| 1 | Transportation cost of drilling equipment like machinespumps and accessories by 10 T capacity motor vehicles including loading, unloading and security complete. |
| 2 | up to100 km |
| 3 | add extra for every 50 km |
| 4 | Dismantling, transportation and assembling of Drilling Machines of different capacity complete by head load including cost of labour, T&P etc. as per directions of Engineer-In-Charge. |
| 5 | up to 100 m lead |
| 6 | up to 500 m lead |
| 7 | Construction of Platform with locally available material of size 6.0 m X 6.0 m X 1.0 m for housing the drilling machine complete with cost of all labour, material,T&P & transport as per direction of Engineer -In- Charge. |
| 8 | Diamond core drilling vertical hole (with 0⁰-10⁰ angle from vertical) of desire depth with double barrel core samplers for geological & geotechnical investigation in the project area and around the project alignment of Mori Tiuni HEP (as given below in desired mode) as per specification of NX/ EX size, having depth as per direction of Engineer-In-Charge including all cost of material, labour, T&P etc. complete in all respect, with a core recovery as per IS Specifications and boxing (Making and supplying of sal wood/ local wood core boxes with dummy (core loss), wooden blocks and packing materials as per IS: 4078-1980 with latest amendments, if any, including all cost of labour, materials, carriage and T&P complete in all respect with painting and writing, marking etc leveling and transportation of the core etc. The above work also includes water permeability test (Double packer method) at every 1.50 m to 3.00 m depth in ascending and descending order including all cost of materials, labour, T&P, others equipment’s etc. required for performing the test complete in all respect to fullsatisfaction of Engineer-In-Charge. |
| 9 | Groutability test (as Per IS Code 4999-1991,5529-2- 2006 Part 2) above work item no 4 (double packer method) at every 1.5 to 3.0 M depth in ascending and descend order including all cost of material labour T&P,others equipment etc. required for performing the test complete in all respect to full satisfaction of Engineer -In-Charge. |
| 10 | Diamond core drilling Angular hole (with 10⁰-30⁰ angle from vertical) of desire depth with double barrel core samplers for geological & geotechnical investigation in the project area and around the project alignment of Mori Tiuni HEP (as given below in desired mode) as per specification of NX/ EX size, having depth as per Direction of Engineer In Charge including all cost of material, labour, t&p etc. complete in all respect, with a core recovery as per I.S Specifications and boxing (Making and supplying of sal wood/ local wood core boxes with dummy (core loss), wooden blocks and packing materials as per IS Specification number 4078- 1980 with latest amendments, if any, including all cost of labour, materials, carriage and T&P complete in all respect with Painting and writing, marking etc) leveling and transportation of the Core etc. the above work also includes water permeability test (Double packer method) at every 1.50 m to 3.00 m depth in ascending and descending order including all cost of materials, labour, T&p others equipment’s etc. required for performing the test complete in all respect to fullsatisfaction of Engineer -In-Charge |
| 11 | Groutability test (as Per IS Code 4999-1991,5529-2- 2006 Part 2) above work item no 6 (double packer method) at every 1.5 to 3.0 M depth in ascending and descend order including all cost of material labour T&P,others equipment etc. required for performing the test complete in all respect to full satisfaction of Engineer -In-Charge. |
| 12 | Plate Load Test (PLT) in -situ to determine the ultimate Bearing capacity as per Is Code 1888-1982 and settlement of structure on the foundation material asPer IS Code 1892-2021 |
| 13 | Extra for leaving NX casing pipe (after drilling work is over) in loose strata as and where required & directed by the Engineer -In-Charge. |
| 14 | Standard penetration test as per I.S.: 2131-1981. The test should be complete in all respects & to the full satisfaction of Engineer -In-Charge. |
| 15 | Geological logging of drill holes as per Indian standards and submission of report complete in all respect to the full satisfaction of Engineer-In-Charge. |
| 16 | In Situ test for Geo technical investigations at MoriTiuni HEP |
| 17 | Concrete to rock interface (5 Blocks) (In situ direct shear test) as per IS: 7746:1991 & Standard Special Specification. The test should be complete in all respects & to the full satisfaction of the Engineer in charge. |
| 18 | Rock to Rock Interface (5 blocks) (In situ direct shear test) as per I.S: 7746:1991 & Standard Technical Specification. The test should be complete in all respects & to the full satisfaction of Engineer -In-Charge. |
| 19 | Report Preparation & Recommendation as per IS:7746:1991 |
| 20 | Excavation in foundation for retaining, breast walls etc.,in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of Engineer in charge as per drawing and technical specification. |
| 21 | Excavation in hilly area in ordinary rock by mechanical means not requiring blasting (WithoutDozer) including cutting and trimming of slope and disposal of cut material with a lift up to 1.5m and leadup to 20 m |
| 22 | Random Rubble stone Masonry, in breast walls,retaining walls etc. including supply of all materials,labour,T&P and royaltiesetc. complete as perdrawing and technical specification |
| 23 | Random Rubble stone Masonry laid in 1:6 cement and sand mortar ,in breast walls retaining walls,parapets,scupper etc including supply of all materials,labour,T&P and royaltiesetc. complete as per drawing and technical specification |
| 24 | Construction of coolie walling including supply of all materials,labour,T&P required for proper completion ofthe work as per direction of Engineer in charge |
| 25 | Hand packed stone filling in back of walls including cost of all materialsroyalty T&P etc. complete as per direction of Engineer in charge. |
| 26 | Laboratory testing shall be carried out as per IS 2720 (Test shall be performed as per soil conditions & engineering requirements) including all T&P, manpower,etc forcompletion of work. |
| 27 | Natural Moisture Content – IS 2720 |
| 28 | Specific Gravity – IS 2720 |
| 29 | Grain Size Analysis – IS 2720 |
| 30 | Atterberg Limits (Liquid Limit and Plastic Limit) – IS 2720 |
| 31 | Shear Test – IS 2720 |
| 32 | Triaxial Compression Test – IS 2720 |
| 33 | Consolidation Test – IS 2720 |
| 34 | Unconfined Compression Test (UCS) – IS 2720 |
| 35 | Direct shesr test for coarse grained soil |
| 36 | Point load index test for rock |
| 37 | Compression test of rock |
| 38 | Water absorbtion test |
| 39 | Determination of following properties of rock sample (Including all T&P, manpower,etc) forcompletion of work. |
| 40 | Rock quality designation |
| 41 | Unconfined Compressive strength Test |
| 42 | Rock mass rating |
| 43 | Water absorbtion |
| 44 | Erosion suspectibility |
| 45 | Bearing capacity |
| 46 | Mobilisation of cost of ERT equipment at Mori Tiuni project site. |
| 47 | Conducting Electrical Resistivity Tomography (ERT) test and submission of report including all T&P, manpower etc. required for proper completion of work Please Enable Macros to View BoQ information |