|
| 1 | Repair and Maintenance of Dozing pump per no. per month.. |
| 2 | Drinking Water Free Residual Chlorine Test from PHED State Water Testing Lab Karnal. |
| 3 | P/F INJECTOR OF DOZING PUMP (Complete in all respect) Reputed make.. |
| 4 | P/F Pipe of dozer pump Reputed make.. |
| 5 | O-Tollidine field test kit (Including Plastic clear box, 2no. Transparent Tubes, 10ml O-Tollidine Solution, Dose measuring chart) (Assume 1set per 02 tubewell) i.e. 44 no. x 12 month= 528 no. set required appprox. |
| 6 | Feeding of sodium hypochlorite solution from Karan Gate Main storage tank to various water works (ward 1 to 20 except HSVP) under M.C. Karnal. |
| 7 | Drinking Water Bacteriogical test from PHED State Water Testing Lab Karnal... |
| 8 | Drinking Water Physical and Chemical Test from PHED State Water Testing Lab Karnal... |
| 9 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] |
| 10 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] |
| 11 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] |
| 12 | [20.87]Supply and erection of “Wall Mounting Type, solenoid driven, motorized, electromagnetic diaphragm Dozing Metering pump working on three-phase 220/240 V 50 Hz electric supply with standard electronic controls, suitable for minimum dozing capacity 0 to 27 LPH at 10 bar back pressure” complete with necessary accessories, complete in all respects along with supply and erection of 1 No. Voltage Stabilizer with Dozing Pump along with 1 No. 300 litres capacity ISI marked HDPE storage tank of approved make as per directions of Engineer-in-charge. [Through Rate] |
| 13 | [22.181]Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. [Through Rate] |
| 14 | [4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate] |
| 15 | [6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate] |
| 16 | [7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate] Please Enable Macros to View BoQ information |