| 1 | (Supply Part DTR's Ts.No. 84/2025-26) |
| 2 | Distribution Transformer(Ordinary) 11/0.4KV 100KVA |
| 3 | Steel Tubular Pole (9Mtr Long) |
| 4 | Muffs with concerete filling |
| 5 | Dis insulator Sets |
| 6 | Surge Arrester, 9KV Station class (porcelain Type) |
| 7 | D.O. Fuse unit |
| 8 | GO AB Switch unit (11KV,400A,25KA) Tripple pole O/D Type |
| 9 | Stay set complete in all respect |
| 10 | Pipe Earthing Set |
| 11 | Nuts & Bolts off size. |
| 12 | Aluminium Paint |
| 13 | Barbed Wire |
| 14 | Providing of X-Arm 1) Cross Arm( 2800x100x50x6) @ 9.56Kg P/Mtr =4 (2) (460x 100X50X6) @ 9.56 Kg P/Mtr = 2, Nos.(3) (2800x75x40x6mm) @ 7.14 Kg P/Mtr=2 Nos, (4) Ms Angle Iron (2800x50x50x6mm) @ 4.5 kg P/Mtr= 5 Nos.(5) ( 950x50x50x6mm)@ 4.50 kg/P/Mtr= 4 Nos. (6) ( 450x50x50x6mm) @ 4.50 kg P/Mtr= 2 No. (7) ( 460x35x35x6mm) @ 2.6 kg P/Mtr = 2 Nos.) (8) ( 460x75x40x6) @ 7.14 kgP/mtr= 1 no. |
| 15 | Stay wire (7/3.15mm) (7.0kg per Stay Set) |
| 16 | LT Distribution Panel Box with MCCB (40A, 25KA 4P ) and SFU (16A, 4No. Rewirable) |
| 17 | Full Clamp |
| 18 | Half Clamp |
| 19 | CT-PT Combined Unit [PT:11 kV/110 V) ; CT: 100/5A] |
| 20 | 3-ɸ, 4 wire CT-PT operated Static TriVector meter- (CT-500/5A) \\"Category-C\\" Accuracy Class: 0.5S, category -C, DLMS Compliant . |
| 21 | LT Switch Capacitors 27-Kvar for 100KVA |
| 22 | LT cable (3.5 core) 70mm^2 |
| 23 | LT cable (3.5 core) 95mm^3 |
| 24 | ACSR Condctor 6/1/3.35 (50mm^2) (for Earthing,Jumping, & Bus -baretc) |
| 25 | Copper Thimble 95 sq mm |
| 26 | GI Wire for earthing |
| 27 | Danger Plate |
| 28 | (Erection Part DTR Ts.No. 84/2025-26) |
| 29 | Digging of Pit for 2 No. Pole |
| 30 | Drilling of Holes in X-Arms |
| 31 | Preparation of Platform Structure Members Ci, Ai, I.E. X-Arm & Knee Bracing Set |
| 32 | Concreting of RCC Muff |
| 33 | Erection of X0Arms,Drop0out , Jumper & D Pole complete in all respect. |
| 34 | Providing Earthing Connection to G.O.Switch, Transformer, lightening Arrestor, LT Box, Meter Box etc. & pole in all respect. |
| 35 | Erection of 2 No. Stay sets a)Digging of Pit b)Ramming of Pit c) Nozzeling & Tightening d) fixing of Egg insulator complete in all respect. |
| 36 | Earthing for 3 Nos. Earth ( Digging of pit,fixing of earth road,clamp, earth wire, and connecting to the structure, Providing Charcoal and Salt for the earthing and Filling of the pit with material in all respect. |
| 37 | Barbed Wire & Painting |
| 38 | Chain Link fancing, angle Iron, Gate etc for transformer fencing in all respect. |
| 39 | HP make AIO Desktop with 12th Generation Intel® Core™ i3-1215U Processor (E-cores up to 3.30 GHz P-cores up to 4.40 GHz) , 8 GB DDR4-3200MHz (SODIMM), 512 GB SSD M.2 2280 PCIe Gen4 TLC, 23.8\\" FHD (1920 x 1080), IPS, Anti-Glare, Non-Touch, 72%NTSC, 250 nits, 14ms, & Webcam, 2 x USB-A 3.1 Gen 2, 2 x USB-A 2.0, Ethernet (RJ45) HDMI Headphone / mic combo, wireless Key board & mouse, Up to WiFi 6 (2x2 802.11 ax/ac/a/b/g/n), Bluetooth® 5.0. with three years on site warranty . (ii) 650VA offline UPS system with three year warranty and iii) Laser Jet printer. |
