|
| 1 | Dismantling of Existing Structures link culverts bridges retaining wall and other structure comprising of masonry cement concrete wood work steel work including T&P and scaffolding wherever necessary sorting the dismantled material disposal of unserviceable material and stack ing the serviceabel material with all lifts and lead of 1000 metres |
| 2 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 |
| 3 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. |
| 4 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 5 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (For Patri) |
| 6 | Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 to 1.00 kg/sqm using mechanical means. |
| 7 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. As per MoRTH specification clause No. 505 complete in all respects |
| 8 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. As per Technical Specification Clause 503 (For BC) |
| 9 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects |
| 10 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. |
| 11 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. |
| 12 | Cement concrete with 2 cm gauge approved stone ballast approved coarse sand cement in the proportion of 4:2:1 including supply of all material T&P etc. required for proper completion of work. (As per S.I. No. 279 a) |
| 13 | Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. |
| 14 | Pointing with cement mortar (1:3) on brick work in substructure as per Technical Specifications |
| 15 | Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 |
| 16 | Providing laying and fixing of 1000 mm dia NP-3 Class Spigot Hume Pipe |
| 17 | Lettering and painting of culvert and parapet etc. complete. |
| 18 | Sand Fillling over hume pipe for cushion including suppply of necessary quantity fo sand including watering ramming and dresssing etc. required for proper completion of work. |
| 19 | Supply & Fixing Km, HM Stone, Road Sign/Caution Board etc complete |
| 20 | Part-BMaintainance Charge including @ Earth work, repair of painted surface, Earth work on patri, Culvert, Road Furniture etc as per Direction of E/I for the period of Five Year from the actual completion of work. Total of work Amount 1 to 28 (Excluding G.S.T.)Maintainance of First Year @ 0.00% of Total work Amount of 1 to 19) |
| 21 | Part-BMaintainance Charge including @ Earth work, repair of painted surface, Earth work on patri, Culvert, Road Furniture etc as per Direction of E/I for the period of Five Year from the actual completion of work. Total of work Amount 1 to 28 (Excluding G.S.T.)Maintainance of Second Year @ 0.25% of Total work Amount of 1 to 19) |
| 22 | Part-BMaintainance Charge including @ Earth work, repair of painted surface, Earth work on patri, Culvert, Road Furniture etc as per Direction of E/I for the period of Five Year from the actual completion of work. Total of work Amount 1 to 28 (Excluding G.S.T.)Maintainance of Third Year @ 0.50% of Total work Amount of 1 to 19) |
| 23 | Part-BMaintainance Charge including @ Earth work, repair of painted surface, Earth work on patri, Culvert, Road Furniture etc as per Direction of E/I for the period of Five Year from the actual completion of work. Total of work Amount 1 to 28 (Excluding G.S.T.)Maintainance of Fourth Year @ 0.75% of Total work Amount of 1 to 19) |
| 24 | Part-BMaintainance Charge including @ Earth work, repair of painted surface, Earth work on patri, Culvert, Road Furniture etc as per Direction of E/I for the period of Five Year from the actual completion of work. Total of work Amount 1 to 28 (Excluding G.S.T.)Maintainance of Fifth Year @ 1.00% of Total work Amount of 1 to 19) Please Enable Macros to View BoQ information |