| 1 | Part-A |
| 2 | Estimate for Shifting and Erection of 11 KV & LT Line due to Widening of Road by R &B Division ,Nabarangpur for improvement of Kodinga to Chatahandi Road ( from 0/00 Km to 19/611 Km . |
| 3 | SCOPE OF THE WORK-Estimate for shifting and Erection in Road Widening Work by R & B Division ,Nabarangpur. 1.20 Nos of 9 Mtr Long PSC Poles & 12 Nos 10 Mtr Long PSC Pole on 11 KV Line using 55 Sq mm AAAC Conductor=2.93 C Km. 2. Dismentaling of existing HT line & Pole. |
| 4 | S/F of 10 Mtr long 400 kg PSC pole(including transportation cost) |
| 5 | S/F of 9 Mtr long 300 kg PSC pole(including transportation cost upto store) |
| 6 | S/F of 8 Mtr long 200 kg PSC pole(including transportation cost ) for Stud pole. |
| 7 | Supply and fixing of Back Clamp for Stud Pole. |
| 8 | S/F of RCC Base Plate |
| 9 | S/F of 11 KV V Cross Arm( 10.2 Kg each) |
| 10 | S/F of Back Clamp for 11 KV \\"V \\"Cross Arm( 13 nos of Pin Point Poles) |
| 11 | S/F of 11 KV F-clamp 2.9 Kg each |
| 12 | S/F of Earthing Device /Support Coil Type(GI) |
| 13 | S/F of No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.-2 Mtr.For connecting pole with Coil earthing |
| 14 | S/F of 11 KV Pin insulator Polymer. |
| 15 | S/F of Disc Insulator (B&S) 70 KN Polymer. |
| 16 | S/F of HW fitting (B&S) 70 KN (3 bolted). |
| 17 | S/F of HT Stay Set Complete. |
| 18 | Supply and fixing of 11 KV Stay insulator Polymer. |
| 19 | S/F of Stay Clamp(1.9 Kg/Pair). |
| 20 | S/F of 7/8 SWG G.I. Stay wire. |
| 21 | S/F of 55 mm2 All Alloy Aluminium Conductor.AAAC |
| 22 | S/F of PG Clamp for 55 mm2 All Alloy Aluminium Conductor.AAAC. |
| 23 | S/F of 100x50x6 mm channel for straight Cross arm 1.2 mtr Long for bottom Channel & 0.206 Mtr Long for Top Channel. |
| 24 | S/F of 75 x40 x6 mm MS channel 1.5 mtr Long 4 Nos ,for providing support for guarding at road crossing @6.8 Kg/Mtr . |
| 25 | Supply and fixing of No-6 G.I Wire for cross lacing & Earthing for Guarding Channel. |
| 26 | Supply and fixing of Eye Hook. |
| 27 | Supply and fixing of 8 SWG GI Wire for cross lacing & Earthing for Guarding Channel. |
| 28 | Supply and fixing of 40 mm nominal bore G.I. pipe (medium guage) earthing device with 3 mtr long. |
| 29 | Supply and fixing of 25 x 6 mm G.I. pipe for earthing. |
| 30 | Supply and fixing of GI Nuts & Bolts of Assorted size. |
| 31 | Supply and fixing of Danger Board |
| 32 | Supply and fixing of Back Clamp for danger board(25 x3 mm GI Earth Flat ,0.59 kg/Mtr & 0.51 Mtr for each Back Clamp. |
| 33 | Supply and fixing of ANTICLIMBING DEVICE / Barbed wire (3 KG per supprot ) |
| 34 | Supply and fixing of Back Clamp for ACD(25 x3 mm Earth Flat ,0.59 kg/Mtr & 0.51 Mtr for Each Back Clamp. |
| 35 | Supply and fixing of Fish Plate for DP (50x8mm of Flat ,0.97Kg/Mtr & 0.28Mtr Long for Each ) |
| 36 | Supply and fixing of Cross Bracing Angel of 50 x 50 x6 mm 3.5 mtr long 2 nos (4.5 kg/mtr ). Rs.10.00 added for Galvanization. |
| 37 | Supply and fixing of Lightning Arrester (12 KV,10 KA ) Station Class. |
| 38 | Supply and fixing of 10 Core 2.5 mm2 Cu Control Cable (armoured ),2 XY for Service Connection Charges. |
| 39 | Saundries(paint,binding tape ,etc) |
| 40 | CIVIL ITEMS |
| 41 | Couping ratio 1:1.5:3 with dimension ( 500X500X1500)=0.375 Cu mtr |
| 42 | Couping ratio 1:1.5:3 with dimension ( 500X500X1500)=0.45 Cu mtr |
| 43 | Couping ratio 1:1.5:3 with dimension(500 x500 x450)=0.1125 Cu mtr |
| 44 | Dismantling charges of Steel Structure. |
| 45 | Concrete material for stay anchor plate (0.45x0.45x1.5)mtr |
| 46 | Material for earthing including masonary work for earth pit,salt,charcoal and RCC Cover. |
| 47 | Dismantling charges of existing HT lines |
| 48 | Dismantling charges of existing HT poles |
| 49 | Dismentaling charges of existing M. unit |
| 50 | Dismentaling & Shifting charges of existing 11 KV M. unit |
| 51 | SCOPE OF THE WORK-Estimate for shifting and Erection in Road Widening Work by R & B Division ,Nabarangpur. 1.15 Nos of 9 Mtr Long PSC Pole for Road Crossing & 64 Nos 8 Mtr Long PSC Pole on LT Line 3X50+1x35 +1x16 Sq mm LT AB Cable=2.17 Km and 3x35+1x25 mm2 LT XLPE Aerial bunched Cable=0.11 Km. 2. Dismentaling of existing LT line & Pole. |
| 52 | S/F of 8 Mtr long 200 kg PSC pole(including transportation cost upto store) |
| 53 | S/F of 9 Mtr long 300 kg PSC pole(including transportation cost upto store) |
| 54 | S/F of RCC Base Plate |
| 55 | S/F of Earthing Device Coil Type(GI) |
| 56 | S/F of No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 57 | S/F of Pole Clamp for EYE hook (for XLPE Aerial bunched Cable) |
| 58 | S/F of Dead end clamp I hook. |
| 59 | S/F of Eye hook (for XLPE Aerial bunched Cable) |
| 60 | S/F of Suspension clamp with eye hook for ABC |
| 61 | S/F of LT Stay Set Complete |
| 62 | S/F of L.T stay insulator |
| 63 | S/F of L.T stay clamp |
| 64 | S/F of 7/12 G.I. stay wire |
| 65 | S/F of GI Bolt Nut& washer |
| 66 | S/F of 3x50+1x35+1X16 mm2 LT XLPE Aerial bunched Cable |
| 67 | S/F of 3x35+1x25 mm2 LT XLPE Aerial bunched Cable |
| 68 | S/F of Danger Bord |
| 69 | S/F of Back Clamp for danger board. |
| 70 | S/F of ANTICLIMBING DEVICE / Barbed wire (3 KG per supprot ) |
| 71 | S/F of Back Clamp for ACD. |
| 72 | Saundries(paint,binding tape ,etc) |
| 73 | CIVIL ITEMS |
| 74 | Concrete material for stay anchor plate (0.45x0.45x1.5)mtr |
| 75 | Couping ratio 1:1.5:3 with dimension ( 500X500X1500)=0.375 Cu mtr |
| 76 | Couping ratio 1:1.5:3 with dimension(500 x500 x450)=0.1125 Cu mtr |
| 77 | Dismantling charges of existing LT Line poles |
| 78 | Dismentaling charges of existing LT line |
| 79 | SCOPE OF THE WORK-Estimate for shifting and Erection in Road Widening Work by R & B Division ,Nabarangpur. 1.01 Nos of 13 Mtr Long PSC Pole for Road Crossing Guarding on 33 KV Line with 148 Sqmm AAAC =0.09 C Km. 2. Dismentaling of existing HT Pole. |
| 80 | Supply and fixing of 13 Mtr Long WPB Pole of 162 x 150 mm with Welded Base Plate. |
| 81 | Supply and fixing of 33 KV Pin insulator polymer. |
| 82 | Supply and fixing of HW fitting (B&S) 90 KN 4 bolt. |
| 83 | Supply and fixing of HW fitting (B&S) 90 KN (4 bolted). |
| 84 | Supply and fixing of HT Stay Set Complete. |
| 85 | Supply and fixing of Stay insulator . |
| 86 | Supply and fixing of Stay Clamp (1.9 kg/Pair) |
| 87 | Supply and fixing of 7/8 SWG G.I. Stay wire. |
| 88 | Supply and fixing of Earthing device/Support Coil type (GI). |
| 89 | Supply and fixing of No-8 GI Wire (Dia 4.6 mm) 0.131 KG/Mtr-2 Mtr for connection pole with coil earthing. |
| 90 | Supply and fixing of GI Nuts & Bolts of Assorted size. |
| 91 | Supply and fixing of 148 mm2 AAA Conductor. |
| 92 | Supply and fixing of PG Clamp for 148 mm2 AAA Conductor. |
| 93 | Supply and fixing of 100x50x6 mm channel for straight Cross arm 1.8 mtr Long for bottom Channel & 0.306 Mtr Long for Top Channel. |
| 94 | Supply and fixing of 75x40x 6 mm MS channel of 2 mtr Long 4 Nos for providing support for guarding at road crossing @6.8 kg/mtr. |
| 95 | Supply and fixing of No.-6 G.I Wire for cross lacing & Earthing for Guarding Channel. |
| 96 | Supply and fixing of Eye hook. |
| 97 | Supply and fixing of 8 SWG GI Wire for cross lacing & Earthing for Guarding Channel. |
| 98 | Supply and fixing of 40 mm nominal bore G.I. pipe (medium guage) earthing device with 3 mtr long. |
| 99 | Supply and fixing of 25 x 6 mm G.I. pipe for earthing. |
| 100 | Supply and fixing of Danger Board |
| 101 | Supply and fixing of Back Clamp for danger board(25 x3 mm GI Earth Flat ,0.59 kg/Mtr & 0.51 Mtr for each Back Clamp. |
| 102 | Supply and fixing of ANTICLIMBING DEVICE / Barbed wire (3 KG per supprot ) |
| 103 | Supply and fixing of Back Clamp for ACD(25 x3 mm Earth Flat ,0.59 kg/Mtr & 0.51 Mtr for Each Back Clamp. |
| 104 | Supply and fixing of Fish Plate for DP (50x8mm of Flat ,0.97Kg/Mtr & 0.28Mtr Long for Each ) |
| 105 | Saundries(paint, binding tape ,etc) |
| 106 | Civil Works |
| 107 | Concrete material for stay anchor plate (0.45x0.45x1.5)mtr |
| 108 | Concrete ratio 1:1.5:3(500 mm x500 mm x1500 mm)=0.55 Cu. Mtr |
| 109 | Couping ratio 1:1.5:3 with dimension (500 x500 x450)=0.1125 Cu mtr |
| 110 | Material for earthing including masonary work for earth pit,salt,charcoal and RCC Cover. |
| 111 | Dismantling charges of existing HT poles |
| 112 | Dismentaling charges of existing HT Poles. |
| 113 | Estimate for Shifting and erection of DP Pole Mounted 25KVA DT Substation including Substation Fencing & Dismentaling of DT in Road Widening Work . |
| 114 | Supply and fixing of 9 Mtr Long 300 Kg PSC Pole (including Transportation cost) |
| 115 | Supply and fixing of RCC Base Plate for Support. |
| 116 | S/F of Earthing Support (Coil type) |
| 117 | S/F of No.6 G.I wire for earthing |
| 118 | S/F of Pressure channel 100X50X6mm, 2.8mtr 2 Nos. |
| 119 | S/F of Transformer mounting channel 100X50X6mm, 2.8mtr long 2 Nos.(9.2Kg/Mtr.) |
| 120 | S/F of Support Channel For Transformer mounting channel 100X50X6mm, 0.5Mtr long 2 Nos.(9.2Kg/Mtr.) |
| 121 | S/F of AB Switch & HG fuse mounting channel 75X40X4.8 mm,2.8mtr.Long 2 Nos.(6.8Kg/mtr) |
| 122 | S/F of Support Channel for AB Switch Mounting channel 75X40X4.8 mm,0.5 Mtr.Long 4 Nos.(6.8Kg/mtr) |
| 123 | S/F of Cantilever channel for supporting HG fuse 75X40X6mm MS Angle 1.2 mtr. Long 2 Nos. (6.8Kg/mtr) |
| 124 | S/F of Bracing Angle for supporting HG fuse 50X50X6mm MS Angle 1.5 mtr. Long 2 Nos. (4.5Kg/mtr) |
| 125 | S/F of Back Clamp for HG Fuse Bracing Angle |
| 126 | S/F of Transformer belting angle of 50X50X6mm,2.8 Mtr long , 02 Nos.(4.5Kg/Mtr.) with side angle total (7mtr) |
| 127 | S/F of Angle for mounting LT Distribution Box 50X50X6mm 1.2mtr. Long 2 Nos.(4.5Kg/mtr) |
| 128 | S/F of Clamp for Supporting Structure of LTDB Box |
| 129 | S/F of Disc insulator (B&S)70 KN polymer |
| 130 | S/F of H W fitting (B& S) 70KN(3bolted) |
| 131 | S/F of 11 KV Pin Insulator polymer |
| 132 | S/F of AB switch(11 kV,400 A,3 pole,50 Hz) |
| 133 | S/F of HG fuse (11 KV,400 A,3 pole)with PI |
| 134 | S/F of Lightning Arrester (9 KV, 10 KA) station class, Class-1 |
| 135 | S/F of LT Distribution Box with MCCB, Aluminium Busbar of 2- Bay with kit kat fuse for 25 KVA S/S |
| 136 | S/F of HT Stay Set(Complete). |
| 137 | S/F of Stay insulator. |
| 138 | S/F of Stay Clamp. |
| 139 | S/F of 7/10 G.I . Stay Wire.. |
| 140 | S/F of G.I Pipe Earthing 40mm Dia medium gauge 2.5mtr long |
| 141 | S/F of GI Nuts &Bolts of Assorted size |
| 142 | S/F of 1Cx70 mm2 LT XLPE Cable (Un -Armoured) |
| 143 | S/F of GI Flat 25x6mm for Earthing |
| 144 | S/F of Danger Board |
| 145 | S/F of Back Clamp for Danger Board . |
| 146 | S/F of ANTICLIMBING DEVICE / Barbed wire (3 KG per support ) |
| 147 | S/F of Back Clamp for ACD . |
| 148 | S/F of Fish Plate for DP (50x8mm of Flat ,0.97Kg/Mtr & 0.28Mtr Long for Each ) |
| 149 | S/F of PG clamp for 55 mm2 AAA conductor |
| 150 | S/F of Black paint |
| 151 | S/F of Yellow Paint |
| 152 | S/F of Saundries(paint,binding tape ,etc) |
| 153 | CIVIL ITEMS |
| 154 | Concreting of support C.C. 1:1.5:3 |
| 155 | Couping with C.C. 1:1.5:3 |
| 156 | Material for earthing including masonary work for earth pit, salt, charcoal and RCC Cover |
| 157 | Dismantling & Shifting of DT |
| 158 | Dismantling & Shifting of AB Switch |
| 159 | Dismantling & Shifting of HG Fuse |
| 160 | Dismantling & Shifting of LA |
| 161 | Dismantling & Shifting of Steel Structure |
| 162 | Dismantling charges of existing HT poles |
| 163 | Construction of Brick Boundary Wall ,Metal Spreading & also fixing of MS Grill Gate |
| 164 | Estimate for Shifting of Octagonal Street light Pole in Road Widening Work . |
| 165 | Dismantling & shifting charges of existing Octagonal Streetlight poles |
| 166 | Couping with C.C. 1:1.5:3 of Octagonal Street light Poles |
| 167 | Supply, installation and commissioning of 45 W INVERTER LED STREET LIGHT- RTC/RTC DIMM/ IR SENSE/ IRSENSE DIMM Inverter LED Street Light, PDC housing, IP66, Inbuilt Battery back-up- Auto ON/OFF/DIMM with aluminium pressuredie-cast housing, toughened glass in the front and peanut lensfor batwing light distribution,higher spacing between poles and maintenance-free system.The cost including installation with all accessories HALONIX MAKE: LED SLHLSLD-ML04-45-CWL-INV-DIMM-IRSEN-R . MAKE: HALONIX/OSHRAM/LT/PHILIPS |
| 168 | Supply and Installation of Tri color Triranga LED strip with driver suitable to mount octagonal pole of 9 MTR . Total 15 MTR coil 5 MTR roll in each color. |
| 169 | Earthing with G.I earth pipe 3 meter long 40mm dia ISI marked including accessories and providing masonary enclosure with cover plate having locking arrangment and watering pipe etc with charcoal and salt as required as per direction of engineer in charge. |
| 170 | Supplying and laying 25 mm x 5mm G.I. strip on surface or in recess for connection etc as required as per direction of engineer in charge. |
| 171 | Providing and fixing 6 SWG G.I. wire on surface or in recess for loop earthing as required as per direction of engineer in charge. |
| 172 | AIO LED Solar Street Lights for illumination |
| 173 | Supply of 8 mtr long hot dip galvanized Octagonal pole having base dia of 155 mm and top dia of 70 mm and plate thick ness of 4 mm or more. complete with base plate and 4 nos. Jtype En 8 grade foundation bolts to withstand 180 KM / HR or more wind speed considering the weight & dimension of 1 nos 60 W AIO Solar light to be fitted in the pole at two diffrent heights ( One light on Pole Top and second light on the differential bracket)(Make - Bajaj/Utkarsh/Valmount /RR Ispat/Equivalent) |
| 174 | Supply of Elegant look 60 W (+/-10%) AIO LED Solar Street lights having extruded alluminium housing, 180Wp or more Mono Crystalline Panel/Laminates fixed on the top of the luminaire housing, maintenance free 12.8 volts 78 Ah or more LiFePO4 battery(BIS certified) , BMS, MPPT charge controller, PIR sensor to provide 2 days (24 hrs ) back up . The luminaire is having IP 65 protection for critical components, IK 07 and having lumen output of > 10000 lumen and having minimum lumen efficacy >160 lm/w) as per LM 79 report third party NABL lab to justify the lumen output & lumen efficacy . Lenses should be provided on the LED chip for better lighting dstribution to avoid glare on human eyes. Both the luminaire and Mono Crystalline Panel must be manufactured in India. |
| 175 | The Solar lighting company must submit the third party NABL lab reports to justify the luen efficacy,luminaire output , IK 08 and IP 65 protection . The Luminaire should be supplied along with adjustable type mounting bracket which can be fitted directly on the pole. The Solar Street light and solar panel having capacity of 180 Wp or more must be designed to take the wind load at 180 KM/HR wind speed (As per wind load test report ) .The Solar lighting manufacturer must submit the declaration letter by mentioning that complete solar light and the solar panel are manufactured in India and warranty certificate on their company's letterhead by mentioning warranty period as 5 years and necessary aftersales service will be provided through their tollfree base service network located within 100 KM from the project site. |
| 176 | The Solar Street light manufacturer should have own NABL accredieted laborotory. |
| 177 | The following test reports must be submitted for the technical acceptance of the products. 1.LM 79 REPORT (Central/State Govt./Third party NABL lab only) , 2. IK 08 (Report of Central/State Govt./Third party NABL lab only), 3. IP 65 (Report of Central/State Govt./Third party NABL lab only) , 4. Wind load test report of AIO Street light having 180 Wp or more capacity Solar Mono Panel suitable for 180 KM/Hr wind Speed. |
| 178 | The AIO solar street light must complies to the following :1. EN50530 - MPPT Efficiency , 2.. IEC61547 , 3. IEC61000-3-2 - EMC , 4. IEC 60598-2-3 ,5. IEC 62109-1, ( The necessary test reports of Central/State Govt./Third party NABL lab against the above must be submitted for for acceptance of product/TDS approval prior to start of the work. All the test reports must be in the name of solar lighting company )Make:(Philips/Panasonic/Wipro/ Havells/Bajaj/ Crompton/ LT/Equivalent) |
| 179 | Construction of RCC foundation by using M20grade RCC and Fe415 grade reinforcement in the foundation by considering the SBC as 10T per sq mtr and fixing 4 nos .EN8 grade foundation bolts in that foundation for installation of pole with solar lighten that foundation. The work shall be executed as per the instruction of EIC. Please Enable Macros to View BoQ information |