| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. |
| 2 | All Kinds of Soil |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: |
| 4 | All Kinds of Soil |
| 5 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: |
| 6 | All Kinds of Soil |
| 7 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work. |
| 8 | 50 mm dia GI pipes |
| 9 | 25 mm dia GI pipes |
| 10 | 20 mm dia GI pipes new pipe |
| 11 | 15 mm dia GI pipes |
| 12 | Making connection of G.I. distribution branch with G.I. main of following sizes by providing and fixing Tee, including cutting and threading the pipe etc. complete |
| 13 | below 40 mm nominal bore |
| 14 | above 40 mm nominal bore |
| 15 | Providing and laying of dry stone soling tightly hand packed incl all Carraiges |
| 16 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 17 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) |
| 18 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete |
| 19 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 20 | Centering and shuttering including strutting, propping etc. and removal of form work for: |
| 21 | Foundations, footings, bases of columns etc. for mass concrete. |
| 22 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats |
| 23 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-incharge. |
| 24 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 25 | Supplying generator with welding machine for welding with trolly to site of work |
| 26 | Carriage of material from source to dumping site at road by mechnical transport. Avg. |
| 27 | Cement and Steel 30Km |
| 28 | Pipes 50Km |
| 29 | Sand/ 20 mm Agg. 50KM |
| 30 | 40 mm Agg. 50KM |
| 31 | Extra Carriage of material from dumping site upto actual site of work for Avg lead. |
| 32 | Pipes 500mtr |
| 33 | Cement 1500mtrs |
| 34 | Steel 1500mtrs |
| 35 | Sand/Agg. 1500mtrs Please Enable Macros to View BoQ information |