| 1 | Name Of Sub Estimate : Repairing of Chlorine Leak Absorption System at Katol WTP |
| 2 | Repairing of Absorption tank to remove leakages and provide additional FRVe coats at bottom foradditional strength, repairs of Absorption tower, Blower & control panel. |
| 3 | Replacement of caustic solution 2000 Kg |
| 4 | Supply & Replacement of all Nuts/bolts/washer-ss |
| 5 | Supply & Replacement of all gaskets |
| 6 | Supply & Replacement of all PP valves and flanges |
| 7 | Supply & Replacement of PP circulation pumps |
| 8 | Supply & Replacement of Leak detector with sensor |
| 9 | Supply of Emergency Kit for 100 Kg cylinder consisting various sub assemblies for controlling leakage of a) Valve b) Outer surface of Cylinder |
| 10 | Supply of Air Breathing Apparatus - capacity 45 minutes |
| 11 | Name Of Sub Estimate : Repairing of Chlorine Leak Absorption System at Saoner WTP |
| 12 | Repairing of Absorption tank to remove leakages and provide additional FRVe coats at bottom foradditional strength, repairs of Absorption tower, Blower & control panel. |
| 13 | Replacement of caustic solution 2000 Kg |
| 14 | Supply & Replacement of all Nuts/bolts/washer-ss |
| 15 | Supply & Replacement of all gaskets |
| 16 | Supply & Replacement of all PP valves and flanges |
| 17 | Supply & Replacement of PP circulation pumps |
| 18 | Supply & Replacement of Leak detector with sensor |
| 19 | Supply of Emergency Kit for 100 Kg cylinder consisting various sub assemblies for controlling leakage of a) Valve b) Outer surface of Cylinder |
| 20 | Supply of Air Breathing Apparatus - capacity 45 minutes |
| 21 | Name Of Sub Estimate : Repairing of Chlorine Leak Absorption System at Umred WTP. |
| 22 | Repairing of Absorption tank to remove leakages and provide additional FRVe coats at bottom foradditional strength, repairs of Absorption tower, Blower & control panel. |
| 23 | Replacement of caustic solution 2000 Kg |
| 24 | Supply & Replacement of all Nuts/bolts/washer-ss |
| 25 | Supply & Replacement of all gaskets |
| 26 | Supply & Replacement of all PP valves and flanges |
| 27 | Supply & Replacement of PP circulation pumps |
| 28 | Supply & Replacement of Leak detector with sensor |
| 29 | Supply of Emergency Kit for 100 Kg cylinder consisting various sub assemblies for controlling leakage of a) Valve b) Outer surface of Cylinder |
| 30 | Supply of Air Breathing Apparatus - capacity 45 minutes Please Enable Macros to View BoQ information |