| 1 | Earthwork in excavation of foundation in hard or gravelly soil with initial lead & lift including rough dressing & levelling the bed etc. complete. |
| 2 | Supplying , filling Sand in F & P including cost, Conveyance & royalty of sand, cost of all labour, T & P, labour cess, watering, ramming etc. complete. |
| 3 | Cement Concrete (1:4:8) using 4cm size B.H.G. (C. B.) Metal including cost, conveyance , royalty & taxes of all materials etc. complete |
| 4 | R.C.C. M20 grade using 20mm and down graded size chips including cost conveyance etc. complete |
| 5 | Cement concrete (1:2:4) using 12mm. size c.b.b.h.g chips including cost of all materials etc. complete. |
| 6 | Rigid & smooth centering & shuttring for RCC works including false work & dismentling them after casting including cost of materials complete |
| 7 | Supplying fitting fixing and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification |
| 8 | Brick work with Fly Ash Brick having crossing strength between 100kg/cm2 to149kg/cm2 in C.M.( 1:4) in foundation and plinth. |
| 9 | Superstructure |
| 10 | 12mm. thick cement plastering (1:6) |
| 11 | Finishing wall surface with Wall Cement Primer water based including cost all complete.(A/R Item-1,Page- 93) |
| 12 | Wall painting two coat with Plastic Emulsion Paint of approved shade etc complete |
| 13 | Providing, spreading Quarry Rubbish in Sub-Base in layers not exceeding 22.5cm. including watering ,compacting to the required density in O.M.C. with rolling by Vibratory Roller as per O.P.W.D. specifications including cost, conveyance & royalty of all materials,cost of all labour, T & P, labour cess, watering, turfedging, hire & running charges of Vibratory Roller etc. complete. |
| 14 | Providing and laying 80 mm thick factory made cement concrete interlocking paver block of M.40 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. Please Enable Macros to View BoQ information |