Tender For Utility Shifting Work For Improvement Such As Widening And Strengthing Of Saintala - Titilagarh Road 0/000 Km To 30/915 Km (Except From 3/400 Km To 5/700 Km) From Womens College To Madan Jal Chowk, Titilagarh, Kantabanji-Odisha
TDR : 55013579
Tender Notice
BOQ
1 Days Left
Kantabanji
Odisha
Tender For Utility Shifting Work For Improvement Such As Widening And Strengthing Of Saintala - Titilagarh Road 0/000 Km To 30/915 Km (Except From 3/400 Km To 5/700 Km) From Womens College To Madan Jal Chowk, Titilagarh
Name of Work:- Utility Shifting work for Improvement such as widening and strengthing of Saintala - Titilagarh Road 0/000 km to 30/915 km (except from 3/400 km to 5/700 km) from Womens College to Madan Jal Chowk, Titilagarh
Sl. No.
Item Description
1
Cost of other materials for line and sub station Cost of 11KV Line with 100 mm2 AAAC including 1% LC, T&P @ 2%, Transportation@ 7.5%, Erection Charge @ 10%
2
Cost of common material for 11KV SP Cut point with 11mtr long GI Joist Pole (Excluding pole & Civil work cost) (100Sqmm) including 1% LC, T&P @ 2%, Transportation@ 7.5%, Erection Charge @ 10%
3
Cost of common material for 11KV Line pin point with 11mtr long GI Joist Pole (Excluding pole & Civil work cost) including 1% LC, T&P @ 2%, Transportation@ 7.5%, Erection Charge @ 10%
4
Construction of 3-Ph 95mm2 (5 Wire) AB Cable on 9 mtr X 300Kg PSC Pole for LT Line (30 mtr span)(Excluding pole) including 1% LC, T&P @ 2%, Transportation@ 7.5%, Erection Charge @ 10%
5
Cost of Transormer/Breaker/Joist PoleSupports of 11 mtr. long 150 X 150 mm Joist GI Pole as per TPWODL norms including 1% LC, T&P @ 2%, Transportation@ 7.5%, Erection Charge @ 5%
6
Cost of PSC PoleCost of 9 mtr. Long 300 Kg. PSC Pole for HT line + S/S+ others including 1% LC, T&P @ 2%, Transportation@ 7.5%, Erection Charge @ 20%
7
Concreting ratio 1:1, 5:3 (M-20 Grade) (500mm x 500mm x1800mm) = 0.45 Cum (Per Pole) including 1% LC
8
Couping Ratio 1:1, 5:3 (M-20 Grade) With dimension (500mm x 500mm x 450mm) = 0.1125 Cum (Per Pole) including 1% LC
9
Stay Concreting Ratio 1:1, 5:3 (M-20 Grade) With dimension (500mm x 500mm x 800mm) = 0.2Cum (Per Stay) including 1% LC
10
Dismantal cost of LT Line including 1% LC
11
Dismantal cost of 11 KV Line including 1% LC
12
Inspection fee for LT line
13
Inspection fee for 11KV line
14
Drawing Approval Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.