| 1 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 2 | Installation of Pre-insulated straight through joints for 16sqmm cable |
| 3 | Installation of Pre-insulated straight through joints for 50sqmm cable |
| 4 | Installation of Pre-insulated straight through joints for 70sqmm cable |
| 5 | Erection of suspension clamp for LT ABC of any size |
| 6 | Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |
| 7 | Singe Phase Satellite connectors upto 4 service main connections (25-95 ABC/2.5-25 sqmm SM wire-2No) |
| 8 | Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap 16-95 sqmm |
| 9 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc. |
| 10 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. |
| 11 | Providing one Driven Earth using GI earth pipe at standard distance away from the pole/structure in loose soil. |
| 12 | Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductors in rolls. |
| 13 | Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductors in rolls. |
| 14 | Dismantling (without damage) one km LT additional conductor line, cross arms, insulators and stacking the conductors in rolls. |
| 15 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion |
| 16 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. |
| 17 | Repairing/changing WP wire 3 - phase |
| 18 | Repairing/changing Damaged WP wire |
| 19 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc. |
| 20 | Erecting one LT PSC Pole in position incl. digging & back filling pit. |
| 21 | Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 22 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. |
| 23 | Straightening one Slanted LT pole after unbinding the line and rebinding the line after work. |
| 24 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 25 | Dismantling (without damage) one LT TW/RSJ/Rail pole after disconnecting stays, strut etc. and stacking the same. |
| 26 | Renewal of existing damaged/old LT Strut with new PSC strut in place and refitting of all items incl. conveyance (except pole). |
| 27 | Pole numbering using printed Aluminium sheets / Painting the surface of pole with anti algal yellow paint and painting Letters with black paint as specified incl. cost of paint. |
| 28 | Erecting one LT RSJ Pole in position incl. digging & back filling pit. |
| 29 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite. |
| 30 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). |
| 31 | DSR 2018 13.61.1 Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work |
| 32 | Centering and shuttering including strutting,propping etc. and removal of form for all heights for lintels,beams and plinth beams including cost of all materials labour etc complete as per thestandard specifications and direction of board staff. |
| 33 | Cement concrete i,:2:4 using 20mm nominal size aggregate, laying to lines and levels at all elevations, consolidating curing, including cost of all materials and labor charges, etc. complete including the cost of cement. as per the direction of the departmental officers. |
| 34 | Plastering with cement mortar 1:4, (1 cement : 4 fine sand) 12 mm thick one coat, floated hard and trowelled smooth for outside walls up to 10 m height including cost of all materials and labour etc. complete as per the standard specifications and direction of Board staff. ( DSR 2018 rate ) |
| 35 | Providing Stay for LT poles incl. digging & back filling pit. |
| 36 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. |
| 37 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70+ 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 38 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2drum including loading and un loading using crane |
| 39 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 50+ 1 x 16 + 1 x 35 sqmm with bare/insulated Messenger through existing poles |
| 40 | Stringing of 1.1 kV Aerial bunched cable of size 1 x 25+ 1 x 25 sqmm with bare/insulated Messenger through existing poles Please Enable Macros to View BoQ information |