| 1 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge. |
| 2 | Dismantling old plaster and pointing in cement or lime and raking out jointing to 15mm depth. Watring and disposal of unserviceable materials with all leads, all complete job as per direction of E/I Dismantling C.P. Water Proof cement Plaster. |
| 3 | Dismentling of RCC slab of OHT including servicible material in countable stack within 15 M lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. |
| 4 | Providing 19mm thick water proof cement plaster (1:3) with clean coarse sand of F.M. wth 5% cico or any other approved water proofing compound with cement puning including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I |
| 5 | Providing 12mm thick cement plaster (1:3) with clean coarse sand of F.M. 1.5 with 5% cico or any approved water proofing compound ncluding screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I. |
| 6 | Providing R.C.C.M-20 in nominal mix of (1:1.5:3) slab of desire size with approved quality of stone chips (20mm to 6mm size) graded and clean coarse of F.M 2.5 to 3 including curing (but excluding the cost of reinforcement),taxes and royalty all complete as per building specification and direction of E/I. |
| 7 | Providing T.M.T steel reinforcement of different dia rods as per approved design and drawing including carriage of M.S bars to work site, cutting bending and binding with annealed wire with cost of wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. |
| 8 | Providing two coats of snocem of approved shade & make over new surface with approved quality including cost of cleaning surface throughly and removing the scales of smoke and mosh marks with jhama rubbing, scaffolding, washing of floors and taxes all complete as per building specification and direction of E/I |
| 9 | Cleaning and desilting of1,00,000 liter water tower including removal of honey comb with dangerous & poisonous bees at the night time, including supplying all tools, labours, equipments, materials etc. all complete job.Skilled labour |
| 10 | Unskilled labour |
| 11 | Leak Repair of OHT surface with cement and powder application, including cost of all labour & materials dismantling old terrace where necessary, disposal of unserviceable material all complete as per building specification and direction of E/I |
| 12 | cleaning jungle including uprooting of rank vegetation, grass, bush wood, tree and saplings of girth up to 30 cm measured at a height of 1m above ground level and removal of rubbish up to a distance of 50m outiside the periphery of the area cleared. |
| 13 | Extra for each coat of cement wash, distemper paint or snowcem over exterior surface for each consecutive floor above first floor including scaffolding etc all complete as per building specification & direction of E/I. |
| 14 | Providing R.C.C. M20 in patching work including supplying all tools labours equipments etc. all complete job |
| 15 | Providing Painting over steel surface including supplying all tools labour equipments etc. all complete job. |
| 16 | Cost of electrification with replacement of damaged switch board, plug, switch, holder & wire etc. as per direction of E/I and Providing repairing of iron ladder and Railing including supplying all materials labours and doing necessary welding etc. |
| 17 | Carriage of material 10% |
| 18 | GST @ 18% |
| 19 | Add 1% Labour cess Please Enable Macros to View BoQ information |