| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : In cement mortar. (DSR-18/15.7.4) |
| 2 | Handover existing old bricks works |
| 3 | Excavation in foundation in ordinary soil (Loam clay or sand) including lift upto 1.50 M and lead upto 30.00M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer incharge upto a distance of 30m from the foundation trenches (where machine con not reach/move) (SOR-20/251 (A)/4.1.1) |
| 4 | Depth from 0.0 to 1.5M below G.L. |
| 5 | Depth from 1.5 to 3.0M below G.L. |
| 6 | Cement concrete with 4cm gaugeApproved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & Plants etc required for proper completion of the work |
| 7 | 8:4:1 (1 Cement 4: Coarse sand :8 graded stone aggregate 40mm nominal size) (SOR-20/281/5.08) |
| 8 | Plain/Reinforced Cement concrete in open foundation complete as per Drawing and Technical Specifications. (MORTH-20/9.06/E/Case-II) |
| 9 | RCC Grade M-25 using batching plant transit mixture and manual placing (MORTH-20/9.06/E/Case-II) |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. (DSR-18/5.22) |
| 11 | Thermo Mechanically treated bars of grade Fe-500D or more. (SAIL Steel) (DSR-18/5.22.6/AR) |
| 12 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 18/10.25) |
| 13 | In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. (DSR-18/10.25.2) |
| 14 | Cement concrete with 4cm gaugeApproved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & Plants etc required for proper completion of the work |
| 15 | 8:4:1 (1 Cement 4: Coarse sand :8 graded stone aggregate 40mm nominal size) (SOR-20/281/5.08) |
| 16 | Plain/Reinforced Cement concrete in open foundation complete as per Drawing and Technical Specifications. (MORTH-20/9.06/E/Case-II) |
| 17 | RCC Grade M-30 using batching plant transit mixture and manual placing (MORTH-20/9.06/E/Case-II) |
| 18 | Extra for providing and mixing hardening compound of approved quality as per manufacturer’s specification in cement concrete. (DSR-18/16.44) |
| 19 | Providing and laying in position bitumen hot sealing compound for expansion joints etc. Using grade ‘A’ sealing compound. (DSR-18/16.46.1) |
| 20 | Raising manhole cover and frame slab to required level including dismantling existing slab and making good the damage as required (Raising depth of manhole to be paid separately) :(DSR-18/19.26) |
| 21 | Circular manhole 140 cm dia with circular cover 600 mm dia of grade EHD - 35 (DSR-18/19.26.4) |
| 22 | Providing and fixing in position pre-cast R.C.C. manhole cover and frame of required shape and approved qualityEHD - 35: Circular shape 560 mm internal dia (DSR-18/19.19.4.1) |
| 23 | M-150 brick work in 1:6 cement & fine sand 1.25 FM mortar in foundation and plinth including supply of all material labour and T&P etc required for proper completion of the work. (SOR-20/303) same as item no 303 but in 1:4 one cement & four fine sand of 1.25 F.M. mortar. (SOR-20/305)Same as item no 305 but in 1:4 one cement & four coarse sand of 2.20 F.M. mortar. (SOR-20/305(A)) |
| 24 | 12 mm cement plaster of mix : 1:6 (1 cement: 6 coarse sand) (DSR-18/13.4.2) |
| 25 | Cement concrete with 4cm gauge approved stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (SOR-20/279)Same as above item no 279 but with 2cm gauge stone grit instead of 4cm gauge stone ballast. (SOR-20/279(a) |
| 26 | Providing and laying I Shaped Interlocking tiles Rubber moulded 80mm thick precast cement concrete having plan dimension 200x(160+120mm) with compressive strength not be less than 40Mpa (M-40) and weight 5kg, laid in required pattern over and including averege 50mm Thick Compacted bed fine sand and filling the joints with fine sand all complete as per direction of engineer-in-charge with conforming to ISI-15658-2006 SOR/A.R. Grey colour. |
| 27 | Fabrication & Manufacturing of Prestressed Hollow Core slab (Hollow area 25 to 30%) of different thickness & modular width 1200 mm in Controlled Factory Environment with approved methodology informing to IS 10297- 1982 conforming to IS : 10297- 1982 by using long line casting method having arrangement of proper steel bed. Concreting should be done by batch mixing plant capable of producing zero slump concrete, transported through automatic shuttels of standard make & layed on bed with the help of extruder/Slipformer, finishing, curing and also provision of steam curing. Cutting, making necessary cutout/holes of required sizes for services in slab element after achieving required strength, yard handling & stacking all complete as per approved shop drawings & design mix as per the direction of the Engineer-in-charge. (Cost of strands should be paid separately).Note : Excess/ less cement over the specified cement content used as per design mix is payable / recoverable separately. (DSR-18/26.73) |
| 28 | Concrete Grade-M-40 (cement content 400 kg ): 120 mm thick hollow core slab (DSR-18/26.73.1.2) |
| 29 | Providing & laying in position Prestressing steel strands (low relaxation) on hollow core bed by using mechanical pulling arrangement like Rabbit/ Bed master including all accessories for Stressing & destressing operations as per approved make conforming to IS1343 & grade FY-1860 etc, complete as per drawings and direction of Engineer -in-charge. (DSR-18/26.75) |
| 30 | Transportation of Precast Elements by flat bed Trailor (Double / Triple axle 40ft Length with proper accessories like A frame etc) from factory, including the cost of loading , unloading & stacking at site with the help of required capacity cranes. (DSR-18/26.76) |
| 31 | Lead within 15km (DSR-18/26.76.1) |
| 32 | Erection & Installation of Precast/Prestressed Concrete elements in correct & final position with proper line level and plumb at site making all arrangements (i.e cranes, push-pull jacks & all another T & P for lifting Placing & Alignment of elements, within erection tolerance as per IS 15916 as per approved shop drawings and all complete as per the direction of Engineer-in-Charge but excluding the cost of sim pads, non shrink grout and steel works i.e hangers. All work up to fifth floor. (DSR-18/26.77) |
| 33 | Prestressed hollow core Slab up to 200 mm thickness (DSR-18/26.77.1) |
| 34 | Labour cess and GST will be paid extra as per Govt. orders. Please Enable Macros to View BoQ information |