|
| 1 | Cutting of grass of shoulder/wing areas of runway and taxi track area with mechanical grass cutter suitable for runway area with cutting up to 50 to 150 mm height of grass and removing grasses to a distance exc 250m but n.exc 500m complete all as specified and directed. |
| 2 | Cutting and cleaning of grown vegetation as in edges n exc width of 1.5 mtr alongwith runway drains including removal and disposal of the grass/vegetation to a distance exc 250m but not exc 500m complete all as specified and directed. |
| 3 | Cleaning of covered RCC water drain of cross section and depth (max) by high pressure water Jetting Machine (min 150-250 Bar) along with vacum suction arrangements without removing RCC covers including insertion of jetting hose through available manholes /access opening, breaking and loosing of silt, sludge, vegetation and debris, flushing and ensuring free flow of drain, simultaneous suction and removal of sludge, disposal of removed materials to approved dumping ground, including all leads and lifts complete all as specified and directed. |
| 4 | M&L for soil filling or restoration of eroded or damaged runway shoulder(sides) cuased by rainfall using approved earth including cutting/filling of eroded sections, dressing and compaction with road roller to restore the side profile to achieve uniform slope and profile, as per the original croos section or complete all as specified and directed.Note : Rate shall include the cost of labour, earth, compaction ,surface dressing incl carrying approved soil out side MoD land. |
| 5 | M&L for preparation of old/new concrete/bituminous painted surface and applying one coat of water based road marking paint of white/yellow/orange or any other shades as approved on surfaces of any description over 10 cm width of grith not otherwise described with rewritting letters,figures,symbols,line etc complete all as specified and directed. |
| 6 | Providing mechanical earth movers plant /JCB of capacity 7.50 ton for levelling of existing ground,complete all as specified and directed.Note :- Maintain logbook details of date and time during operation of the JCB/Earth movers, location shall be maintained and jointely signed by Engr-in -Charge and contractor. Contractor shall produce operator driving license and all necessary documents of plants prior to use.Unit rate shall be deemed to be included for providing plant (JCB/Earth movers) , operator,helper and FOL (Fuel,oil and lubricants) etc and nothing extra shall be payable on this account. |
| 7 | Grubbing up tree trunkgirth exceeding 30 cm but n.exc 100cm including cutting of trunk portion protruding over ground, digging out roots, filling holes and leveling off ground, stacking of serviceable material and removing of unserviceable material to a distance n.exc 50 m and clearing site complete all as specified and directed. |
| 8 | Grubbing up tree trunkgirth exceeding 100 cm but n.exc 150cm including cutting of trunk portion protruding over ground, digging out roots, filling holes and leveling off ground, stacking of serviceable material and removing of unserviceable material to a distance n.exc 50 m and clearing site complete all as specified and directed. |
| 9 | Grubbing up tree trunkgirth exceeding 150 cm but n.exc 200cm including cutting of trunk portion protruding over ground, digging out roots, filling holes and leveling off ground, stacking of serviceable material and removing of unserviceable material to a distance n.exc 50 m and clearing site complete all as specified and directed. Material and labour laying well burnt old size bricks, straight or curved on plan , laid flat with width equal to length of brick , laid dry over electric cable for protection all as specified. Please Enable Macros to View BoQ information |