| 1 | Excavation for StructuresEarthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. |
| 2 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202 By Mechanical Means(Bituminous Courses) |
| 3 | Construction of Embankment with Material Obtained from Borrow PitsConstruction of embankment with approved material obtained from borrow pits with a lift upto1.5 m, transporting to site, spreading, grading to required slope and compacting to meetrequirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical SpecificationClause 301.5etc complete as per instruction by Engineer-in-charge |
| 4 | By Mix in Place Method -Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401 For Grading I Material etc complete as per instruction by engineer-in-charge . |
| 5 | Wet Mix MacadamProviding, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. (By Mechanical Means with 1 km lead) |
| 6 | Portable Barricade in Construction Zone (Installation of a steel portable barricade with horizontal rail 300 mm wide, 2.5 m in length fitted on a 'A' frame made with 45 x 45 x 5 mm angle iron section, 1.5 m in height, horizontal rail painted (2 coats) with yellow and white stripes, 150 mm in width at an angle of 450, 'A' frame painted with 2 coats of yellow paint, complete as per IRC:SP:55-2001 ) |
| 7 | Cement - Flyash Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Subbase over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, replacing cement by fly ash to the extent of 20 per cent , aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 129 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing) |
| 8 | Cement Concrete Pavement (For TWT)Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M40 (Grade) for TWT, coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 Cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 etc complete as per instruction by Engineer-in-charge |
| 9 | Construction of Subgrade and Earthen ShouldersConstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. |
| 10 | Prime Coat Low porosityProviding and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 |
| 11 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 12 | Tack coat using VG-10 grade bitumen Over normal bituminous surfaces @0.35kg/sqm, |
| 13 | Providing and laying Dense Bituminous Macadam with the use of batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.25% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.Grading II - 26.5mm nominal size |
| 14 | Providing and laying Bituminous Concrete with the use of batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects for Grading-II (bituminous binder @ 5.4 % of mix) |
| 15 | Solar Road Studs:Providing and fixing Solar Powered Road Studs (Rectangular) of size not less than 100mm x 100 mm x 10 mm or (Circular) of dia 130+/- 6mm and height 30 +/- 2mm (with 8 super bright LEDs for long visibility from distance greater than 800 m) having twin shank and body made of aluminium alloy and poly carbonate material which shall be absolutely weather resistant and strong enough to support a load of 13635 kg tested in accordance with ASTM D 4280 and water resistance as per IP 65 in accordance with IS 12063:1987, fixed to the road surface using adhesives and the procedure recommended by the manufacturer as per Clause No. 804.6 and 804.7 of MORTH specifications. |
| 16 | Road Studs / Cat Eye:Providing and fixing of single mould twin shank reflective road studs of ‘category A’Raised pavement markers made out of poly carbonate/ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face with retro reflectance and chromaticity values shall be as given in the detailed specifications and the product shall conform to ASTM D4280.The raised pavement marker shall also meet all the testing conditions of ASTM D4280 and fixed to the road surface using the adhesive recommended by the manufacturer. Two cylindrical Polymer Shanks of not less than 20 mm diameter and not less than 30 mm length shall be molded in the RPM body. The reflective raised pavement markers shall also confirm to the MORTH circular No RW / NH. 33023/10/ 97-DO.III and the length ,height and width of the body shall not be less than 100 mm, 15 mm and 90 mm and base of marker shall be flat within 1.3 mm and outermost faces of configuration of marker shall not deviate more than 1.3 mm from a flat surface. |
| 17 | Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflectivesheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 800 mm x 600 mm rectangular |
| 18 | 600 mm circular |
| 19 | Providing and laying reinforced cement concrete pipe NP4 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. 1000 mm dia |
| 20 | Excavation for StructuresEarthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. |
| 21 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3:6 |
| 22 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix (1:2:4) |
| 23 | Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 Brick masonry in 1:4 cement mortar |
| 24 | Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 Please Enable Macros to View BoQ information |