Tender For E-Tender For Pre-Monsoon Maintenance Of Prior To The Rainy Season Of 11 Kv Ht & Lt Lines, Including Cutting/Looping Of Tree Branches, Bush Cutting, Stay Tightening, Strengthening/Straightening Of Poles, Conductor Sagging, Tightening, Jumpe, Nahan-Himachal Pradesh
TDR : 55015351
Tender Notice
BOQ
7 Days Left
Nahan
Himachal Pradesh
Tender For E-Tender For Pre-Monsoon Maintenance Of Prior To The Rainy Season Of 11 Kv Ht & Lt Lines, Including Cutting/Looping Of Tree Branches, Bush Cutting, Stay Tightening, Strengthening/Straightening Of Poles, Conductor Sagging, Tightening, Jumpe
Name of Work:- E-Tender for pre-monsoon maintenance of prior to the rainy season of 11 kV HT & LT lines, including cutting/looping of tree branches, bush cutting, stay tightening, strengthening/straightening of poles, conductor sagging, tightening, jumpering, etc., complete in all respects, to ensure smooth power supply in Electrical Section Surla under ESD Nahan No. II. Ch. to: R/M of HT/LT Lines under ESD Nahan No. II for FY 2026–27 (NIT No NED-06/2026-27).
Sl. No.
Item Description
1
E-Tender for pre-monsoon maintenance of prior to the rainy season of 11 kV HT & LT lines, including cutting/looping of tree branches, bush cutting, stay tightening, strengthening/straightening of poles, conductor sagging, tightening, jumpering, etc., complete in all respects, to ensure smooth power supply in Electrical Section Suketi under ESD Kala Amb.
2
Tender for pre-monsoon maintenance of 11 kV HT and LT lines by carrying out cutting and looping of tree branches, bush cutting, and general line maintenance prior to the rainy season. The scope of work includes stay tightening, jumpering, conductor sag correction, straightening of poles, and all other allied works required to ensure proper functioning of the electrical network. The work shall be executed by providing a maintenance gang comprising 100 man-days to ensure smooth and uninterrupted power supply to the consumers in Electrical Section Surla under Electrical Sub-Division (ESD) Nahan No. II. All works shall be carried out under the supervision of HPSEBL line staff. The contractor/firm shall arrange all necessary T&P (Tools & Plants), including transportation (vehicle), at their own cost, and execute the work to the satisfaction of the Engineer-in-Charge. (Item wise detail attached in tender document as per Annexure \\"A\\") Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.