| Sl. No. | Item Description |
| 1 | Item Wise BoQ BoQ_Ver3.0 Item Wise Normal INR and Other Currency INR,USD,JPY,EUR Select, Excess (+), Less (-) Tender Inviting Authority: Sr. General Manager/Rolling Stock/VI Name of Work:Design, Manufacture, Supply, Testing, and Commissioning of 90 Nos. of Standard Gauge Cars for Inderlok-Indraprastha Corridor (Line-8 Extension) of Delhi Metro Rail Corporation Ltd. including Training of Employer’s Manpower and Comprehensive Maintenance of these 90 Nos. Standard Gauge Cars as well as Depot M&Ps, Special tools, Jigs and Fixtures, Testing and Diagnostic Equipment, Test benches, Material Handling Equipment etc. for a period of Thirty-Five Years. Contract No: RS21 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevant columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. COST CENTRE DESCRIPTION Item Code / Make Quantity Cost Centre Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency Total Apportioned/Actual Amounts of Cost Centre Items Excise Duty inRs. P GST inRs. P Freight Charges ( Unloading & Stacking) inRs. P Any Other Taxes/Duties/Levies inRs. P Other Taxes 2 inRs. P IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax inRs. P Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category inRs. P TOTAL AMOUNT, It will be converted based on coloumn L value TOTAL TAXES It will be converted only If you choose Full Conversion, Until than it is treated as INR inRs. P TOTAL AMOUNT In Words |
| 2 | PRELIMINARIES & GENERAL REQUIREMENTS AND DESIGN OF ROLLING STOCK (INR) |
| 3 | PRELIMINARIES & GENERAL REQUIREMENTS AND DESIGN OF ROLLING STOCK (USD) |
| 4 | PRELIMINARIES & GENERAL REQUIREMENTS AND DESIGN OF ROLLING STOCK (JPY) |
| 5 | PRELIMINARIES & GENERAL REQUIREMENTS AND DESIGN OF ROLLING STOCK (EUR) |
| 6 | OFFSHORE MANUFACTURE, DISPATCH, COMPLETION OF SHIPPING TO PORT IN INDIA, INLAND TANSPORTATION IN INDIA, DELIVERY & RECEIPT OF CARS IN DEPOT (INR) |
| 7 | OFFSHORE MANUFACTURE, DISPATCH, COMPLETION OF SHIPPING TO PORT IN INDIA, INLAND TANSPORTATION IN INDIA, DELIVERY & RECEIPT OF CARS IN DEPOT (USD) |
| 8 | OFFSHORE MANUFACTURE, DISPATCH, COMPLETION OF SHIPPING TO PORT IN INDIA, INLAND TANSPORTATION IN INDIA, DELIVERY & RECEIPT OF CARS IN DEPOT (JPY) |
| 9 | OFFSHORE MANUFACTURE, DISPATCH, COMPLETION OF SHIPPING TO PORT IN INDIA, INLAND TANSPORTATION IN INDIA, DELIVERY & RECEIPT OF CARS IN DEPOT (EUR) |
| 10 | INDIGENOUS MANUFACTURE, DISPATCH, INLAND TRANSPORTATION IN INDIA, DELIVERY AND RECEIPT OF CARS IN DEPOT (INR) |
| 11 | INDIGENOUS MANUFACTURE, DISPATCH, INLAND TRANSPORTATION IN INDIA, DELIVERY AND RECEIPT OF CARS IN DEPOT (USD) |
| 12 | INDIGENOUS MANUFACTURE, DISPATCH, INLAND TRANSPORTATION IN INDIA, DELIVERY AND RECEIPT OF CARS IN DEPOT (JPY) |
| 13 | INDIGENOUS MANUFACTURE, DISPATCH, INLAND TRANSPORTATION IN INDIA, DELIVERY AND RECEIPT OF CARS IN DEPOT (EUR) |
| 14 | TESTING AND COMMISSIONING IN THE DEPOT, INTEGRATED TESTING AND COMMISSIONING ON THE SECTION, SERVICE TRIALS AND FINAL COMMISSIONING OF TRAINS (INR) |
| 15 | TESTING AND COMMISSIONING IN THE DEPOT, INTEGRATED TESTING AND COMMISSIONING ON THE SECTION, SERVICE TRIALS AND FINAL COMMISSIONING OF TRAINS (USD) |
| 16 | TESTING AND COMMISSIONING IN THE DEPOT, INTEGRATED TESTING AND COMMISSIONING ON THE SECTION, SERVICE TRIALS AND FINAL COMMISSIONING OF TRAINS (JPY) |
| 17 | TESTING AND COMMISSIONING IN THE DEPOT, INTEGRATED TESTING AND COMMISSIONING ON THE SECTION, SERVICE TRIALS AND FINAL COMMISSIONING OF TRAINS (EUR) |
| 18 | COMPREHENSIVE MAINTENANCE OF 90 NUMBERS STANDARD GAUGE CARS AS WELL AS DEPOT M&PS, SPECIAL TOOLS, JIGS AND FIXTURES, TESTING AND DIAGNOSTIC EQUIPMENT, TEST BENCHES, MATERIAL HANDLING EQUIPMENT ETC. IN THE DEPOT (CLAUSE ITB 1.1 OF BDS) FOR DLMP AS DEFINED IN CLAUSE PC 8.2 (INR) |
| 19 | COMPREHENSIVE MAINTENANCE OF 90 NUMBERS STANDARD GAUGE CARS AS WELL AS DEPOT M&PS, SPECIAL TOOLS, JIGS AND FIXTURES, TESTING AND DIAGNOSTIC EQUIPMENT, TEST BENCHES, MATERIAL HANDLING EQUIPMENT ETC. IN THE DEPOT (CLAUSE ITB 1.1 OF BDS) FOR DLMP AS DEFINED IN CLAUSE PC 8.2 (USD) |
| 20 | COMPREHENSIVE MAINTENANCE OF 90 NUMBERS STANDARD GAUGE CARS AS WELL AS DEPOT M&PS, SPECIAL TOOLS, JIGS AND FIXTURES, TESTING AND DIAGNOSTIC EQUIPMENT, TEST BENCHES, MATERIAL HANDLING EQUIPMENT ETC. IN THE DEPOT (CLAUSE ITB 1.1 OF BDS) FOR DLMP AS DEFINED IN CLAUSE PC 8.2 (JPY) |
| 21 | COMPREHENSIVE MAINTENANCE OF 90 NUMBERS STANDARD GAUGE CARS AS WELL AS DEPOT M&PS, SPECIAL TOOLS, JIGS AND FIXTURES, TESTING AND DIAGNOSTIC EQUIPMENT, TEST BENCHES, MATERIAL HANDLING EQUIPMENT ETC. IN THE DEPOT (CLAUSE ITB 1.1 OF BDS) FOR DLMP AS DEFINED IN CLAUSE PC 8.2 (EUR) |
| 22 | UNIT EXCHANGE SPARES, MANDATORY SPARES, AND SPECIAL TOOLS, JIGS, FIXTURES,GAUGES,TESTING AND DIAGNOSTIC EQUIPMENT (INR) |
| 23 | UNIT EXCHANGE SPARES, MANDATORY SPARES, AND SPECIAL TOOLS, JIGS, FIXTURES,GAUGES,TESTING AND DIAGNOSTIC EQUIPMENT (USD) |
| 24 | UNIT EXCHANGE SPARES, MANDATORY SPARES, AND SPECIAL TOOLS, JIGS, FIXTURES,GAUGES,TESTING AND DIAGNOSTIC EQUIPMENT (JPY) |
| 25 | UNIT EXCHANGE SPARES, MANDATORY SPARES, AND SPECIAL TOOLS, JIGS, FIXTURES,GAUGES,TESTING AND DIAGNOSTIC EQUIPMENT (EUR) |
| 26 | TRAINING AND MANUALS (INR) |
| 27 | TRAINING AND MANUALS (USD) |
| 28 | TRAINING AND MANUALS (JPY) |
| 29 | TRAINING AND MANUALS (EUR) Total in Figures 0.0 0.0 Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select % 0.0 0.0 Zero Only Quoted Rate in Words Design, Manufacture, Supply, Testing, and Commissioning of 90 Nos. of Standard Gauge Cars for Inderlok-Indraprastha Corridor (Line-8 Extension) of Delhi Metro Rail Corporation Ltd. including Training of Employer’s Manpower and Comprehensive Maintenance of these 90 Nos. Standard Gauge Cars as well as Depot M&Ps, Special tools, Jigs and Fixtures, Testing and Diagnostic Equipment, Test benches, Material Handling Equipment etc. for a period of Thirty-Five Years. SECTION IV Annexure PD-I PRICING DOCUMENT TENDER TOTAL LUMP SUM PRICE To be Completed and Submitted as part of Form FB-2 to the Forms of Bid (THIS DOCUMENT IS TO BE PREPARED AND COMPLETED BY THE TENDERER) I.The 'Tender Total Lump Sum Price' of this Contract (15 numbers trainsets of '6' cars i.e. 90 cars) is Foreign currency (I) IN WORDS USD Foreign currency (II) IN WORDS JPY Foreign currency (III) IN WORDS EUR Indian currency (IV) IN WORDS INR II. Apportionment of Tender Total Lump Sum Price among Cost Centres Cost Centre COST CENTRE DESCRIPTION Total Apportioned/Actual Amounts of Cost Centre Items