|
| 1 | Percentage BOQ BoQ_Ver3.0 Percentage Normal INR Only INR Select, At Par, Excess (+), Less (-) IOCL Tender Inviting Authority: EE PHED DIVISION SIKAR Name of Work: REMOVING LEAKAGE & CHOKAGE IN PIPE LINES UNDER CITY SUB DN.I SIKAR Contract No: NIT No 01/2026-27 Bidder Name : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER # NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # S.No. Item Description Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT WithTaxes TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) |
| 3 | In all type Soil AC/PVC/HDPE pipe |
| 4 | 50/63/75mm |
| 5 | Add on above item no. 1 for B.T. Road |
| 6 | Add on above item no. 1 for C.C. Road |
| 7 | Add on above no. 1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 8 | Add on above no. 1 item if depth of pipeline is above 3.0 mtr. |
| 9 | 80/90mm |
| 10 | Add on above item no. 1 for B.T. Road |
| 11 | Add on above item no. 1 for C.C. Road |
| 12 | Add on above no. 1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 13 | Add on above no. 1 item if depth of pipeline is above 3.0 mtr. |
| 14 | 100/110mm |
| 15 | Add on above item no. 1 for B.T. Road |
| 16 | Add on above item no. 1 for C.C. Road |
| 17 | Add on above no. 1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 18 | Add on above no. 1 item if depth of pipeline is above 3.0 mtr. |
| 19 | 125/140mm |
| 20 | Add on above item no. 1 for B.T. Road |
| 21 | Add on above item no. 1 for C.C. Road |
| 22 | Add on above no. 1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 23 | Add on above no. 1 item if depth of pipeline is above 3.0 mtr. |
| 24 | 150/160/180mm |
| 25 | Add on above item no. 1 for B.T. Road |
| 26 | Add on above item no. 1 for C.C. Road |
| 27 | Add on above no. 1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 28 | Add on above no. 1 item if depth of pipeline is above 3.0 mtr. |
| 29 | 200/225mm |
| 30 | Add on above item no. 1 for B.T. Road |
| 31 | Add on above item no. 1 for C.C. Road |
| 32 | Add on above no. 1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 33 | Add on above no. 1 item if depth of pipeline is above 3.0 mtr. |
| 34 | 250/280mm |
| 35 | Add on above item no. 1 for B.T. Road |
| 36 | Add on above item no. 1 for C.C. Road |
| 37 | Add on above no. 1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 38 | Add on above no. 1 item if depth of pipeline is above 3.0 mtr. |
| 39 | 300/315mm |
| 40 | Add on above item no. 1 for B.T. Road |
| 41 | Add on above item no. 1 for C.C. Road |
| 42 | Add on above no. 1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 43 | Add on above no. 1 item if depth of pipeline is above 3.0 mtr. |
| 44 | 350mm |
| 45 | Add on above item no. 1 for B.T. Road |
| 46 | Add on above item no. 1 for C.C. Road |
| 47 | Add on above no. 1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 48 | Add on above no. 1 item if depth of pipeline is above 3.0 mtr. |
| 49 | 400mm |
| 50 | Add on above item no. 1 for B.T. Road |
| 51 | Add on above item no. 1 for C.C. Road |
| 52 | Add on above no. 1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 53 | Add on above no. 1 item if depth of pipeline is above 3.0 mtr. |
| 54 | Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost) |
| 55 | In all type Soil |
| 56 | Add on above item no. 2 for B.T. Road |
| 57 | Add on above item no. 2 for C.C. Road |
| 58 | Add on above no. 2 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 59 | Add on above no. 2 item if depth of pipeline is above 3.0 mtr. |
| 60 | 100mm |
| 61 | Add on above item no. 2 for B.T. Road |
| 62 | Add on above item no. 2 for C.C. Road |
| 63 | Add on above no. 2 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 64 | Add on above no. 2 item if depth of pipeline is above 3.0 mtr. |
| 65 | 125mm |
| 66 | Add on above item no. 2 for B.T. Road |
| 67 | Add on above item no. 2 for C.C. Road |
| 68 | Add on above no. 2 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 69 | Add on above no. 2 item if depth of pipeline is above 3.0 mtr. |
| 70 | 150mm |
| 71 | Add on above item no. 2 for B.T. Road |
| 72 | Add on above item no. 2 for C.C. Road |
| 73 | Add on above no. 2 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 74 | Add on above no. 2 item if depth of pipeline is above 3.0 mtr. |
| 75 | 200mm |
| 76 | Add on above item no. 2 for B.T. Road |
| 77 | Add on above item no. 2 for C.C. Road |
