|
| 1 | Item No.1- Excavation for foundation/Pipe trenches by all means in hard murumand boulders W.B.M. road includinbg removing the excavated material upto a distance of 50M beyond the area and and lifts as below , stacking and spreading as directed by Engineer-in-charge , normal dewatering ,preparing the bed for foundation and excluding backfilling…etc comp. |
| 2 | MJP SSR 2023-24 P/37/E-3 |
| 3 | Item No.2 - Excavation in laterite rock masses mechanically, including lift upto 1.5 M including trimming and levelling the bed removing the excavated material upto a distance of 50 metres beyond the area and lift as below stacking by as directed by Engineer-in-charge, normal dewatering excluding backfilling, etc. complete. |
| 4 | MJP SSR 2023-24 P/38/E-8 |
| 5 | Item No.3 : Providing and supplying and Jointing H.D.P.E./in standard lengths Polyethelene Pipes, confirming to IS 4984 / 14151 / 12786 / 13488 with nesessary jointing material like mechanical connector i. e. thread / insert joint / quick release coupler joint / compression fitting joint or flanged joint excluding coupler/specials, including transportation and freight charges, inspection charges, loading / unloading charges, conveyance to the departmental stores & stacking the same in closed shade duly protecting from sunrays & rains, excluding GST levied by GI &GOM in all respect etc. complete. |
| 6 | 90 mm 6 kg/cm2 HDPE pipe |
| 7 | 75 mm 6 kg/cm2 HDPE pipe |
| 8 | 63 mm 6 kg/cm2 HDPE pipe |
| 9 | 50 mm 6 kg/cm2 HDPE pipe |
| 10 | MJP SSR 2023-24 P/123/ IX/ 1-B-iii & ii/A-i |
| 11 | Item No.4 - Lowering,Laying and Jointing H.D.P.E./ M. D. P. E. pipes in proper position including all specials by compression fitting/electrofusion and butt fusion jointing procedure as per relevent IS Code complete with all materials for jointing procedure like Electrofusion machine, Electric heater/butt fusion welding machine with hydraulic jack, top loading clamp etc. and all labours as directed by engineer in charge as per IS-7634 PartII |
| 12 | 90 mm 6 kg/cm2 HDPE pipe |
| 13 | 75 mm 6 kg/cm2 HDPE pipe |
| 14 | 63 mm 6 kg/cm2 HDPE pipe |
| 15 | 50 mm 6 kg/cm2 HDPE pipe |
| 16 | MJP SSR 2023-24 P125/2-viii,vii,vi&v |
| 17 | Item No 5 -Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction, etc. complete. (Bd-A-10/263) |
| 18 | MJP SSR 2023-24 P/41 E-16 |
| 19 | Item No.6 - Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation,surcharging,etc.complete. |
| 20 | MJP SSR 2023-24 P/40 E/15 |
| 21 | Item No.7:- Hydraulic testing of HDPE (PE material)Structured-Wall plastic piping system for non pressure underground line to specified pressure including cost of all materials and labour and water for testing for specified length including cutting, placing end cap making arrangement for filling safe water using reciprocating type pumps which should be able to provide specified test pressure gauges and other necessary equipments, labour, operation charges, etc. required for testing. The rate under this item shall also include cost of retesting, if necessary and reinstating to original position. |
| 22 | 90 mm 6 kg/cm2 HDPE pipe |
| 23 | 75 mm 6 kg/cm2 HDPE pipe |
| 24 | 63 mm 6 kg/cm2 HDPE pipe |
| 25 | 50 mm 6 kg/cm2 HDPE pipe |
| 26 | MJP SSR 23-24 P/No. 126 SECT-I(IX)/3-viii,Vii&vi |
| 27 | Item No 8 - Providing and fixing name board with necessary fitting and colouring etc comp. |
| 28 | GST Please Enable Macros to View BoQ information |