| 1 | Earth work in excavation of all kinds of soil including dressing and leveling the bed and depositing the excavated soil clear of work site with all leads, lifts, delifts including removing bushes, stumps and any other foreign materials from the working area as well as from the foundation trenches with cost of all labour, labour welfare cess etc. complete in all respects as per specification and direction of the Engineer-In-Charge. |
| 2 | Filling foundation and plinth with good quality sand including watering and ramming to required thickness with cost, carriage, royality with EMF,DMF,Additional Charges and all other taxes, T & P etc complete as per direction of the Engineer-in-charge. |
| 3 | Cement concrete in cement mortar (1:3:6) with 40mm size hard granite crusher broken stone chips and good quality of sharp, clean river sand including cost, carriage, royalty with EMF,DMF,Additional Charges and taxes of all materials, watering and curing, dewatering of concrete area, if necessary, etc complete as per direction of the Engineer -in-charge |
| 4 | P.C.C work of M-15 grade with 20mm and downgraded black hard granite crusher broken stone chips including hoisting and laying including cost,carriage,royality with EMF DMF, Additional Charges and taxes of all materials etc complete with curing as per direction of the Engineer-in-charge. |
| 5 | P.C.C work of M-20 grade with 20mm and downgraded black hard granite crusher broken stone chips including hoisting and laying including cost,carriage,royality with EMF, DMF, Additional Charges and taxes of all materials etc complete with curing as per direction of the Engineer-in-charge. |
| 6 | Rigid and smooth centering and shuttering for Wall and fins including attached pillarsters R.C.C. Work including false work and dismantling then after casting including cost & all taxes of all materials etc. complete as per direction of the Engineer-in-Charge. |
| 7 | Supplying, fitting, fixing and placing uncoated HYSD bar reinforcement including 5 percent wastage including cost, carriage, all other taxes of HYSD bar binding wire etc. complete as per drawing specification and direction of the Engineer-in-charge. |
| 8 | Filling foundation & Plingth with excavated materials including watering & rammed with all labour, T&P, taxes and cess etc. complete as directed by the Engineer-in-Charge. |
| 9 | Puddle filling of good clay with all leads, lifts, delifts including digging, weathering, pulvershing and trodding with all labour, T & P and cess etc. complete as per direction of the Engineer-in-Charge. Please Enable Macros to View BoQ information |