|
| 1 | Salvaging and Removing the Giant / Mini Giant Tyres form sea bed (-) 07.00 meter level manually including cost of P.P. Rope, cost of 32 mm dia \\"S\\" Hooks, Hire charges of oxygen and diving equipments, all labour charges minor tools, all Transportation charges store yard all scaffolding charges minor tools, GST and labour welfare cess but excluding hire charges of crane/forklift which will be supplied by free of cost at ALHW Campbell bay etc. complete. |
| 2 | Painting two coats of approved ready mixed synthetic enamel black and yellow paint in strips on the kerb of approach trestle and old steel structure, etc. after cleaning the surface including cost of paint brushes, transportation cost of all materials to work site all labour charges and minor tools, GST and labour welfare cess etc complete. |
| 3 | Dismantling the damaged concrete portion of richer mix including removing/ disposal of the dismantled materials, chipping and clearing the surface to receive the new concrete including cost of all minor tools and labour charges etc complete. |
| 4 | Providing and laying C.C 1:1.5:3 with 20 mm size stone chips (one cement, one and half river sand & three stone chips of size 2 cm graded) in all CC works as directed by the EIC, cost of centering & shuttering charges which will be paid seperately, but including cost of cement, stone chips 20 mm size and river sand, screening and washing of both the aggregates, mixing concrete, conveying the concrete, placing in position, consolidation with vibrator curing, all labour charges, transportation charges of all materials to work site, cost of minor tools & plants, hire charges of mixer machine and vibrator, cost of GST & Labour welfare cess etc., complete. |
| 5 | Painting two coats of synthetic enamel black paint to bollards of 90T/30T/10T twin capacity including cost of paint, brushes, all labour charges, minor tools, GST, and labour welfare cess., etc complete. |
| 6 | 90 T Capacity Bollards |
| 7 | 10 T capacity Twin Bollards/30T |
| 8 | Heating and applying cardium compound on the surface of wire rope including cost of cardium compound, cost of all labour charges transportation charges of all materials to work site, cost of minor tools, GST and labour welfare cess complete. |
| 9 | Providing and Fixing of giant tyre fenders of one set containing one tyre in position as directed by EIC including making holes, fixing eyelet with G.1 flange and nipple, cutting and tying of G.I wire ropes/Chain and fixing the same to tyres, Including cost of Giant tyres, G.I wire ropes, wire grip, flanges and nipples, cost of labour charges transportation charges of all materials to worksite, cost of minor tools etc complete. |
| 10 | Lifting the giant tyre from the berthing face of the wharf with the help of crane/fork lift for replacing nipple, wire, rope, chain, flange and wire grips etc., including conveying the giant tyre from berthing face of wharf to working yard within a lead of 30 Mtr. cost of labour charges, minor tools, labour welfare cess, GST etc., complete but excluding hire charges of crane/fork lift which will be supplied by the department with POL & Operator. Please Enable Macros to View BoQ information |