|
| 1 | Dismentling of brick in cement mortar as Per PWD SI No. 692 |
| 2 | Earth work in excavation with ordinary soil 1.50 mt lift and 30mt lead etc all complete. S.I.NO.251 |
| 3 | P/L concrete in 1:6:12 cement ,f.sand&40mm brick ballast etc all complete S.I.NO. 273 |
| 4 | RCC work in 1:2:4 Raft Foundation cement ,c.sand&20mm stone Grite etc all complete S.I.NO 287 |
| 5 | M-150 class brick work 1:4 cement ,c. sand mortar etc all complete S.I.NO 305(b) |
| 6 | RCC Coloum 1:1.5:3 in cement, c-sand and 20 mm grade stone grit RCC colum etc all complete. SI No. 289 |
| 7 | RCC work in 1:2:4 cement c-sand 20mm grade stone grit etc all complete as per PWD SI No. 285A |
| 8 | M/S reinforment work in RCC items such as raft foundation colum plith beem etc. SI. No. 504 |
| 9 | Class-150 brick work 1:4 cement ,c. sand mortar etc all complete. S.I.NO 305(b)+310 |
| 10 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position andapplyinga priming coat of approved steel primer, including welding and bolted withspecial shaped washers etc. complete. DSR No.10.16.1 Hot finished welded type tube |
| 11 | 12mm thick cement plaster 1:4cement ,c. sand mortar etc all complete S.I.NO. 583 |
| 12 | Cement washing including supply of all meterial SI No. 680 |
| 13 | P/A white cement based putty of average thicknees 1mm of aproved brand over the plastered wall surface to prepered the surface even and smooth DSR No. 13.80 |
| 14 | Finishing walls with primium acrtlic smooth exterior paint two or more coats as per DSR No. 13.47.1 In pwd SOR Cht. 15 S. No. 23 |
| 15 | S/F of MS Angle for finishing work SI No. 503 |
| 16 | 2 coat painting including priming coat in new MS work SI No. 641+642 |
| 17 | Fencing with angle iron all complete but excuding coast angle iron DSR No. 16.18 |
| 18 | Installation of 12.50mtr. Height high mast pole including. 170 - 200 w flood light (8 No.) No. fo High must - 4 No. |
| 19 | Installation of 7 mtr. Hight pole with street light 25 No. |
| 20 | Installation of CCTV Cemra including all Items. |
| 21 | P/F inaguration Board. |
| 22 | Deduct cost of Brick bats. Qty as per Item No. 1 Please Enable Macros to View BoQ information |