| 1 | Note- The Contractor shall quote his/ their rates without GST. GST will be paid extra by the Department as per prevailing rate at the time of payment. |
| 2 | Excavation for StructuresEarth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Manual Means |
| 3 | Up to 3.0 M. |
| 4 | 3.0 to 6.0 M. |
| 5 | Above 6.0 M. |
| 6 | Plain cement concrete in open foundation complete as per drawing and technical specifications. PCC Grade M15 |
| 7 | Reinforced cement concrete in open foundation complete as per drawing and technical specifications. RCC Grade M 25 Using Concrete Mixer |
| 8 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawing and technical specifications |
| 9 | Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications. RCC Grade M 25 Using Concrete Mixer |
| 10 | Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 (The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First revision'2014) and IS 1786:2008 clause no. 1.6) |
| 11 | Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Coursed rubble masonry (1st sort) In 1:4 cement mortar |
| 12 | Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Random rubble masonry In cement mortar (1:5) |
| 13 | Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications |
| 14 | Supply and fabrication of steel truss bridge as per detailed drawing attached including supply of all structural steel E-250 confirming IS 226 - 1969 required for proper completion of the bridge including ground errection of the bridge and one coat of approved quality anticirrosive (red oxide) paint of confirming IS 5660, all T&P, nuts and bolts, washers and also including supply and fixing of shop rivets required as per drawing, required equipment shall be arranged by the contractor at his own cost which shall be taken back by the contractor after satisfactory execution of the job, the rates shall include ground errection in the workshop and its dismentling after inspection, approval and removing defects, match marking of all parts, numbering and proper stacking in the premises of workshop before cartage to site of work. The work shall be executed in accordance to IS - 1915. The rates shall include cost of all material, its wastage, cutting, bending if required, welding, making holes, shop riveting, labour, T&P etc. required for proper completion of the work. including cost of cartage from workshop to Bridge Site including safe stacking of parts. |
| 15 | Erection of Steel Truss (Girder) Bridge (up to 60m span) as per drawing with required camber including cartage of fabricated parts from the place of stack near site including submission of launching plan by the contractor, (duly vetted by a recognised reputable institution/ consultant if required) and approved by the engineer-in-charge. Service bolts to used shall be of approved make. The rate including of cost of all labour, T&P, equipments, civil work and consumables, cost of arranging, fabricating, errecting and dismantling of erection scheme including the cost of its designing, revising, supervision by contractor's designeer at site during erection, also including cost of all safety measures and necessary insurances of bridge and labours for proper completion of the work as per MORTH specification no. 1905 with due regard of mansoon and as per directions of the engineer-in-charge. |
| 16 | Providing, fitting and fixing mild steel railing complete as per drawing and Technical Specification |
| 17 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification |
| 18 | Providing and laying of strip seal expansion joint catering to maximum horizontal movement upto 70 mm ( complete as per approved drawings and standard specifications ) to be installed by the manufacturer / supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation |
| 19 | Painting on Steel Surfaces Providing and applying two coats of readymix paint of approved brand on steel suface after through cleaning of surface to give an even. |
| 20 | NSI ITEM |
| 21 | Supplying,Fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications (Including Cost of Bearing) complete including all accessories as per drawing and Technical Specifications. Please Enable Macros to View BoQ information |