Foreign currency (I) Foreign currency (II) Foreign currency (III) Indian Rupees(IV) USD JPY EUR INR A. PRELIMINARIES & GENERAL REQUIREMENTS AND DESIGN OF ROLLING STOCK 0.0 0.0 0.0 0.0 B. OFFSHORE MANUFACTURE, DISPATCH, COMPLETION OF SHIPPING TO PORT IN INDIA, INLAND TANSPORTATION IN INDIA, DELIVERY & RECEIPT OF CARS IN DEPOT 0.0 0.0 0.0 0.0 C. INDIGENOUS MANUFACTURE, DISPATCH, INLAND TRANSPORTATION IN INDIA, DELIVERY AND RECEIPT OF CARS IN DEPOT 0.0 0.0 0.0 0.0 D. TESTING AND COMMISSIONING IN THE DEPOT, INTEGRATED TESTING AND COMMISSIONING ON THE SECTION, SERVICE TRIALS AND FINAL COMMISSIONING OF TRAINS 0.0 0.0 0.0 0.0 E. COMPREHENSIVE MAINTENANCE OF 90 NUMBERS STANDARD GAUGE CARS AS WELL AS DEPOT M&PS, SPECIAL TOOLS, JIGS AND FIXTURES, TESTING AND DIAGNOSTIC EQUIPMENT, TEST BENCHES, MATERIAL HANDLING EQUIPMENT ETC. IN THE DEPOT (CLAUSE ITB 1.1 OF BDS) FOR DLMP AS DEFINED IN CLAUSE PC 8.2 0.0 0.0 0.0 0.0 F. DELETED 0.0 0.0 0.0 0.0 G. UNIT EXCHANGE SPARES, MANDATORY SPARES,AND SPECIAL TOOLS,JIGS,FIXTURES,GAUGES,TESTING AND DIAGNOSTIC EQUIPMENT 0.0 0.0 0.0 0.0 H. TRAINING AND MANUALS 0.0 0.0 0.0 0.0 TENDER TOTAL LUMP SUM PRICE 0.0 0.0 0.0 0.0 Notes: 1. We offer unconditional discount of ______% (in figure) _______________________percent (in words) on the total quoted Lumpsum price which shall be applicable to all the Milestones in respective currencies on pro rata basis. 2. The Tender Total Lumpsum Price after unconditional discount is as follows:The 'Tender Total Lump Sum Price' of this Contract (15 numbers trainsets of 6-cars i.e. 90 cars) is Foreign currency (I) IN WORDS USD Foreign currency (II) IN WORDS JPY Foreign currency (III) IN WORDS EUR Indian currency (IV) IN WORDS INR 3. The above mentioned unconditional discounts shall be /shall not be (Strike off what is not applicable) applicable on the price of withdrawal of the deviations noted with Annexure PD-3. 4. It is certified that 'Pricing Document' annexed in Technical Bid is a \\"TRUE COPY\\" (with prices blanked off) of the said 'Pricing Document' in the Price Bid. Annexure PD-1 INDEX OF COST CENTRES COST CENTRE DESCRIPTION A PRELIMINARIES & GENERAL REQUIREMENTS AND DESIGN OF ROLLING STOCK B OFFSHORE MANUFACTURE, DISPATCH, COMPLETION OF SHIPPING TO PORT IN INDIA, INLAND TANSPORTATION IN INDIA, DELIVERY & RECEIPT OF CARS IN DEPOT C INDIGENOUS MANUFACTURE, DISPATCH, INLAND TRANSPORTATION IN INDIA, DELIVERY AND RECEIPT OF CARS IN DEPOT D TESTING AND COMMISSIONING IN THE DEPOT, INTEGRATED TESTING AND COMMISSIONING ON THE SECTION, SERVICE TRIALS AND FINAL COMMISSIONING OF TRAINS E COMPREHENSIVE MAINTENANCE OF 90 NUMBERS STANDARD GAUGE CARS AS WELL AS DEPOT M&PS, SPECIAL TOOLS, JIGS AND FIXTURES, TESTING AND DIAGNOSTIC EQUIPMENT, TEST BENCHES, MATERIAL HANDLING EQUIPMENT ETC. IN THE DEPOT (CLAUSE ITB 1.1 OF BDS) FOR DLMP AS DEFINED IN CLAUSE PC 8.2 F DELETED G UNIT EXCHANGE SPARES, MANDATORY SPARES,AND SPECIAL TOOLS,JIGS,FIXTURES,GAUGES,TESTING AND DIAGNOSTIC EQUIPMENT H TRAINING AND MANUALS Design, Manufacture, Supply, Testing, and Commissioning of 90 Nos. of Standard Gauge Cars for Inderlok-Indraprastha Corridor (Line-8 Extension) of Delhi Metro Rail Corporation Ltd. including Training of Employer’s Manpower and Comprehensive Maintenance of these 90 Nos. Standard Gauge Cars as well as Depot M&Ps, Special tools, Jigs and Fixtures, Testing and Diagnostic Equipment, Test benches, Material Handling Equipment etc. for a period of Thirty-Five Years. (To be Submitted as part of Appendix FB-2 to the Form of Bid) SECTION IV PRICING DOCUMENT Annexure PD-1 SCHEDULE OF AMOUNTS APPORTIONED TO COST CENTRES COST CENTRE DESCRIPTIONS (To be Completed and Submitted as part of Form FB-2 to the Forms of Bid) COST CENTRE No. A - Preliminaries & General Requirements and Design of Rolling Stock. This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This includes but is not limited to: · Submission of Project Management Plan; · Submission of Interface Management Plan and Detailed Interface Documents; · Submission of Works Programme; · Submission of Design Submission Programme; · Submission of Quality Assurance Plan; · Submission of Safety Assurance Plan and Site Safety Plan; · Submission of Environmental Plan; · Submission of Software Quality Assurance Plan; · Submission of Inspection, Testing & Commissioning (including Integrated Testing & Commissioning) Plan; · Liaison with other Designated Contractors during the design process; · Submission of the Preliminary Design, the pre-Final Design, the Final Design; · Submission of the Final Design Document; · Submission of “As-Built drawings”; · Site Management Plan · Obosolescence Management Plan · Submission of “Comprehensive Annual Maintenance (CAMC) Plan; · Reliability, Availability and Maintainability Plan · Any other item considered necessary to comply with the Scope of Work. Notes: 1. The maximum amount that can be apportioned in this Cost Centre shall not exceed 10% of the total amount apportioned in Cost Centres A, B, C and D.2. It is certified that 'Annexure PD-1' annexed in Technical Bid is a \\"TRUE COPY\\" (with prices blanked off) of the said 'Annexure PD-1' in the Price Bid. COST CENTRE No. A - PRELIMINARIES & GENERAL REQUIREMENTS AND DESIGN OF ROLLING STOCK MILESTONE NUMBER WORK DESCRIPTION APPORTIONED AMOUNT MILESTONE COMPLETION DATE( IN WEEKS FROM COMMENCMENT DATE) Foreign currency (I) Foreign currency (II) Foreign currency (III) INDIAN RUPEES (IV) USD JPY EUR INR MILESTONE ACTIVITY COLUMN A COLUMN B COLUMN C COLUMN D Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ---“ from the Project Manager for: A1 Project Management Plan. 41153.0 41213.0 41183.0 A2 Interface Management Plan and Detailed Interface Documents. 41153.0 41213.0 41183.0 A3 Works Programme. 41153.0 41213.0 41183.0 A4 Design Submission Programme. 62.0 61.0 A5 Quality Assurance Plan. 41153.0 41213.0 41183.0 A6 System Safety Assurance Plan and Site Safety Plan. 41153.0 41213.0 41183.0 A7 Environmental Plan. 41153.0 41213.0 41183.0 A8 Software Quality Assurance Plan. 41153.0 41213.0 41183.0 A9 Testing and Commissioning in the Depot, Integrated Testing and Commissioning on the Section, Service Trials and final commissioning of trains Plan. 41153.0 41213.0 41183.0 A10 Preliminary Design Completion. 41153.0 41213.0 41183.0 A11 Pre-Final Design Completion. 41153.0 41213.0 41183.0 A12 Final Design Completion. 41153.0 41213.0 41183.0 A13 Final Design Document Delivery. 