| 1 | Ashoka Chakra-• Designing, Fabrication, Installation of Sculptures with all required machinery, purchase & carriage of Scrap/junk/discard Metal material The structure needs to be made with a minimum area as per below details, using the Scrap/junk/discard Metal material with electrical, mechanical & Art work.• Minimum Height – 7 feet• Minimum Depth – 1.5 feet• Minimum Length – 7 feet (Including basic plastered foundation work) Applying primer coats (two or more coats) of approved quality primer, painting with P.U. Coating automotive paint of approved quality (two or more coats) with giving proper finishing with all necessary work as per direction of work-in-charge. |
| 2 | Category 1 Artist |
| 3 | Assistant Artists |
| 4 | Architect (designer) |
| 5 | Specialized Painters |
| 6 | Welders |
| 7 | Helpers |
| 8 | Purchase of Scrap material (Approx.) |
| 9 | Material used for fabrication |
| 10 | Transportation of junk material (Tractor with trolly ,hydra and labour) |
| 11 | PU Paint and other painting material |
| 12 | MACHINERY (RENTAL FOR WELDING MACHINES GRINDR, BIG CUTTER, LASER CUTTING MACHINE |
| 13 | FLOOD LED LIGHTS FORM SECULPTURE LIGHTINING ELECTRIC WORK |
| 14 | BASE/ FOUNDATION WORK |
| 15 | GST 18 % |
| 16 | CONTRACTOR PROFIT 8 % |
| 17 | Ashoka Stambh-• Designing, Fabrication, Installation of Sculptures with all required machinery, purchase & carriage of Scrap/junk/discard Metal material The structure needs to be made with a minimum area as per below details, using the Scrap/junk/discard Metal material with electrical, mechanical & Art work.• Minimum Height – 10 feet• Minimum Depth – 1.5 feet• Minimum Length – 1.5 feet (Including basic plastered foundation work) Applying primer coats (two or more coats) of approved quality primer, painting with P.U. Coating automotive paint of approved quality (two or more coats) with giving proper finishing with all necessary work as per direction of work-in-charge. |
| 18 | Category 1 Artist |
| 19 | Assistant Artists |
| 20 | Architect (designer) |
| 21 | Specialized Painters |
| 22 | Welders |
| 23 | Helpers |
| 24 | Purchase of Scrap material (Approx.) |
| 25 | Material used for fabrication |
| 26 | Transportation of junk material (Tractor with trolly ,hydra and labour) |
| 27 | PU Paint and other painting material |
| 28 | MACHINERY (RENTAL FOR WELDING MACHINES GRINDR, BIG CUTTER, LASER CUTTING MACHINE |
| 29 | FLOOD LED LIGHTS FORM SECULPTURE LIGHTINING ELECTRIC WORK |
| 30 | BASE/ FOUNDATION WORK |
| 31 | GST 18 % |
| 32 | CONTRACTOR PROFIT 8 % |
| 33 | India Map -• Designing, Fabrication, Installation of Sculptures with all required machinery, purchase & carriage of Scrap/junk/discard Metal material The structure needs to be made with a minimum area as per below details, using the Scrap/junk/discard Metal material with electrical, mechanical & Art work.• Minimum Height – 8 feet• Minimum Depth – 1 feet• Minimum Length – 8 feet (Including basic plastered foundation work) Applying primer coats (two or more coats) of approved quality primer, painting with P.U. Coating automotive paint of approved quality (two or more coats) with giving proper finishing with all necessary work as per direction of work-in-charge. |
| 34 | Category 1 Artist |
| 35 | Assistant Artists |
| 36 | Architect (designer) |
| 37 | Specialized Painters |
| 38 | Welders |
| 39 | Helpers |
| 40 | Purchase of Scrap material (Approx.) |
| 41 | Material used for fabrication |
| 42 | Transportation of junk material (Tractor with trolly ,hydra and labour) |
| 43 | PU Paint and other painting material |
| 44 | MACHINERY (RENTAL FOR WELDING MACHINES GRINDR, BIG CUTTER, LASER CUTTING MACHINE |
| 45 | FLOOD LED LIGHTS FORM SECULPTURE LIGHTINING ELECTRIC WORK |
| 46 | BASE/ FOUNDATION WORK |
| 47 | GST 18 % |
| 48 | CONTRACTOR PROFIT 8 % Please Enable Macros to View BoQ information |