| 78 | Add on above no. 2 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 79 | Add on above no. 2 item if depth of pipeline is above 3.0 mtr. |
| 80 | 250mm |
| 81 | Add on above item no. 2 for B.T. Road |
| 82 | Add on above item no. 2 for C.C. Road |
| 83 | Add on above no. 2 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 84 | Add on above no. 2 item if depth of pipeline is above 3.0 mtr. |
| 85 | 300mm |
| 86 | Add on above item no. 2 for B.T. Road |
| 87 | Add on above item no. 2 for C.C. Road |
| 88 | Add on above no. 2 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 89 | Add on above no. 2 item if depth of pipeline is above 3.0 mtr. |
| 90 | 350mm |
| 91 | Add on above item no. 2 for B.T. Road |
| 92 | Add on above item no. 2 for C.C. Road |
| 93 | Add on above no. 2 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 94 | Add on above no. 2 item if depth of pipeline is above 3.0 mtr. |
| 95 | 400mm |
| 96 | Add on above item no. 2 for B.T. Road |
| 97 | Add on above item no. 2 for C.C. Road |
| 98 | Add on above no. 2 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 99 | Add on above no. 2 item if depth of pipeline is above 3.0 mtr. |
| 100 | Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) |
| 101 | In all type Soil |
| 102 | 50/63/75mm |
| 103 | Add on above item no. 3 for B.T. Road |
| 104 | Add on above item no. 3 for C.C. Road |
| 105 | Add on above no. 3 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 106 | Add on above no. 3 item if depth of pipeline is above 3.0 mtr. |
| 107 | 80/90mm |
| 108 | Add on above item no. 3 for B.T. Road |
| 109 | Add on above item no. 3 for C.C. Road |
| 110 | Add on above no. 3 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 111 | Add on above no. 3 item if depth of pipeline is above 3.0 mtr. |
| 112 | 100/110mm |
| 113 | Add on above item no. 3 for B.T. Road |
| 114 | Add on above item no. 3 for C.C. Road |
| 115 | Add on above no. 3 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 116 | Add on above no. 3 item if depth of pipeline is above 3.0 mtr. |
| 117 | 125/140mm |
| 118 | Add on above item no. 3 for B.T. Road |
| 119 | Add on above item no. 3 for C.C. Road |
| 120 | Add on above no. 3 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 121 | Add on above no. 3 item if depth of pipeline is above 3.0 mtr. |
| 122 | 150/160/180mm |
| 123 | Add on above item no. 3 for B.T. Road |
| 124 | Add on above item no. 3 for C.C. Road |
| 125 | Add on above no. 3 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 126 | Add on above no. 3 item if depth of pipeline is above 3.0 mtr. |
| 127 | 200/225mm |
| 128 | Add on above item no. 3 for B.T. Road |
| 129 | Add on above item no. 3 for C.C. Road |
| 130 | Add on above no. 3 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 131 | Add on above no. 3 item if depth of pipeline is above 3.0 mtr. |
| 132 | 250/280mm |
| 133 | Add on above item no. 3 for B.T. Road |
| 134 | Add on above item no. 3 for C.C. Road |
| 135 | Add on above no. 3 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 136 | Add on above no. 3 item if depth of pipeline is above 3.0 mtr. |
| 137 | 300/315mm |
| 138 | Add on above item no. 3 for B.T. Road |
| 139 | Add on above item no. 3 for C.C. Road |
| 140 | Add on above no. 3 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 141 | Add on above no. 3 item if depth of pipeline is above 3.0 mtr. |
| 142 | 350mm |
| 143 | Add on above item no. 3 for B.T. Road |
| 144 | Add on above item no. 3 for C.C. Road |
| 145 | Add on above no. 3 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 146 | Add on above no. 3 item if depth of pipeline is above 3.0 mtr. |
| 147 | 400mm |
| 148 | Add on above item no. 3 for B.T. Road |
| 149 | Add on above item no. 3 for C.C. Road |
| 150 | Add on above no. 3 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 151 | Add on above no. 3 item if depth of pipeline is above 3.0 mtr. |
| 152 | Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) |
| 153 | In all type Soil |
| 154 | 80 mm |
| 155 | Add on above item no. 4 for B.T. Road |
| 156 | Add on above item no. 4 for CC Road |
| 157 | Add on above item no. 4 if depth of pipe line is above 1.5 mtr to 3.0 mtr |
| 158 | Deduct on above item no. 4 if valve is fixed at plinth level / platform i.e. no excavation is required |
| 159 | 100 mm |
| 160 | Add on above item no. 4 for B.T. Road |
| 161 | Add on above item no. 4 for CC Road |
| 162 | Add on above item no. 4 if depth of pipe line is above 1.5 mtr to 3.0 mtr |
