|
| 1 | Dismantling taking out GI pipe from PCC support/Trenches for repair/ replacement/ relaying for bore of pipe 25 mm complete all as specified and directed. |
| 2 | Supply, fixing and testing of 25 mm dia Medium grade including complete GI specials on PCC support or on trenches complete all as specified and directed. |
| 3 | M&L for relaying of GI pipe above after proper cleaning, descalling and fixing to original position for bore of pipe 25 mm including necessary rubber gusket, nuts, bolts & washers complete all as specified and directed. |
| 4 | Dismantling taking out GI pipe from PCC support/Trenches for repair/ replacement/ relaying for bore of pipe 40 mm complete all as specified and directed. |
| 5 | Supply, fixing and testing of 40 mm dia Medium grade including complete GI specials on PCC support or on trenches complete all as specified and directed. |
| 6 | M&L for relaying of GI pipe above after proper cleaning, descalling and fixing to original position for bore of pipe 40 mm including necessary rubber gusket, nuts, bolts & washers complete all as specified and directed. |
| 7 | Dismantling taking out GI pipe from PCC support/Trenches for repair replacement/ relaying for bore of pipe 50 mm complete all as specified and directed. |
| 8 | Supply, fixing and testing of 50 mm dia Medium grade including complete GI specials on PCC support or on trenches complete all as specified and directed. |
| 9 | M&L for relaying of GI pipe above after proper cleaning, descalling and fixing to original position for bore of pipe 50 mm including necessary rubber gusket, nuts, bolts & washers complete all as specified and directed. |
| 10 | Dismantling taking out GI pipe from PCC support/Trenches for repair/ replacement/relaying for bore of pipe 80 mm complete all as specified and directed. |
| 11 | Supply, fixing and testing of 80 mm dia Medium grade including complete GI specials on PCC support or on trenches complete all as specified and directed. |
| 12 | M&L for relaying of GI pipe above after proper cleaning, descalling and fixing to original position for bore of pipe 80 mm including necessary rubber gusket, nuts, bolts & washers complete all as specified and directed. |
| 13 | Excavation in trenches not exceeding 1.5m in depth and not exceeding 1.5m wide for pipe and getting out in soft/loose soil complete all as specified and directed. |
| 14 | Excavation in trenches not exceeding 1.5m in depth and not exceeding 1.5m wide for cable/pipe and getting out in hard disintegrated rock / Road / PCC hard standing and making the disturbed surfaces good same as existing before excavation complete all as specified and directed. |
| 15 | Returning, filling in(soil), including spreading, levelling, watering and well ramming in layers not exceeding 25 cm complete all as specified and directed. |
| 16 | Removing excavated materials(soil) not exceeding 50m, depositing where directed at a level not exceeding 1.5 m above the starting point complete all as specified and directed. Please Enable Macros to View BoQ information |
| 17 | Removing excavated materials(soil) not exceeding 50m, depositing where directed at a level not exceeding 1.5 m above the starting point complete all as specified and directed. Please Enable Macros to View BoQ information |