| 1 | Dismentaling pucca brick or lime work including stacking serviciable materials in countable stacks within 15m lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. (5.10.1) |
| 2 | Dismantling old plaster work and pointing in cement or lime and racking out joints to 15mm depth, watering and disposal of unserviceable materials with all leads all complete as per direction of E/I. 5.10.7 |
| 3 | Providing designation 75B brick work in C.M.(1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10 mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curring, taxes and royalty all complete as per building specification and direction of E/I. 5.2.6 |
| 4 | Providing and laying position cement concrete of specified grade concrete excluding the cost of centering and shuttering - all work upto plinth level.(1:1.5:3) (1 Cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20mm nominal size) (5.3.1.1) |
| 5 | Providing 12mm cement plaster (1:3) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I. 5.7.1 |
| 6 | Providing 1.5mm cement punning including curing, carriage of water with all leads and lift as per building specification and direction of E/I. 5.7.11 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). 5.3.11 |
| 8 | providing Tor steel reinforcement of 10mm,12mm,& 16mm. dia bars as per approved design and drawing inclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. 5.5.5 |
| 9 | providing Tor steel reinforcement of 8mm dia rods as per approved design and drawing exclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. TMT Fe 500 (only valid for SAIL & TATA STEEL) 5.5.4 |
| 10 | Carrige of Material : (a) Sand lead 6 km |
| 11 | (b) Stone chips lead 52 KM |
| 12 | (c) Bricks lead 15 km |
| 13 | ADD 18% GST |
| 14 | ADD 1% LABOUR CESS Please Enable Macros to View BoQ information |