| 1 | E/W in excavation in foundation trenches in ordinary soil -do- -do- all complete job as per specification and direction of E/I. (5.1.1) |
| 2 | Extra for E/W in hard soil vide classification of soil item B -do- -do- all complete job as per specification and direction of E/I. (5.1.2) |
| 3 | Providing clean coarse sand filling in foundation trenches and plinth -do- -do- all complete job. (5.1.10) |
| 4 | Providing R.C.C./P.C.C. M-150 with nominal mix of (1:2:4) in foundation -do- -do- all complete job as per specification and direction of E/I. (5.3.1.2) |
| 5 | Providing random rubble stone masonary in C.M. (1:6) in Foundation and Plinth -do- -do- all complete job as per specification and direction of E/I. (5.2.29) |
| 6 | Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20mm nominal size). (5.3.5.) |
| 7 | Providing R.C.C. M-20 with nomimal mix of (1:1.5:3) in lintel with approved quality of Stone Chips 20 mm to 6 mm size graded and clean coarse sand -do- -do- all complete job as per specification and direction of E/I. (5.3.10) |
| 8 | Providing R.C.C. (1:1.5:3) in Roof Slab with approved quality of Stone Chips and clean coarse sand -do- -do- all complete job as per specification and direction of E/I.(5.3.11). |
| 9 | S/F/F 20 gauge G.C.I. sheet gate -do- -do- all complete job as per specification and direction of E/I. (5.5.29) |
| 10 | S/F/F M.S. Grill in windows fitted and fixed -do- -do- all complete job as per specification and direction of E/I. (5.5.30) |
| 11 | Providing designation 75A one brick Flat soling including the cost of materials , royalty all taxes etc but excluding the cost of cariiage all complete as per building specification and direction of E/I. (5.6.3) |
| 12 | Providing 1.5mm thick Cement punning including curing ,carriage of water with all leads and lifts as per building specification and direction of E/I. (5.7.11) |
| 13 | Providing 25mm thick C.P. (1:6) with clean coarse sand -do- -do- all complete job as per specification and direction of E/I. (5.7.13) |
| 14 | Providing white washing three coats over new surface -do- -do- all complete job as per specification and direction of E/I. (5.8.3) |
| 15 | Providing two coats of primer over steel surface -do- -do- all complete job as per specification and direction of E/I. (5.8.41) |
| 16 | Providing two coats of painting with ready mixed paint over steel surface -do- -do- all complete job as per specification and direction of E/I. (5.8.43) |
| 17 | Providing cost of M.S. Reinforcement with cutting, bending, binding and placing in postion -do- -do- all complete job per specification and direction of E/I. (5.5.4) |
| 18 | Carriage of materials.(i) Sand - |
| 19 | (ii) Cement - |
| 20 | (iii) Stone Chips - |
| 21 | (v) Boulder - |
| 22 | (vi) Steel - |
| 23 | 5 HP solar power generating system for surface and open well pumping system with fencing and all other accessories. (GST- 5% for 70% of Material Value & GST- 18% for 30% of Material Value Included) |
| 24 | Solar 5 HP VFD (GST- 5% of Material Value Included) |
| 25 | 75mm dia H.D.E.P @2.5kg pressure coil |
| 26 | 75mm Dia PCN |
| 27 | Labour cost for Supplying all types of fittings for laying pipelines |
| 28 | Supplying labour and equipment for digging well (vide classification of soil item-A) -do- -do- all complete Job as per specificition and direction of E/l.(3.1.64) |
| 29 | Extra for earth work in each additional lift of 1M -do- -do- all complete Job as per specificition and direction of E/l. (3.1.67)(i) 1M to 5M - |
| 30 | E/W in filling in foundation trenches or back filling -do- -do- all complete job as per specification and direction of E/I. (5.1.7) |
| 31 | Providing R.C.C. M-20 with nominal mix of (1:1.5:3) in lintel with approved quality of stone chips 20mm to 6mm size graded and clean coarse sand of requisite F.M (2.5 to 3) including screening, shuttening, mixing cement mortar in mixer and placing in position, vibriting, striking, curing (but excluding the cost of reinforcement) taxes and royalty all complete as per specification and direction of E/l. (5.3.9.1) |
| 32 | Supplying materials and labour for providiag boulder masonary work in Cement Mortar (1:6) in steining wall and in parapet -do- -do- all complete job as per building specificition and direction of E/l. (3.1.69) |
| 33 | Providing 25mm precast R.C.C. M-150 with nominal mix of (1:2:4) jali with approved quality of stone chips of 6mm nominal size and properly grouted with cement mortar (1:3) including cost of curing, scaffolding and finishing all complete as per building specification and direction of E/l. (5.3.21.3 BCD) |
| 34 | Supplying materials and labour for fixing 20mm dia M.S. bar steps in steining wall of 0.30 M interval and staggered in (1:2:4) cement concrete including scaffolding and curing etc. all complete as per specification and direction of E/I. (3.1.71) |
| 35 | Providing R.C.C. (1:1½:3) in Cover Slab with approved quality of Stone Chips and clean coarse sand -do- -do- all complete job as per specification and direction of E/I. (5.3.9.1 BCD) |
| 36 | Providing R.C.C. (1:1½:3) in Beam with approved quality of Stone Chips and clean coarse sand -do- -do- all complete job as per specification and direction of E/I. (5.3.11 BCD) |
| 37 | Providing 25mm thick C.P. (1:6) with clean coarse sand -do- -do- all complete job as per specification and direction of E/I. (5.7.13) |
| 38 | Providing 1.5mm thick cement punning -do- -do- all complete job as per specification and direction of E/I. (5.7.11) |
| 39 | Providing cost of M.S. Reinforcement with cutting, bending, binding and placing in postion -do- -do- all complete job per specification and direction of E/I. (5.5.4) |
| 40 | Add 18% G.S.T |
| 41 | Add 1% Labour Cess Please Enable Macros to View BoQ information |