| 163 | Deduct on above item no. 4 if valve is fixed at plinth level / platform i.e. no excavation is required |
| 164 | 125 mm |
| 165 | Add on above item no. 4 for B.T. Road |
| 166 | Add on above item no. 4 for CC Road |
| 167 | Add on above item no. 4 if depth of pipe line is above 1.5 mtr to 3.0 mtr |
| 168 | Deduct on above item no. 4 if valve is fixed at plinth level / platform i.e. no excavation is required |
| 169 | 150 mm |
| 170 | Add on above item no. 4 for B.T. Road |
| 171 | Add on above item no. 4 for CC Road |
| 172 | Add on above item no. 4 if depth of pipe line is above 1.5 mtr to 3.0 mtr |
| 173 | Deduct on above item no. 4 if valve is fixed at plinth level / platform i.e. no excavation is required |
| 174 | 200 mm |
| 175 | Add on above item no. 4 for B.T. Road |
| 176 | Add on above item no. 4 for CC Road |
| 177 | Add on above item no. 4 if depth of pipe line is above 1.5 mtr to 3.0 mtr |
| 178 | Deduct on above item no. 4 if valve is fixed at plinth level / platform i.e. no excavation is required |
| 179 | 250 mm |
| 180 | Add on above item no. 4 for B.T. Road |
| 181 | Add on above item no. 4 for CC Road |
| 182 | Add on above item no. 4 if depth of pipe line is above 1.5 mtr to 3.0 mtr |
| 183 | Deduct on above item no. 4 if valve is fixed at plinth level / platform i.e. no excavation is required |
| 184 | 300 mm |
| 185 | Add on above item no. 4 for B.T. Road |
| 186 | Add on above item no. 4 for CC Road |
| 187 | Add on above item no. 4 if depth of pipe line is above 1.5 mtr to 3.0 mtr |
| 188 | Deduct on above item no. 4 if valve is fixed at plinth level / platform i.e. no excavation is required |
| 189 | 350 mm |
| 190 | Add on above item no. 4 for B.T. Road |
| 191 | Add on above item no. 4 for CC Road |
| 192 | Add on above item no. 4 if depth of pipe line is above 1.5 mtr to 3.0 mtr |
| 193 | Deduct on above item no. 4 if valve is fixed at plinth level / platform i.e. no excavation is required |
| 194 | 400 mm |
| 195 | Add on above item no. 4 for B.T. Road |
| 196 | Add on above item no. 4 for CC Road |
| 197 | Add on above item no. 4 if depth of pipe line is above 1.5 mtr to 3.0 mtr |
| 198 | Deduct on above item no. 4 if valve is fixed at plinth level / platform i.e. no excavation is required |
| 199 | Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. |
| 200 | In all type Soil |
| 201 | 75 mm |
| 202 | Add on above item no. 5 for B.T. Road |
| 203 | Add on above item no. 5 for CC Road |
| 204 | Add on above item no. 5 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. |
| 205 | Add on above item no. 5 if depth of pipe line is above 3.0 mtr. |
| 206 | 90/80 mm |
| 207 | Add on above item no. 5 for B.T. Road |
| 208 | Add on above item no. 5 for CC Road |
| 209 | Add on above item no. 5 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. |
| 210 | Add on above item no. 5 if depth of pipe line is above 3.0 mtr. |
| 211 | 110/100 mm |
| 212 | Add on above item no. 5 for B.T. Road |
| 213 | Add on above item no. 5 for CC Road |
| 214 | Add on above item no. 5 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. |
| 215 | Add on above item no. 5 if depth of pipe line is above 3.0 mtr. |
| 216 | 140/125 mm |
| 217 | Add on above item no. 5 for B.T. Road |
| 218 | Add on above item no. 5 for CC Road |
| 219 | Add on above item no. 5 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. |
| 220 | Add on above item no. 5 if depth of pipe line is above 3.0 mtr. |
| 221 | 180/160/150 mm |
| 222 | Add on above item no. 5 for B.T. Road |
| 223 | Add on above item no. 5 for CC Road |
| 224 | Add on above item no. 5 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. |
| 225 | Add on above item no. 5 if depth of pipe line is above 3.0 mtr. |
| 226 | 225/200 mm |
| 227 | Add on above item no. 5 for B.T. Road |
| 228 | Add on above item no. 5 for CC Road |
| 229 | Add on above item no. 5 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. |
| 230 | Add on above item no. 5 if depth of pipe line is above 3.0 mtr. |
| 231 | 250 mm |
| 232 | Add on above item no. 5 for B.T. Road |
| 233 | Add on above item no. 5 for CC Road |
| 234 | Add on above item no. 5 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. |
| 235 | Add on above item no. 5 if depth of pipe line is above 3.0 mtr. |
| 236 | 300 mm |
| 237 | Add on above item no. 5 for B.T. Road |
| 238 | Add on above item no. 5 for CC Road |