41153.0 41213.0 41183.0 A14 Site Management Plan. A15 Obosolescence Management Plan. A16 Comprehensive Annual Maintenance (CAMC) Plan. A17 Reliability, Availability and Maintainability Plan. A18 “As-Built Drawings” delivery. 41153.0 41213.0 41183.0 A19 Any other item considered necessary by the contractor to comply with the Scope of Work. COST CENTRE TOTAL 0.0 0.0 0.0 0.0 Note: 1. The maximum amount that can be apportioned in this Cost Centre shall not exceed 10% of the total amount apportioned in Cost Centres A, B, C and D.2. It is certified that 'Annexure PD-1' annexed in Technical Bid is a \\"TRUE COPY\\" (with prices blanked off) of the said 'Annexure PD-1' in the Price Bid.3. Bidders shall fill the 'Milestone Completion Date' (wherever not specified) against each Milestone Activity above, such that it falls within the relevant Key Dates (refer Form FB-1 to Forms of Bid) and within the submission schedule (refer Table 2-A: Submission of Plans under ERGS clause 2.1.3). In case of non compliance to this condition, the Employer shall consider the relevant activity under the non-compliant 'Milestone Completion Date' to be completed on the respective Key Date/submission schedule as mentioned in the tender conditions for all purposes including tender evaluation. COST CENTRE No. 'B' - OFFSHORE MANUFACTURE, DISPATCH, COMPLETION OF SHIPPING TO PORT IN INDIA, INLAND TANSPORTATION IN INDIA, DELIVERY & RECEIPT OF CARS IN DEPOT This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre.This includes but is not limited to: . selection of suppliers for major system and sub-systems for trains; . completion of all routine and type testing of equipment; . completion of Main Tooling for manufacture; . completion of all Factory Acceptance Tests; . completion of test running in factory; . completion of manufacture, testing and inspection, dispatch from offshore factory and shipping port of first prototype train; . provision of Marine and Transit Insurance from off-shore Factory to Depot Site in Delhi/NCR; . completion of manufacture, testing and inspection, dispatch from offshore factory and shipping port of balance cars; . completion of shipping to port in India, Inland transportation in India, delivery and receipt of cars in designated depots in good condition; . transportation costs off-shore manufactured trains from the offshore port to port in India, port in India to Depot in Delhi/NCR; . all handling costs and incidental charges at port in India, Depot and any intermediate location in India; . all costs associated with special traffic arrangements necessary for transportation; . any other item considered necessary to comply with the scope of work. COST CENTRE No. B – OFFSHORE MANUFACTURE, DISPATCH, COMPLETION OF SHIPPING TO PORT IN INDIA, INLAND TRANSPORTATION IN INDIA, DELIVERY AND RECEIPT OF CARS IN DEPOT MILESTONE NUMBER WORK DESCRIPTION APPORTIONED AMOUNT WEEKS FOR COMPLETION OF MILESTONE FROM COMMENCEMENT DATE FOREIGN CURRENCY(I) FOREIGN CURRENCY(II) FOREIGN CURRENCY(III) INDIAN RUPEES (IV) USD JPY EUR INR MILESTONE ACTIVITY COLUMN A COLUMN B COLUMN C COLUMN D Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ---“ from the Project Manager after:• Issue of Inspection Certificate on satisfactory completion of all Factory Tests;• Marine Insurance;• Documents for shipment to Indian Port;• Dispatch of cars from offshore factory and shipping port;• Transit insurance from Port in India to Depot Site in Delhi/NCR and• Completion of shipping to port in India, Inlandtransportation in India,Delivery and Receipt of trains in the Depot in Delhi/NCR in good condition; For: B1 Obtain as above for First Prototype Offshore Manufatured 6-cars train B2 Obtain as above for second Offshore Manufatured 6-cars train B3 Obtain as above for third Offshore Manufatured 6-cars train COST CENTRE TOTAL 0.0 0.0 0.0 0.0 NOTES: 1. The maximum number of trainsets that can be manufactured offshore are '03' trainsets of 6 cars each. Contractor at his option may reduce the number of trains manufactured off-shore. 2. The apportioned amount (both foreign and local currency) shall be same for each milestone.3. It is certified that 'Annexure PD-1’ annexed in Technical Bid is a “TRUE COPY”(with prices blanked off) of the said ‘Annexure PD-1’ in the Price Bid.4. Bidders shall fill the 'Milestone Completion Date' (wherever not specified) against each Milestone Activity above, such that it falls within the relevant Key Dates (refer Form FB-1 to Forms of Bid). In case of non compliance to this condition, the Employer shall consider the relevant activity under the non-compliant 'Milestone Completion Date' to be completed on the respective Key Date as mentioned in the tender conditions for all purposes including tender evaluation. COST CENTRE No. 'C' – INDIGENOUS MANUFACTURE, DISPATCH, INLAND TRANSPORTATION IN INDIA, DELIVERY AND RECEIPT OF CARS IN DEPOT This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This includes but is not limited to: · selection of suppliers for major system and sub-systems for trains; · completion of all routine and type testing of components and equipment; · completion of Main Tooling for manufacture; · completion of all factory acceptance tests; · completion of test running in factory; · completion of manufacture, testing and inspection, dispatch, transit insurance ex. Factory to Depot site in Delhi/NCR; · Inland transportation in India, delivery and receipt of cars in Depot in good condition; · transportation costs of indigenously manufactured trains from Factory in India to Depot Site in Delhi/NCR · all handling costs and incidental charges at factory in India, Depot and any intermediate location in India; · all costs associated with special traffic arrangements necessary for transportation; · any other item considered necessary to comply with the scope of work. COST CENTRE No. C – INDIGENOUS MANUFACTURE, DISPATCH INLAND TRANSPORTATION IN INDIA, DELIVERY AND RECEIPT OF CARS IN DEPOT MILESTONE NUMBER WORK DESCRIPTION APPORTIONED AMOUNT WEEKS FOR COMPLETION OF MILESTONE FROM COMMENCEMENT DATE FOREIGN CURRENCY (I) FOREIGN CURRENCY (II) FOREIGN CURRENCY (III) INDIAN RUPEES (IV) USD JPY EUR INR MILESTONE ACTIVITY COLUMN A COLUMN B COLUMN C COLUMN D Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ---“ from the Project Manager after:• Issue of Inspection Certificate on satisfactory completion of all Factory Tests;• Transit Insurance;• Dispatch Documents;• Dispatch of cars from onshore factory;• Inland transportation in India, delivery and receipt of