| 40 | Erection of 100 kVA Transformer, LT Box, MCCB Switch, Cable, service Cable and Energy Mete complete in all respect. |
| 41 | (Supply Part of HT Line Ts.No. 84/2025-26) |
| 42 | ACSR 6/1/3.35mm (50mm^2) {Includes 3 conductor lengths for 3Φ and Additional 1% (Sag, Jumpering and wastage} |
| 43 | Steel Tubular Pole (10M) Working Load > 200 kgf/m²) (with Ruling Span 67 m) |
| 44 | Cross Arm: [Channel iron ( 100x50x5), Length 1270 mm i/c tolerance of 100mm either side) for Single Pole |
| 45 | Angle Iron (50x50x6 mm), Length: 750 mm x 2 No. x 8 structures |
| 46 | Pole Top Bracket [MSCI:100x50x6 mm- 100 mm] |
| 47 | Belt Set - MS Angle Iron: 50x50x6, Length :1800 mm x 2 No. |
| 48 | X-Bracing Set - MS Angle Iron: 50x50x6, Length: 2125 mm x 2 No. |
| 49 | X-Arm (Horizontal) - MS Channel Iron: 100X50x5, Length: 2340 mm x 2 No.] ∆ Formation |
| 50 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line |
| 51 | X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 52 | GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length : 460 mm |
| 53 | MS Channel Iron: 75x40x6, Length : 2400 mm for Road crossing |
| 54 | Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides) |
| 55 | 11 kV Pin Insulators (Porcelain, 12 kV, 10 kN) |
| 56 | Stay set complete in all respect |
| 57 | Stay Wire (7/3.15 mm) (10.0 kg Per Stay Set) |
| 58 | HT Earthing set complete (REC Constr. Stand. J-1) |
| 59 | Single Continous Earth wire (GI, 8 SWG) {alongwith 2 wire lengths for avg. one road crossing @ 20 m and Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 60 | Eye Hook for earth wire |
| 61 | Earth Wire Clamp |
| 62 | GO AB Switch unit (11KV,400A,25KA) Tripple pole O/D Type |
| 63 | D.O Fuse Unit |
| 64 | Half Clamp |
| 65 | full Clamp |
| 66 | Danger Plate |
| 67 | Nuts & Bolts of various Sizes |
| 68 | Barbed wire |
| 69 | Aluminium Paint |
| 70 | (Erection Part of HT Ts.No. 84/2025-26) |
| 71 | Erection of S/T Pole 10 mtr long for (Single pole structure) a)Digging of Pit, b)Erection of pole C)Filling of pit+Ramming, D)Drilling of Holes in Poles & X-Arm, e) Fixing of insulator, X-Arm Knee Bracing Set, Top Clamp f) Fixing of Barbed wire, Danger Plate, g) Painting of pole, complete in all respect. |
| 72 | Erection for Laying of Conductor (ACSR 6/1/3.35 (50mm²)), Stringing and Sagging including binding with insulator complete in all respect. |
| 73 | Erection of Laying and Sagging of GI Wire Guarding complete in all respect. |
| 74 | Erection of HT Stay sets a)Digging of Pit b)Ramming of Pit c) Nozzeling & Tightening d) fixing of Egg insulator complete in all respect. |
| 75 | Filling of RCC Muffs for Steel tubler Pole. 1800mm with concerete filling. |
| 76 | Manual Carriage of ST Poles 10 mtr Long Pole & Allied materail for an average Lead of 1Km |
| 77 | Erection of Earthing Sets a)Digging of Pit b)Fixing of GI wire to the Earth system c) filling of Pit insulator complete in all respect. Please Enable Macros to View BoQ information |