|
| 1 | Complete maintenance of trees on road side plantation (RSP) belt ( Out side garden features ), jobs like making of basin at regular interval i/c watering, weeding, pruning & application of fertilizer etc, (excluding the cost of material which shall be supplied by the department and other T & P material/ articles shall be provided by the contractor )and as per direction of officer in charge. |
| 2 | trees ( beyond 8 years slow & beyond 6 years Fast growing group) 3721+300=4021 |
| 3 | trees ( up to (5-8 & 4-6year slow & Fast growing group) 100MTR 45mtr central verge sec 20 |
| 4 | Complete maintenance of trees in green belt (Out side garden features) jobs like making of basin at regular interval i/c watering , weeding pruning & application of fertilizer etc, (excluding the cost of material which shall be supplied by the department and other T& P material / articles shall be provided by the contractor ) and as per diection of officer in charge. Complete maintenance in green belt (out side garden ) |
| 5 | trees ( beyond 8 years slow & beyond 6 years Fast growing group) 1000 nos |
| 6 | Complete maintenance of shrubs on RSP (Out side garden features) jobs like making of basin at regular interval i/c watering , weeding pruning & application of fertilizer etc, (excluding the cost of material which shall be supplied by the department and other T& P material / articles shall be provided by the contractor ) and as per diection of officer in charge. ( up to (5-8 & 4-63 year slow & Fast growing group) |
| 7 | Shurbs on RSP and central verge 100MTR 45mtr sec 20=3885 nos |
| 8 | Complete maintenance of shrubs on greenb belt jobs like making of basin at regular interval i/c watering , weeding pruning & application of fertilizer etc, (excluding the cost of material which shall be supplied by the department and other T& P material / articles shall be provided by the contractor ) and as per diection of officer in charge. ( up to (5-8 & 4-63 year slow & Fast growing group) |
| 9 | Shurbs ABU=9284 Total=9284 |
| 10 | Complete maintenance of the entire garden features having as per yard stick in the garden area i.e. lawn trees, shrubs, hergs, edge, flower beds, foliages, creepers etc. including hoeing, weeding, purning, replacement of plants, gap filling, watering, mowing of lawn, grass cutting by lawn mover and brush cutter, removal of garden waste, applying insecticide, pesticide & fertilizers ( whenever required) top dressing of lawn with good earth and manure and maintenance of other garden related works as directed by office in charge ( cost of Good Earth, manure , fertilizer, insecticide pesticide will be provided by the department & lawn mover and brush cutter with fuel and other T & P material / articles shall be provided by the contractor.) and as per direction of officer in charge. |
| 11 | Play grounds/Public parks ( Mali for 2.00Acre.) |
| 12 | Providing and watering for irrigation water through water tanker of Horticulture features i.e. lawn, tree, shrubs, hedge/edge, ground cover etc. at the site of work . Water tanker having 5000 lit. capacity with one labour for watering i/c cost of water, filling of tanker, watering at site with all leads and lifts as per direction of officer in charge. (Rate analysed as per DSR-18 on actual observation ) |
| 13 | trees ( beyond 8 years slow & beyond 6 years Fast growing group) 3721+300+2066=6087 |
| 14 | trees ( up to (5-8 & 4-6year slow & Fast growing group) 100MTR 45mtr central verge sec 20 |
| 15 | Shurbs on RSP and central verge 100MTR 45mtr sec 20=3885 nos |
| 16 | Providing and watering for irrigation water through boring and RH pipe in gren belt of horticulture features ie.e lawn trees shrubs hedge ground cover etc at the site of work including supply water and RH pipe for watering each plant and complete arrrangement of watering with DG set boring pump and labour for watering at site with all leada and lifts as per direction in charge. |
| 17 | trees ( beyond 8 years slow & beyond 6 years Fast growing group) 7400 nos |
| 18 | Shurbs ABU=9287, Total=9284 |
| 19 | Providing profuse watering arrangement for lawn/Park at site to make avialable for irrigation i.e. Diesel engien & oil etc, RH Pipe/ Canvas pip & other T&P etc. in the proces of watering submerisible pump & accessories as per direction of officer in charge of work. |
| 20 | Supply and stacking of well decayed cattle manure at site including roylty and carriagge up to 5km lead complete. ( Cattle manure measured in stacks will reduced by 8% for payment) |
| 21 | Supplying of chlorpyriphos 20% E.C/ Lindane 20% E.C for anti termite treatment of plants @ 2ml./plant and in the interval 1 month up to one year i.e, 12 times in a year hence it comes 24ml/plant or 0.024ltr/plant. |
| 22 | Cleaing of jungle including uprooting of rank vegetations grass push wood trees and sampings of girth up to 30cm measured at a height of 1M above ground level and removal of rubbish up to a distance of 50m out side the periphery of area cleared. Please Enable Macros to View BoQ information |