cars in the Depot in Delhi/NCR in good condition; For: C1 Obtain as above for First Indigenously Manufactured Prototype 6-cars Train. C2 Obtain as above for Second Indigenously Manufactured 6-cars Train. C3 Obtain as above for Third Indigenously Manufactured 6-cars Train. C4 Obtain as above for Fourth Indigenously Manufactured 6-cars Train. C5 Obtain as above for Fifth Indigenously Manufactured 6-cars Train. C6 Obtain as above for Sixth Indigenously Manufactured 6-cars Train. C7 Obtain as above for Seventh Indigenously Manufactured 6-cars Train. C8 Obtain as above for Eighth Indigenously Manufactured 6-cars Train. C9 Obtain as above for Ninth Indigenously Manufactured 6-cars Train. C10 Obtain as above for Tenth Indigenously Manufactured 6-cars Train. C11 Obtain as above for Eleventh Indigenously Manufactured 6-cars Train. C12 Obtain as above for Twelfth Indigenously Manufactured 6-cars Train. C13 Obtain as above for Thirteenth Indigenously Manufactured 6-cars Train. C14 Obtain as above for Fourteenth Indigenously Manufactured 6-cars Train. C15 Obtain as above for Fifteenth Indigenously Manufactured 6-cars Train. COST CENTRE TOTAL 0.0 0.0 0.0 0.0 NOTES: 1. Contractor at his option may increase the number of trains manufactured indigenously. However, the number of trains manufactured indigenously shall not be less than Twelve '6 Car' trains.2. The apportioned amount (both foreign and local currency) shall be same for each milestone.3. It is certified that 'Annexure PD-1’ annexed in Technical Bid is a “TRUE COPY”(with prices blanked off) of the said ‘Annexure PD-1’ in the Price Bid.4. Bidders shall fill the 'Milestone Completion Date' (wherever not specified) against each Milestone Activity above, such that it falls within the relevant Key Dates (refer Form FB-1 to Forms of Bid). In case of non compliance to this condition, the Employer shall consider the relevant activity under the non-compliant 'Milestone Completion Date' to be completed on the respective Key Date as mentioned in the tender conditions for all purposes including tender evaluation. COST CENTRE D - TESTING AND COMMISSIONING IN THE DEPOT, INTEGRATED TESTING AND COMMISSIONING ON THE SECTION, SERVICE TRIALS AND FINAL COMMISSIONING OF TRAINS This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This includes but is not limited to: . Formation of trains, completion of functional tests and running of trains in the Depot. . Integrated testing and commissioning of trains in the nominated Depot and on the sections in conjunction with other Designated Contractors. . Instrumentation Tests and Oscillation trials on prototype trains only as necessary for obtaining sanction of statutory authorities. . Service trial and Final commissioning of trains. . All instrumentation, computers, and any other item including supervisory and operating staff essential for testing, commissioning and service trials of trains etc. will be provided by the Contractor. . Any other item considered necessary to comply with the scope of Works. Note: 1. The Minimum amount that shall be apportioned in the cost centres 'D' shall not be less than 10% of the total amount apportioned in Cost Centres ‘A’, ‘B', ‘C’ and 'D’. 2. 50% of the apportioned amount against each milestone in this cost centre 'D' shall be payable on successful commissioning of train in 'GoA2' and balance 50% amount shall become payable on successful commissioning of train in 'GoA3 & GoA4'. COST CENTRE 'D' - TESTING AND COMMISSIONING IN THE DEPOT, INTEGRATED TESTING & COMMISSIONING ON THE SECTION, SERVICE TRIALS AND FINAL COMMISSIONING OF TRAINS MILESTONE NUMBER WORK DESCRIPTION APPORTIONED AMOUNT WEEKS FOR COMPLETION OF MILESTONE IN WEEKS FROM COMMENCEMENT DATE FOREIGN CURRENCY(I) FOREIGN CURRENCY(II) FOREIGN CURRENCY(III) INDIAN RUPEES (IV) USD JPY EUR INR MILESTONE ACTIVITY COLUMN A COLUMN B COLUMN C COLUMN D Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ---“ from the Project Manager after:• Formation of train, obtaining certificate of satisfactory completion of functional tests and running of train in the Depot.• Completion of Integrated Testing and Commissioning in the Depot;• Completion of integrated testing and commissioning on the section in conjunction with Designated contractors;• ** Instrumentation Tests, Oscillation trials;• Service Trials and Final Commissioning;• ** Sanction of Statutory Authorities of Test results.For: D1 Obtain as above for First Prototype 6-cars Train. D2 Obtain as above for Second 6-cars Train. D3 Obtain as above for Third 6-cars Train. D4 Obtain as above for Fourth 6-cars Train. D5 Obtain as above for Fifth 6-cars Train. D6 Obtain as above for Sixth 6-cars Train. D7 Obtain as above for seventh 6-cars Train. D8 Obtain as above for Eighth 6-cars Train. D9 Obtain as above for Nineth 6-cars Train. D10 Obtain as above for Tenth 6-cars Train. D11 Obtain as above for Eleventh 6-cars Train. D12 Obtain as above for Twelfth 6-cars Train. D13 Obtain as above for Thirteenth 6-cars Train. D14 Obtain as above for Fourteenth 6-cars Train. D15 Obtain as above for Fifteenth 6-cars Train. COST CENTRE TOTAL 0.0 0.0 0.0 0.0 NOTES: 1. The apportioned amounts (both foreign currency and local currency) shall be same for each Milestone (D1 to D15).2. The minimum amount that shall be apportioned in the cost centres 'D', shall not be less than 10% of the total amount apportioned in Cost Centres 'A', 'B', 'C' and 'D'.3. It is certified that 'Annexure PD-1' annexed in Technical Bid is a \\"TRUE COPY\\" (with prices blanked off) of the said 'Annexure PD-1' in the Price Bid.4. Bidders shall fill the 'Milestone Completion Date' (wherever not specified) against each Milestone Activity above, such that it falls within the relevant Key Dates (refer Form FB-1 to Forms of Bid). In case of non compliance to this condition, the Employer shall consider the relevant activity under the non-compliant 'Milestone Completion Date' to be completed on the respective Key Date as mentioned in the tender conditions for all purposes including tender evaluation.5. 50% of the apportioned amount against each milestone in this cost centre 'D' shall be payable on successful commissioning of train in 'GoA2' and balance 50% amount shall become payable on successful commissioning of train in 'GoA3 & GoA4'. COST CENTRE: ECOMPREHENSIVE MAINTENANCE OF 90 NUMBERS STANDARD GAUGE CARS AS WELL AS DEPOT M&Ps, SPECIAL TOOLS, JIGS AND FIXTURES, TESTING AND DIAGNOSTIC EQUIPMENT, TEST BENCHES, MATERIAL HANDLING EQUIPMENT ETC. IN THE DEPOT (CLAUSE ITB 1.1 OF BDS) FOR DLMP AS DEFINED IN CLAUSE PC 8.2 Scope of Cost Centre: This cost centre comprises of all those obligations and activities connected with the Comprehensive maintenance of Rolling Stock, Depot and M&Ps including provision of all requisite maintenance & overhauling spares and consumables, supervision of maintenance, provision of maintenance manpower, supply of Training, Maintenance Manuals, Maintenance of Depot Machinery and Plants (M&Ps) including provision and maintenance of special tools, jigs, fixtures, gauges, testing and diagnostic equipment, Test Benches, Material Handling Equipment etc. in the Depot (Clause ITB 1.1 of BDS) during DLMP as specified in PC 8.2. Tenderer to refer to ERGS Chapter 8 and ERGS Chapter 15 to 19 for the complete details of the Scope of Work. NOTES: 1. The tenderer shall quote the Lump Sum Comprehensive Annual Maintenance Cost for the described scope of works as per ERGS Chapter 8 and ERGS Chapters 15 to 19 ,Clause ITB 1.1 of BDS during the DLMP (as defined in PC 8.2) as per the attached milestone schedule for cost centre E for the milestones E-1 to E-35 . 2. Deleted. 3. The tenderer shall note that the quoted cost under this cost centre shall cover the overall maintenance requirement as per the described scope of work as per ERGS Chapter 8 and ERGS Chapters 15 to 19 (Clause ITB 1.1 of BDS). 4. Deleted. 5. It is certified that 'Annexure PD-1' annexed in Technical Bid is a \\"TRUE COPY\\" (with prices blanked off) of the said 'Annexure PD-1' in the Price Bid. 6. The cost Centre Total under this cost Centre shall be more than or equal to 45% of bid total (i.e. CC-A, B, C, D, E, G & H)” 7. Deleted. 8. The customs duty on items procured for meeting the obligations under cost centre ‘E’ shall be included in the Quoted Price, no extra reimbursement of taxes & Custom Duty shall be made. The Quoted Price in Cost Centre-E shall be inclusive of all Taxes & Duties (including Customs Duty) excluding GST. COST CENTRE: E COMPREHENSIVE MAINTENANCE OF 90 NUMBERS STANDARD GAUGE CARS AS WELL AS DEPOT M&PS, SPECIAL TOOLS, JIGS AND FIXTURES, TESTING AND DIAGNOSTIC EQUIPMENT, TEST BENCHES, MATERIAL HANDLING EQUIPMENT ETC. IN THE DEPOT (CLAUSE ITB 1.1 OF BDS) FOR DLMP AS DEFINED IN CLAUSE PC 8.2 Milestone Number WORK DESCRIPTION Foreign Currency(I) Foreign Currency(II) FOREIGN CURRENCY(III) Indian Rupees (IV) Fixed Apportioned Percentage USD JPY EUR INR MILESTONE ACTIVITY (Column 'A') (Column 'B') (Column 'C') (Column 'D') Obtain the “Notice of No Objection” or “Notice of No Objection Subject to------“from the Project Manager for the Comprehensive Maintenance of Rolling Stock, Depot, Machinery & Plants, Special Tools, Jigs, Fixtures, Gauges, Testing and Diagonostic Equipment in the Depot (as per ERGS chapter 15 to 19) (ITB clause 1.1): TOTAL MAINTENANCE COST FOR 15 NUMBERS 6 CARS TRAINSETS AS WELL AS DEPOT M&PS, SPECIAL TOOLS, JIGS AND FIXTURES, TESTING AND DIAGNOSTIC EQUIPMENT, TEST BENCHES, MATERIAL HANDLING EQUIPMENT ETC FOR A PERIOD OF 35 YEARS/COST CENTRE TOTAL(X) DLMP period in Years 35.0 Number of 6 Car Traisets 15.0 Average Maintenance Amount per Year for each 6-Car Trainset [X/(35*15)] 0.0 0.0 0.0 0.0 1.0 E1 Apportioned Amount for each 6-Car Trainset for First Service Year 0.0 0.0 0.0 0.0 0.3 E2 Apportioned Amount for each 6-Car Trainset for Second Service Year 0.0 0.0 0.0 0.0 0.4 E3 Apportioned Amount for each 6-Car Trainset for Third Service Year 0.0 0.0 0.0 0.0 0.8 E4 Apportioned Amount for each 6-Car Trainset for Fourth Service Year 0.0 0.0 0.0 0.0 1.0 E5 Apportioned Amount for each 6-Car Trainset for Fifth Service Year 0.0 0.0 0.0 0.0 0.7 E6 Apportioned Amount for each 6-Car Trainset for Sixth Service Year 0.0 0.0 0.0 0.0 0.8 E7 Apportioned Amount for each 6-Car Trainset for Seventh Service Year 0.0 0.0 0.0 0.0 0.8 E8 Apportioned Amount for each 6-Car Trainset for Eighth Service Year 0.0 0.0 0.0 0.0 1.5 E9 Apportioned Amount for each 6-Car Trainset for Ninth Service Year 0.0 0.0 0.0 0.0 0.9 E10 Apportioned Amount for each 6-Car Trainset for Tenth Service Year 0.0 0.0 0.0 0.0 1.0 E11 Apportioned Amount for each 6-Car Trainset for Eleventh Service Year 0.0 0.0 0.0 0.0 0.9 E12 Apportioned Amount for each 6-Car Trainset for Twelfth Service Year 0.0 0.0 0.0 0.0 0.9 E13 Apportioned Amount for each 6-Car Trainset for Thirteenth Service Year 0.0 0.0 0.0 0.0 1.0 E14 Apportioned Amount for each 6-Car Trainset for Fourteenth Service Year 0.0 0.0 0.0 0.0 1.1 E15 Apportioned Amount for each 6-Car Trainset for Fifteenth Service Year 0.0 0.0 0.0 0.0 1.0 E16 Apportioned Amount for each 6-Car Trainsets for Sixteenth Service Year 0.0 0.0 0.0 0.0 1.95 E17 Apportioned Amount for each 6-Car Trainset for Seventeenth Service Year 0.0 0.0 0.0 0.0 0.3 E18 Apportioned Amount for each 6-Car Trainset for Eighteenth Service Year 0.0 0.0 0.0 0.0 0.9 E19 Apportioned Amount for each 6-Car Trainset for Nineteenth Service Year 0.0 0.0 0.0 0.0 1.3 E20 Apportioned Amount for each 6-Car Trainset for Twentieth Service Year 0.0 0.0 0.0 0.0 0.9 E21 Apportioned Amount for each 6-Car Trainset for Twenty-first Service Year 0.0 0.0 0.0 0.0 1.1 E22 Apportioned Amount for each 6-Car Trainset for Twenty-second Service Year 0.0 0.0 0.0 0.0 1.0 E23 Apportioned Amount for each 6-Car Trainset for Twenty-third Service Year 0.0 0.0 0.0 0.0 1.5 E24 Apportioned Amount for each 6-Car Trainset for Twenty-fourth Service Year 0.0 0.0 0.0 0.0 0.9 E25 Apportioned Amount for each 6-Car Trainset for Twenty-fifth Service Year 0.0 0.0 0.0 0.0 1.1 E26 Apportioned Amount for each 6-Car Trainset for Twenty-sixth Service Year 0.0 0.0 0.0 0.0 1.0 E27 Apportioned Amount for each 6-Car Trainset for Twenty-seventh Service Year 0.0 0.0 0.0 0.0 1.2 E28 Apportioned Amount for each 6-Car Trainset for Twenty-eighth Service Year 0.0 0.0 0.0 0.0 1.0 E29 Apportioned Amount for each 6-Car Trainset for Twenty-ninth Service Year 0.0 0.0 0.0 0.0 1.1 E30 Apportioned Amount for each 6-Car Trainset for Thirtieth Service Year 0.0 0.0 0.0 0.0 0.9 E31 Apportioned Amount for each 6-Car Trainset for Thirty-first Service Year 0.0 0.0 0.0 0.0 1.0 E32 Apportioned Amount for each 6-Car Trainset for Thirty-second Service Year 0.0 0.0 0.0 0.0 1.95 E33 Apportioned Amount for each 6-Car Trainset for Thirty-third Service Year 0.0 0.0 0.0 0.0 0.8 E34 Apportioned Amount for each 6-Car Trainset for Thirty-fourth Service Year 0.0 0.0 0.0 0.0 1.0 E35 Apportioned Amount for each 6-Car Trainset for Thirty-fifth Service Year 0.0 0.0 0.0 0.0 1.0 TOTAL Apportioned Amount for each 6-Car Trainset for 35 year 0.0 0.0 0.0 0.0 Note:1. DELETED2.The Maintenance Amount shall be payable on quarterly basis on completion of each quarter of Accounting Year. The 1st Quarter (Q1) of the Accounting Year shall begin on 1st April of each year and 2nd Quarter (Q2) on 1st July, 3rd Quarter (Q3) on 1st October and 4th Quarter on 1st January.3.The Total Maintenance Amount applicable for a quarter of any Accounting Year shall be calculated as Sum total of the Maintenance Amount of each Trainset under DLMP Obligations during the quarter where Maintenance Amount of each of the Trainset shall be calculated as below: –RSDLMPFn = 0.25 x RSDLMPFa x (RSDAM / RSDQ)Where;RSDLMPFn= Maintenance Amount applicable for each 6-car Train set for the quarter, where suffix ‘n’ is the Trainset number.RSDLMPFa = Applicable Annual Maintenance Amount of the Train for the corresponding Service Year of Maintenance.RSDAM = Train-Days under Maintenance Obligations for the corresponding Service Year of maintenance during the Quarter.RSDQ= No of Days in the relevant Quarter. COST CENTRE NO. F DELETED COST CENTRE No. G– UNIT EXCHANGE SPARES, MANDATORY SPARES, SPECIAL TOOLS, JIGS, FIXTURES, GAUGES, TESTING AND DIAGNOSTIC EQUIPMENT This Cost Centre comprises all those obligations and activities throughout the contract connected with the provision and supply of spares, special tools, jigs, fixtures, gauges, testing and diagnostic equipment. This includes but is not limited to: · Supply of Unit exchange spares and Mandatory Spares · Supply of Special tools, jigs, fixtures, gauges, testing and diagnostic equipment. · Any other item considered necessary by the Contractor to comply with the Scope of Works. NOTES: 1. The costs indicated in this Cost Centre for all the Milestones 'GA1', 'GA2' & 'GA5' shall be the ACTUAL COSTS and not the apportioned cost. Apportionment of amount of foreign currency shall be in consonance with the actual import.2. It is certified that 'Annexure PD-1' annexed in Technical Bid is a \\"TRUE COPY\\" (with prices blanked off) of the said 'Annexure PD-1' in the Price Bid. SIGNATURE OF BIDDER COST CENTRE 'G' : UNIT EXCHANGE SPARES, MANDATORY SPARES, AND SPECIAL TOOLS, JIGS, FIXTURES, GAUGES, TESTING AND DIAGNOSTIC EQUIPMENT Milestone Number WORK DESCRIPTION Foreign Currency(I) Foreign Currency(II) Foreign Currency(III) Indian Rupees (IV) Weeks from Commencement Date USD JPY EUR INR MILESTONE ACTIVITY (Column 'A') (Column 'B') (Column 'C') (Column 'D') Obtain the “Notice of No Objection” or “Notice of No Objection Subject to------“from the Project Manager for the delivery of the following: GA1 Unit Exchange Spares - 0.0 0.0 0.0 0.0 (Details to be given as per Annexure GA 1) GA2 Mandatory Spares - 0.0 0.0 0.0 0.0 (Details to be given as per Annexure GA 2) GA5 Special tools, jigs, fixtures, gauges, testing and diagnostic equipment 0.0 0.0 0.0 0.0 (Details to be given as per Annexure GA 5) Cost Centre TOTAL 0.0 0.0 0.0 0.0 Notes : 1.0 The costs indicated in this Cost Centre for all the Milestones GA1, GA2 and GA5 shall be the actual costs and not the apportioned costs. Apportionment of amount of foreign currency shall be in consonance with the actual import. 2.0 For Milestone GA1, GA2 and GA5 Bidder must furnish unit price for each item under these Milestones and shall not alter the quantities indicated under these Milestones for each item. 3.0 Employer at his sole discretion may exercise the option to increase /decrease the quantities (upto Nil Quantity/to any extent) of spares indicated under milestones GA1, GA2 and GA5. However the value for the option to increase/decrease the quantities shall be within the ±15% of the Contract Price.For increased quantities, payment to the contractor shall be on the basis of actual supplies made and quoted unit rates and no escalation or any other additional sums shall be payable. Any increase/decrease in quantities may be intimated at any time till completion of 5 years after taking over of the last trainset by DMRC. The delivery schedule for the enhanced quantities shall be mutually agreed. 4.0 Contractor shall indicate the annual percentage escalation/deflation that will be applicable for increase or decrease of the unit cost of each item/spare listed in Annexures GA1, GA2 and GA5 for procurement by Employer for a period of upto five years after completion of five years from the date of taking over of last trainset by DMRC.For avoidance of doubt, following example is provided:Say, the date of taking over of last trainset is 07-Nov-2024, then the price quoted for each item/spare listed in Annexures GA1, GA2 and GA5 shall be applicable till 06-Nov-2029 and the annual percentage escalation/deflation on the price quoted for each item/spare listed in Annexures GA1, GA2 and GA5 shall be applicable for the period from 07-Nov-2029 to 05-Nov-2034. 5.0 Employer may exercise the option to procure individual Spares listed in Annexures GA1, GA2 and GA5 by the Bidder at any time within five years after completion of five years from the date of taking over of last trainset by DMRC. Procurement Price in such case shall be calculated by considering the percentage of increase/decrease per annum (with minimum duration as one month) as quoted by the Contractor in Annexures GA1, GA2 and GA5For avoidance of doubt, following example is provided:Say, the date of taking over of last trainset is 07-Nov-2024, then the price quoted for each item/spare listed in Annexures GA1, GA2 and GA5 shall remain same for the supplies instructed/ordered by DMRC till 06-Nov-2029. The annual percentage escalation/deflation on the price quoted for each item/spare listed in Annexures GA1, GA2 and GA5 shall be applicable on the supplies instructed/ordered by DMRC during the period from 07-Nov-2029 to 05-Nov-2034. 6.0 The Cost Centre 'G' (GA1, GA2 & GA5) will not be part of 'Cost Centre E' i.e. COMPREHENSIVE MAINTENANCE OF ROLLING STOCK, DEPOT AND MACHINERY & PLANTs (M&Ps) AND SPECIAL TOOLS, JIGS, FIXTURES, GAUGES, TESTING AND DIAGNOSTIC EQUIPMENT, TEST BENCHES & MATERIAL HANDLING EQUIPMENT etc. IN THE DEPOT (Clause ITB 1.1 of BDS) FOR DLMP AS DEFINED IN 'PC 8.2' 7.0 IMPORTANT NOTE REGARDING EVALUATION OF COST QUOTED UNDER THIS COST CENTRE Wherever Bidders do not quote for spares against milestones ‘GA1’, 'GA2' and ‘GA5' exactly as per specified list of spares in the Bid, following methodology for loading of prices for milestones ‘GA1’, 'GA2' and ‘GA5’ will be considered: 7.1 Cases where the Bidder has quoted unit rates but the quoted quantity do not match with the specified quantity in the Bid – Unit price quoted will be considered for calculating the procurement price of the quantities specified in the Bid and this calculated price will be considered for evaluation. 7.2 Cases where Bidder has mentioned unit rates as 'ZERO' or '0' or '-' or 'NIL':– For all such items the prices shall be considered as '0 (Zero)' for evaluation.– Also, during actual contract execution, such items, if any, will be considered as to be supplied free of cost to the Employer. 7.3 Cases where Bidder has either left unit rates blank or some items have been excluded from the specified list – For all such items, the average prices quoted by the other responsive Bidders for such item will be considered and added to the respective Milestone price quoted by the Bidder. This calculated price will be considered for evaluation.– However, during actual contract execution, such items, if any, will be considered as to be supplied free of cost to the Employer. 7.4 Cases where the Bidder has quoted for additional items (over and above the items specified in the Bid):- Price of additional items quoted by the Bidder will not be considered for evaluation and such items will not form part of the contract. 8.0 Working Out of Monthly Cash for Items in This Cost Centre 'G': Deleted 8.1 Deleted. 8.2 Deleted. 9.0 It is certified that 'Annexure PD-1' annexed in Technical Bid is a \\"TRUE COPY\\" (with prices blanked off) of the said 'Annexure PD-1' in the Price Bid. 10.0 Deleted. 11.0 Bidders shall fill the 'Milestone Completion Date' (wherever not specified) against each Milestone Activity above, such that it falls within the relevant Key Dates (refer Form FB-1 to Forms of Bid). In case of non compliance to this condition, the Employer shall consider the relevant activity under the non-compliant 'Milestone Completion Date' to be completed on the respective Key Date as mentioned in the tender conditions for all purposes including tender evaluation. SIGNATURE OF BIDDER Unit Exchange Spares for 15 trainset of '6' Car Unit Exchange Spares: Annexure - GA1 (* 'set' means as used in '3-car unit ( DM+T+M) ' S.No. System Spares Description Part No. Unit* Quantity Unit Cost Total Cost Escalation p.a (%) REMARKS F. C(I) F. C(II) F. C(III) L. C (IV) F. C(I) F. C(II) F. C(III) L. C (IV) F. C(I) F. C(II) F. C(III) L. C (IV) USD JPY EUR (INR) USD JPY EUR (INR) USD JPY EUR (INR) |
| 30 | High Voltage |
| 31 | Propulsion |
| 32 | Auxiliary Power System |
| 33 | All kind of Doors |
| 34 | Brakes & Pneumatic System |
| 35 | Bogie |
| 36 | Communication System |
| 37 | Video Surveillance System |
| 38 | Fire Detection System |
| 39 | Train Control & Management |
| 40 | Wiper System |
| 41 | Couplers & Gangways |
| 42 | Vehicle Body, Saloon Interior & Exterior |
| 43 | TOTAL(GA1) 0.0 0.0 0.0 0.0 Mandatory Spares for 15 trainset of '6 car' Annexure - GA2 Mandatory Spares: (* 'Set' means as used in '3-car unit ( DM+T+M) ) S.No. System Spares Description Part No. Unit* Quantity Unit Cost Total Cost Escalation p.a (%) REMARKS F. C(I) F. C(II) F. C(III) L. C (IV) F. C(I) F. C(II) F. C(III) L. C (IV) F. C(I) F. C(II) F. C(III) L. C (IV) USD JPY EUR (INR) USD JPY EUR (INR) USD JPY EUR (INR) |
| 44 | High Voltage |
| 45 | Propulsion |
| 46 | Auxiliary Power System |
| 47 | All kind of Doors |
| 48 | Brakes & Pneumatic System |
| 49 | Bogie |
| 50 | Communication System |
| 51 | Fire Detection System |
| 52 | Fire Extinguisher |
| 53 | Train Control & Management Systsem |
| 54 | Electrical & Control |
| 55 | Lighting & Wiper System |
| 56 | Couplers & Gangways |
| 57 | Vehicle Body, Saloon Interior & Exterior |
| 58 | TOTAL(GA2) 0.0 0.0 0.0 0.0 Annexure - GA 5 Special Tools, Jigs, Fixtures, Gauges, Testing and Diagnostic Equipment for 15 trainset of '6 car' ` (A) MANDATORY SPECIAL TOOLS , JIGS ,FIXTURES, GAUGES, TESTING AND DIAGNOSTIC EQUIPMENT ('Set' means numbers of complete special Tools/Jigs/Fixtures/Gauges/Testing & Diagnostic Equipment) S No. ERTS Clause No. EQUIPMENT Part No. Unit Qty Unit Cost Total Cost Escalation p.a (%) REMARKS F. C(I) F. C(II) F. C(III) L. C F. C(I) F. C(II) F. C(III) L. C F. C(I) F. C(II) F. C(III) L. C USD JPY EUR (INR) USD JPY EUR (INR) USD JPY EUR (INR) |
| 59 | 3.22.9,3.25 |
| 60 | 4.15.1(vii),4.18 |
| 61 | 5.11.5,5.18 |
| 62 | 5.14.2, 5.18 |
| 63 | 5.14.2,5.18 |
| 64 | 6.15.4,6.27 |
| 65 | 6.17.6, 6.17.7, 6.25&6.27 |
| 66 | 7.2.1 (xvii),7.9 |
| 67 | 8.9.14,8.12 |
| 68 | 8.10.13,8.10.14,8.10.16 & 8.12 |
| 69 | 9.2.8 (x),9.7 |
| 70 | 9.2.10,9.7 |
| 71 | 9.2.18,9.7 |
| 72 | 9.4.9,9.7 |
| 73 | 10.3.4,10.14 |
| 74 | 10.5.4,10.14 |
| 75 | 10.6.3,10.14 |
| 76 | 10.9.1,10.14 |
| 77 | 10.10.7,10.14 |
| 78 | 10.12.410.14 |
| 79 | 10.11.2(i) & 10.11.2(ii),10.14 |
| 80 | 10.11.1(iii),10.14 |
| 81 | 10.11.1(iv),10.14 |
| 82 | 11.2.8,11.14 |
| 83 | 11.4.3,11.14 |
| 84 | 12.8.1 (iv),12.13 |
| 85 | 12.9.1 (x),12.13 |
| 86 | 13.1.1 (xi),13.6.1 (v)13.11.3,13.12&13.13 |
| 87 | 13.9.11,13.13 TOTAL GA5 (A) 0.0 0.0 0.0 0.0 NOTE:1. Delivery of the items listed in Annexure'GA5' shall be a prerequisite for accomplishment of the KD 6.1 .However, exemption for Key Date delivery of certain items may be granted to the Contractor subjected to approval of the Engineer. COST CENTRE No. H – TRAINING AND MANUALS This Cost Centre comprises: 1. All those obligations and activities throughout the Contract associated with training of Employer's operating and maintenance personnel. This includes but is not limited to: ♦ Deputation of Instructors by the Contractors for training of the deputed operating and maintenance personnel of the Employer in India. ♦ Training of operating and maintenance personnel of the Employer at the Contractor’s facilities. ♦ Furnishing of Training Manual and connected Materials. ♦ Any other item considered necessary by the Contractor to comply with the Scope of Works. Notes: 1.0 The Bidder shall not complete the column “Weeks for completion of Milestone from commencement date” for the Milestone Activities 'H1' to 'H5'.The dates of operation of these Milestone Activities will be at the discretion of the Employer. 2.0 Deleted 3.0 The travel, boarding and lodging expenses for the Employer's trainees sent overseas will be borne by the Employer. 2. All those obligations and activities throughout the Contract associated with the provision of Manuals. This includes but is not limited to: ♦ Provision of Operating Manuals (Hard copies and in Electronic format). ♦ Provision of Maintenance Manuals (Hard copies and in Electronic format). ♦ Provision of Spare Parts Catalogue (Hard copies and in Electronic format). ♦ Any other item considered necessary by the Contractor to comply with the Scope of Works. Note: 1. Amount quoted in this Cost Centre shall be the actual cost and not the apportioned cost.2. It is certified that 'Annexure PD-1' annexed in Technical Bid is a \\"True Copy\\" (with prices blanked off) of the said 'Annexure PD-1' in the Price Bid. SIGNATURE OF BIDDER COST CENTRE No. H – TRAINING AND MANUALS MILESTONE NUMBER WORK DESCRIPTION ACTUAL AMOUNT MILESTONE COMPLETION DATE ( IN WEEKS FROM COMMENCMENT DATE) FOREIGN CURRENCY(I) FOREIGN CURRENCY(II) FOREIGN CURRENCY(III) INDIAN RUPEES(IV) USD JPY EUR INR MILESTONE ACTIVITY COLUMN A COLUMN B COLUMN C COLUMN D Obtain the “Notice of No Objection” or “Notice of No Objection Subject to------“from the Project Manager for the completion of all training including delivery of final training manuals for the following: H1 Training of Employer's Driving Instructors and Drivers (2 man month) in operation of MRTS off-shore H2 Training of Employer's maintenance personnel (10 man months) in Contractor’s / Sub Contractor's Works and MRTS Offshore. H3 Provision of Contractor’s Driving Instructors and Drivers (2 man months) for Training of Employer's operating personnel in India. H4 Provision of Contractor’s Instructors or OEM's Experts (12 man month) for Training of Employer's maintenance personnel in India. H5 Submission of Training Manuals (Original plus three hard Copies) and in Electronic format. Obtain the “Notice of No Objection” or “Notice of No Objection Subject to---“ from the Project Manager on delivery of the following final Manuals: H6 Operating Manual (Original plus 3 Hard copies). H7 Operating Manual in Electronic format. H8 Maintenance Manual (Original plus 3 Hard copies). H9 Maintenance Manual in Electronic format. H10 Spare parts Catalogue (Original plus 3 Hard copies). H11 Spare parts Catalogue in Electronic format. Obtain the “Notice of No Objection” or “Notice of No Objection Subject to---“ from the Project Manager for completion of the following: H12 Any other item considered necessary by the Contractor to comply with the scope of works COST CENTRE TOTAL 0.0 0.0 0.0 0.0 Notes: |
| 88 | The Tenderer shall not complete the column “Weeks for completion of Milestone from commencement date” for Milestones H1 to H5 and H12. |
| 89 | The dates of operation of the Milestone Activities for Milestones H1 to H5 and H10 to H12 will be at the discretion of the Employer. |
| 90 | The completion of Milestone 'H6' to 'H9' shall be considered as a pre-requisite for accomplishment of Key Date '6.1' |
| 91 | Deleted |
| 92 | The travel, boarding and lodging expenses for the employer’s trainees sent overseas will be borne by the Employer. |
| 93 | Amount quoted in this Cost Centre shall be ACTUAL COST and not apportioned cost. Apportionment of amount of foreign currency shall be in consonance with the actual import. |
| 94 | It is certified that 'Annexure PD-1' annexed in Technical Bid is a \\"TRUE COPY\\" (with prices blanked off) of the said 'Annexure PD-1' in the Price Bid. |
| 95 | Bidders shall fill the 'Milestone Completion Date' (wherever not specified) against each Milestone Activity above, such that it falls within the relevant Key Dates (refer Form FB-1 to Forms of Bid). In case of non compliance to this condition, the Employer shall consider the relevant activity under the non-compliant 'Milestone Completion Date' to be completed on the respective Key Date as mentioned in the tender conditions for all purposes including tender evaluation. SIGNATURE OF BIDDER Annexure PD-2 MILESTONE PAYMENT SCHEDULE SHOWING CASHFLOWS FOR THE CONTRACT This document to be prepared and completed as required by the Tenderer and submitted as part of Form FB-2 to the Forms of Bid |
| 96 | It is certified that 'Annexure PD-2' annexed in Technical Bid is a \\"TRUE COPY\\" (with prices blanked off) of said 'Annexure PD-2' in the Price Bid. Annexure PD-3 PRICING OF UNQUALIFIED WITHDRAWAL OF CONDITIONS, QUALIFICATIONS, DEVIATIONS ETC. SUBMITTED IN FORM FB-10 ('A', 'B' and 'C')TO FORMS OF BID Item Condition, Qualification, Deviation etc. Key date affected by each condition, qualification, deviation etc. Increase or Decrease for unqualified withdrawal of each conditions, qualification, deviation etc. (excluding 'Taxes & Duties' ) Cost Centre Milestone No. F.C. (I) F.C. (II) F.C. (III) L.C. (IV) USD JPY EUR (INR) A B C D E F G H I TOTAL 0.0 0.0 0.0 0.0 Notes: |
| 97 | In this Annexure, the Tenderer shall indicate every key date that will be affected by each remark, comment, condition, qualifications or deviation, etc. that has been specified in Form FB-10 to Forms of Bid ('A', 'B' and 'C'). |
| 98 | Prices for unqualified withdrawal of each remark, comment, condition, qualifications or deviation, etc. that has been specified in Form FB-10 ('A', 'B' and 'C') shall be quoted in this Annexure PD-3 , clearly indicating the Cost Centre and Milestone No. to which it will be allocated. In case the tenderer does not indicate the Cost Centre and Milestone No., DMRC will allocate the quoted price for withdrawal to the last Milestone under Cost Centre 'D'. The 'Tender Total Lump Sum Price' quoted by the Tenderer in 'TENDER TOTAL LUMP SUM PRICE' Page shall not include the Price for withdrawal of remark, comment, condition, qualifications or deviation etc quoted in this 'Annexure PD-3' |
| 99 | In case price for unqualified withdrawal of any remark, comment, condition, qualification or deviation etc. indicated in Appendix FB-10 ('A', 'B' and 'C') is not quoted in Annexure PD-3, it shall be considered that the remark, comment, condition, qualification or deviation is unconditionally withdrawn without any financial implication. |
| 100 | It is certified that 'Annexure PD-3' annexed in Technical Bid as a \\"TRUE COPY\\" (with prices blanked off) of the said 'Annexure PD-3' in the Price Bid. Please Enable Macros to View BoQ information |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
| 5 | Click here to download tender document | Tender Documents |
| 6 | Click here to download tender document | Tender Documents |
| 7 | Click here to download tender document | Tender Documents |
| 8 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail