| 1 | Earth work in excavation as per IS 3114/1965 for laying of different type and sizes of pipe so as to give one meter average cover over the socket of pipe with disposal of excavated earth within initial lead and lift as per specification and direction of Engineer-in-ChargeFor classification of soil item (A) |
| 2 | Earth work in excavation as per IS 3114/1965 for laying of different type and sizes of pipe so as to give one meter average cover over the socket of pipe with disposal of excavated earth within initial lead and lift as per specification and direction of Engineer-in-ChargeFor classification of soil item B) |
| 3 | Supplying tools and cutting road s well restoring the same as per specificaion and direction of E/IWater bound macadum raod (taken out materials will be used) For cutting road as per requirement. |
| 4 | Providing and Supplying ISI mark Centrifugally cat (Spun) Ductile Iron Pipes of 100 mm and above all diameter for water works with socket and spigot ends confirming to IS 8329/2000 in the standard working lengths of 4.5, 5.5 & 6 m suitable for classification K-7 & K-9 suitable for push-on-joint (rubber gusket D jointing) with cement mortar lining inside the pipes with outside zinc and bittuminous coating. |
| 5 | (a) Govt. Middle School, Tatisilwai to before EEF Ground - (i) 150mm dia D.I. K-7 pipe - 550.00M |
| 6 | (ii) 200mm dia D.I. K-7 pipe - 440.00M |
| 7 | (b) Tatisilwai junction foot overbridge to JAP 2 More Tatisilwai- 150mm dia D.I. K-7 pipe - 525.00M |
| 8 | Providing and supplying ISI standard D.I. Specials and fitting with sealing rubber gasket of SBR complete with cast iron follower gland and M.S. nuts and bolts coated or other wise protected from rusting and suitable for D.I. pipes including cost of labours and material and transportation to store/site, loading unloading including all taxes but excluding freight etc complete as per IS 9523 (Taking 5% cost of pipe)(971630+999944+927465) = 28990395% of Rs. 2899039 = 144951.95 |
| 9 | Supplying labours tools tackles, lubricant etc, for laying and jointing C.I./SS tyton pipes (Class LA) in trenches supplying rubber gasket (Rubber gaskets confirming to I.S.S.-5382- 1969) and making gasket joints including providing night guard, barrier and red light to safe guard, against accident, all complete (Pipe to be supplied departmenatlly free of cost and laying of pipes is to be done as per I.S.S.3114-1985) as per design, specification and direction of E/I |
| 10 | (a) Govt. Middle School to before EEF Ground - (i) 150mm dia D.I. K-7 pipe - 550.00M |
| 11 | (ii) 200mm dia D.I. K-7 pipe - 440.00M |
| 12 | (b) Tatisilwai junction foot overbridge to JAP 2 More, Tataisilwai- 150mm dia D.I. K-7 pipe - 525.00M |
| 13 | Manufacturing, providing and supplying spirally welded /ERW / SAW / fabricted M.S. Pipe (Commercial quality) including procurements of plates, gas cutting to required size, rolling, tack, welding, assembling in suitable lengths to form pipes, welding on automatric welding machine and forming 'V'edge on both ends of pipes in all respect etc. complete as per IS-3589 and IS- 5504 as applicable as per specifications negative folerance in thickness is permissible) Casing for D.I. Pipe -dia of MS pipe: 300mm dia 6mm thick M.S. pipe for casing. |
| 14 | Earth work in back filling the trenches after laying different types and sizes of pipes with earth removed during excavation within initial lead and lift as per specification and direction of Engineer-in-charge. (For classification for soil item- A & B)(Taking 80% of Earth work in excavation or as per item no -1 |
| 15 | GST @ 18% |
| 16 | Labour Cess @ 1% Please Enable Macros to View BoQ information |