| 1 | Percentage BoQ BoQ_Ver3.0 Percentage Normal INR Only INR Select, At Par, Excess (+), Less (-) IOCL Tender Inviting Authority: NAGAR NIGAM AYODHYA Name of Work uxj fuxe v;ks/;k ds vUrxZr VªkaliksVZ uxj {ks= ds vkjåVhåvkså v‚fQl esu xsV isVªksy iEi ds ikl 01 ux LekVZ okVj fd;ksLd dk vf/k\\"Bkiu dk;Z e; 1 ,påihå lejlsfcy cksfjax dk;ZA Contract No: Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # S.No. Item Description Item Code / Make Quantity Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Supply, Installation & Commission of drinking water kiosk with 250 LPH RO + UV, cooling tank capacity 500 ltr. With 1 HP Submersible boring Including all, materials, T&P required for proper completion of work. |
| 3 | Construction of cemented Drain for water kiosk with all labour, material, T&P etc. Complete. |
| 4 | Excavation of earth for pipe line trenches with lift upto 1.5 and lead upto 50M filling back the earth into trenches includind watering, ramming and disposal of surplus material with in 50M lend etc, complete. Excavation for ordinary soil @ 70% of 38.00 cum |
| 5 | Excavation in mixed soil with bajri, kankar, Mooram @ 30% of 38.00 cum |
| 6 | Cartage of pipe from market to the site with Loading, Unloading, Labour etc. all Complete work.(a) 1 mtr to 250 mtr |
| 7 | Barricading Charge for excavation of pipe line with all labour, materials TTP etc. all Complete work. (a) 1 mtr to 250 mtr |
| 8 | Supply of 25 mm dia G.I. pipe both side traidhed B-Class ISI Mark Jindal/Prakash make etc. approved quality. |
| 9 | Laying of G.I. pipe following size with jointing leveling etc all Complete work. |
| 10 | S/F of PVC Special for Laying of Pipe Line with Tee, socket etc. @15% of Item no.6 with all Complete. |
| 11 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 km. From the site of work and including wateing, ramming dressing etc.Rate to include cost of all materials,lebour and T&P etc.required for proper completion of the work. |
| 12 | Construction of single tap pillar type stand post as per departmental type design including supply of all materials labour T&P etc. required for proper completion of work. |
| 13 | Providing and laying Cement Concrete 1:4:8 (1 cement :4 coarse sand :8Grade Stone ballast 40 mm nominal size) inclucding supply of all materials, labour and T&P etc required for proper completion of work and curing complete also inculding cost of form work . |
| 14 | Supply of 20 mm thick Black granite (Polished) in big slab. |
| 15 | Fixing of 20mm thick black granide with all labour, Cement T&P, molding, cutting etc. all complete work @15% off item number |
| 16 | Supply & fixing of sockpit for unused water. Total in Figures 1094901.99 1094901.99 INR Ten Lakh Ninety Four Thousand Nine Hundred & One and Paise Ninety Nine Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 INR Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |