cost of centring and shuttering all work upto plinth level(1:4:8 coarse sand 40mm nominal size crushed stone agg.) |
| 116 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 117 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns |
| 118 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate. |
| 119 | Supply and filling of RBM/Quarry material of specified and required size as directed including dressing, ramming watering and compacting with power roller to required gradient and camber with carriage of all material involved loading, unloading and stacking complete. |
| 120 | Supply / laying of RCC Spun pipes of 450 mm dia including excavation and backfillig BWO RBM/Quarry material of spacified grade and size including ramming spreading and all carriages & loading, unloading complete |
| 121 | Carriage of materails By Mech.Transport, from source to site of work |
| 122 | sand & Stone agg. for an avg lead of 5 km Please Enable Macros to View BoQ information |