| 239 | Add on above item no. 5 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. |
| 240 | Add on above item no. 5 if depth of pipe line is above 3.0 mtr. |
| 241 | Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. |
| 242 | In all type Soil |
| 243 | 80 mm |
| 244 | Add on above item no. 6 for B.T. Road |
| 245 | Add on above item no. 6 for CC Road |
| 246 | Add on above item no. 6 if depth of pipe line is above 1.5 mtr up to 3.0 mtr. |
| 247 | Add on above item no. 6 if depth of pipe line is above 3.0 mtr |
| 248 | 100 mm |
| 249 | Add on above item no. 6 for B.T. Road |
| 250 | Add on above item no. 6 for CC Road |
| 251 | Add on above item no. 6 if depth of pipe line is above 1.5 mtr up to 3.0 mtr. |
| 252 | Add on above item no. 6 if depth of pipe line is above 3.0 mtr |
| 253 | 125 mm |
| 254 | Add on above item no. 6 for B.T. Road |
| 255 | Add on above item no. 6 for CC Road |
| 256 | Add on above item no. 6 if depth of pipe line is above 1.5 mtr up to 3.0 mtr. |
| 257 | Add on above item no. 6 if depth of pipe line is above 3.0 mtr |
| 258 | 150 mm |
| 259 | Add on above item no. 6 for B.T. Road |
| 260 | Add on above item no. 6 for CC Road |
| 261 | Add on above item no. 6 if depth of pipe line is above 1.5 mtr up to 3.0 mtr. |
| 262 | Add on above item no. 6 if depth of pipe line is above 3.0 mtr |
| 263 | 225/200 mm |
| 264 | Add on above item no. 6 for B.T. Road |
| 265 | Add on above item no. 6 for CC Road |
| 266 | Add on above item no. 6 if depth of pipe line is above 1.5 mtr up to 3.0 mtr. |
| 267 | Add on above item no. 6 if depth of pipe line is above 3.0 mtr |
| 268 | 250 mm |
| 269 | Add on above item no. 6 for B.T. Road |
| 270 | Add on above item no. 6 for CC Road |
| 271 | Add on above item no. 6 if depth of pipe line is above 1.5 mtr up to 3.0 mtr. |
| 272 | Add on above item no. 6 if depth of pipe line is above 3.0 mtr |
| 273 | 300 mm |
| 274 | Add on above item no. 6 for B.T. Road |
| 275 | Add on above item no. 6 for CC Road |
| 276 | Add on above item no. 6 if depth of pipe line is above 1.5 mtr up to 3.0 mtr. |
| 277 | Add on above item no. 6 if depth of pipe line is above 3.0 mtr |
| 278 | Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree refill the pit from excavated sand by ramming it & upto ground level for entire job contractor will use his own T&P & labour. |
| 279 | Add on above item no. 7 for B.T. Road |
| 280 | Add on above item no. 7 for CC Road |
| 281 | Add on above item no. 7 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr |
| 282 | Removal of sluice valve in existing pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost) |
| 283 | In all type Soil |
| 284 | 80 mm dia pipe to 100mm |
| 285 | Add on above item no. 8 for B.T. Road |
| 286 | Add on above item no. 8 for CC Road |
| 287 | Add on above item no. 8 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr |
| 288 | 125 mm dia pipe to 150mm |
| 289 | Add on above item no. 8 for B.T. Road |
| 290 | Add on above item no. 8 for CC Road |
| 291 | Add on above item no. 8 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr |
| 292 | 200 mm dia pipe to 250mm |
| 293 | Add on above item no. 8 for B.T. Road |
| 294 | Add on above item no. 8 for CC Road |
| 295 | Add on above item no. 8 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr |
| 296 | 300 mm dia pipe to 350mm |
| 297 | Add on above item no. 8 for B.T. Road |
| 298 | Add on above item no. 8 for CC Road |
| 299 | Add on above item no. 8 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr |
| 300 | 400mm |
| 301 | Add on above item no. 8 for B.T. Road |
| 302 | Add on above item no. 8 for CC Road |
| 303 | Add on above item no. 8 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr |
| 304 | Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). |
| 305 | In all type Soil |
| 306 | 80 mm to 110 mm |
| 307 | Add on above item no. 9 for B.T. Road |
| 308 | Add on above item no. 9 for CC Road |
| 309 | Add on above item no.9 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr |
| 310 | 125 mm to 165 mm |
| 311 | Add on above item no. 9 for B.T. Road |
| 312 | Add on above item no. 9 for CC Road |
| 313 | Add on above item no.9 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr |
| 314 | 200 mm to 300 mm |
| 315 | Add on above item no. 9 for B.T. Road |
| 316 | Add on above item no. 9 for CC Road |
| 317 | Add on above item no.9 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr |
| 318 | Work of Inter Connection in CI/DI/MS pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). |
| 319 | In all type Soil |
| 320 | 80 mm to 100 mm |
| 321 | Add on above item no.10 for B.T. Road |
| 322 | Add on above item no.10 for CC Road |
| 323 | Add on above item no.10 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr |
| 324 | 125 mm to 150 mm |
| 325 | Add on above item no.10 for B.T. Road |
| 326 | Add on above item no.10 for CC Road |
| 327 | Add on above item no.10 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr |
| 328 | 200 mm to 300 mm |
| 329 | Add on above item no.10 for B.T. Road |
| 330 | Add on above item no.10 for CC Road |
| 331 | Add on above item no.10 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr |
| 332 | 350 mm to 450 mm |
| 333 | Add on above item no.10 for B.T. Road |
| 334 | Add on above item no.10 for CC Road |
| 335 | Add on above item no.10 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr |
| 336 | 500 mm to 600 mm |
| 337 | Add on above item no.10 for B.T. Road |
| 338 | Add on above item no.10 for CC Road |
| 339 | Add on above item no.10 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr |
| 340 | Labour charges for removal of complaint of polluted water supply to the consumers |
| 341 | Survey of the locality of polluted water supply for preliminary assessment of source of pollution during supply hours |
| 342 | Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size |
| 343 | In all type Soil |
| 344 | 50 to 75 mm |
| 345 | Add on above item no.11.2 for B.T. Road |
| 346 | Add on above item no.11.2 for CC Road |
| 347 | Add on above item no. 11.2 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. |
| 348 | 80-110 mm |
| 349 | Add on above item no.11.2 for B.T. Road |
| 350 | Add on above item no.11.2 for CC Road |
| 351 | Add on above item no. 11.2 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. |
| 352 | 125 to 165 mm |
| 353 | Add on above item no.11.2 for B.T. Road |
| 354 | Add on above item no.11.2 for CC Road |
| 355 | Add on above item no. 11.2 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. |
| 356 | 200 to 300 mm |
| 357 | Add on above item no.11.2 for B.T. Road |
| 358 | Add on above item no.11.2 for CC Road |
| 359 | Add on above item no. 11.2 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. |
| 360 | 350 to 400 mm |
| 361 | Add on above item no.11.2 for B.T. Road |
| 362 | Add on above item no.11.2 for CC Road |
| 363 | Add on above item no. 11.2 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. |
| 364 | Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution CI/DI/MS pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size |
| 365 | In all type Soil |
| 366 | 80-100 mm |
| 367 | Add on above item 11.3 for B.T. Road |
| 368 | Add on above item no. 11.3 for CC Road |
| 369 | Add on above item no.11.3 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. |
| 370 | 125 to 150 mm |
| 371 | Add on above item 11.3 for B.T. Road |
| 372 | Add on above item no. 11.3 for CC Road |
| 373 | Add on above item no.11.3 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. |
| 374 | 200 to 300 mm |
| 375 | Add on above item 11.3 for B.T. Road |
| 376 | Add on above item no. 11.3 for CC Road |
| 377 | Add on above item no.11.3 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. |
| 378 | 350 to 400 mm |
| 379 | Add on above item 11.3 for B.T. Road |
| 380 | Add on above item no. 11.3 for CC Road |
| 381 | Add on above item no.11.3 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. |
| 382 | Restoration of bitumen road by patch work of WBM using crushed / broken aggregate as per the standard specification and consolidation with hand rammer spreading and consolidation of binding material , cleaning of surface of WBM and providing of seal & tack coat as per site condition by using ready cold mix up to the satisfaction of engineer in charge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job. |
| 383 | Restoration of cement concrete road including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compacting cement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction of engineer incharge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job. Total in Figures 340243.70000000007 340243.70000000007 INR Three Lakh Forty Thousand Two Hundred & Forty Three and Paise Seventy Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 INR Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |