| 1 | Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 |
| 2 | Granular Sub-Base with Close Graded Material (Table:- 400-1) Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 |
| 3 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing |
| 4 | Carriage of Materials (Cement) |
| 5 | Stone Chips |
| 6 | Stone Metal |
| 7 | Stone Dust |
| 8 | Earth work in excavation of foundation of Trenches in hard soild vide classififcation of soil item B as per drawing and technical specification. |
| 9 | providing coarse clean sand filling in foundation trenches or in plinth including ramming and watering in layers as per drawing and technical specification. |
| 10 | providing designation 75B one brick flat soling joint filled with local sand including cost of watering taxes royalty all complete as per drawing and technical specification. |
| 11 | providing RCC M-200 nominal mix (1:1.5:3) in foundation with approved as per drawing and technical specification. |
| 12 | providing RCC M-200 nominal mix (1:1.5:3) in foundation with approved as per drawing and technical specification. |
| 13 | providing centering and shuttering and proping etc. and removal after use wall and deck slab etc. |
| 14 | providing RCC M-200 nominal mix (1:1.5:3) in deck slab with approved as per drawing and technical specification. |
| 15 | providing TMT bar reinforcement steel as per approved design and drawing, complete as per specification and direction of E/I.8mm dia |
| 16 | Carriage of Materials (Cement) |
| 17 | Stone Chips |
| 18 | Bricks |
| 19 | Steel |
| 20 | Add GST @ 18 % |
| 21 | Add L.Cess @ 1 % Please Enable Macros to View BoQ information |