Tender For Excavation In Soil (Any Type) Using Hydraulic Excavator Ck 90 With Hydraulic Excavator Of 0.9 Cum Bucket Capacity Including Cutting, Trimming Bottom And Side Slopes, In Accordance With Requirements Of Lines, Grades And Cross Sections, Incl
Tender Overview
Project Description
Tender for Excavation In Soil (Any Type) Using Hydraulic Excavator Ck 90 With Hydraulic Excavator Of 0.9 Cum Bucket Capacity Including Cutting, Trimming Bottom And Side Slopes, In Accordance With Requirements Of Lines, Grades And Cross Sections, Including All Lifts And Combined Lead Upto 30M. , Providing And Filling Stones Or Spalls Into Crates And Hand Packing Including Supply Of Boulder From Nearest Approved Quarry To Site Including Loading, Unloading And Complete In All Respect And Stacking With In 15 Mtr Of Unloading Point Into Stack Of Specified Sizes , Weaving Of Msa Wire Crate Netting 15 Cm To 15 Cm Mesh I/C Binding At Site And Partition Incluing Supply Of Msa Wire 4 Mm Dia , Laying Gravel 75Mm To 25 Mm/ Filter Media. It Includes Supply And Carriage Of Filter Material From Haryal To Site Of Work Including All Taxes, Royalty Etc. Complete As Per Site Requirement & As Per Directions Of Engineer-In Charge. , Filling Spaces And Foundation With Old Stone Obtained From Dismantling Including Labour For Dismantling.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 22-Apr-2026 | Corrigendum 11 Sarala Khurd | Date | 29-Apr-2026 |
| 2 | 25-May-2026 | C-43 | Date | 28-May-2026 |
| 3 | 29-May-2026 | C-45 | Date | 01-Jun-2026 |
| 4 | 27-May-2026 | C-44 | Date | 29-May-2026 |
| 5 | 27-May-2026 | C-44 | Date | 29-May-2026 |
| 6 | 25-May-2026 | C-43 | Date | 28-May-2026 |
| 7 | 18-May-2026 | C-35 | Date | 25-May-2026 |
| 8 | 11-May-2026 | C-30 | Date | 18-May-2026 |
| 9 | 29-Apr-2026 | C-19 sarala | Date | 04-May-2026 |
| 10 | 22-Apr-2026 | C_12 BOQ Sarala Khurd | Other | 04-May-2026 |
| 11 | 05-May-2026 | C-23 | Date | 06-May-2026 |
| 12 | 06-May-2026 | C-25 | Date | 11-May-2026 |
| 13 | 05-May-2026 | C-23 | Date | 06-May-2026 |
| 14 | 04-May-2026 | C_21 sarala | Date | 05-May-2026 |
| 15 | 04-May-2026 | C_21 sarala | Date | 05-May-2026 |
| 16 | 29-Apr-2026 | C-19 sarala | Date | 04-May-2026 |
| 17 | 01-Jun-2026 | C-47 | Date | 05-Jun-2026 |
| 18 | 29-May-2026 | C-45 | Date | 01-Jun-2026 |
| 19 | 01-Jun-2026 | C-47 | Date | 05-Jun-2026 |
| 20 | 05-Jun-2026 | C-51 | Date | 10-Jun-2026 |
| 21 | 11-Jun-2026 | C_58 | Date | 12-Jun-2026 |
| 22 | 08-Jun-2026 | C-53 | Date | 09-Jun-2026 |
| 23 | 09-Jun-2026 | C-54 | Date | 10-Jun-2026 |
| 24 | 10-Jun-2026 | Corrigendum 55 | Date | 11-Jun-2026 |
| 25 | 05-Jun-2026 | C-51 | Date | 08-Jun-2026 |
| 26 | 12-Jun-2026 | C_59 | Date | 15-Jun-2026 |
| 27 | 11-Jun-2026 | C_58 | Date | 12-Jun-2026 |
| 28 | 10-Jun-2026 | Corrigendum 55 | Date | 11-Jun-2026 |
| 29 | 09-Jun-2026 | C-54 | Date | 10-Jun-2026 |
| 30 | 05-Jun-2026 | C-51 | Date | 08-Jun-2026 |
| 31 | 08-Jun-2026 | C-53 | Date | 09-Jun-2026 |
| 32 | 09-Jun-2026 | C-54 | Date | 10-Jun-2026 |
| 33 | 10-Jun-2026 | Corrigendum 55 | Date | 11-Jun-2026 |
| 34 | 15-Jun-2026 | C_60 | Date | 16-Jun-2026 |
| 35 | 12-Jun-2026 | C_59 | Date | 15-Jun-2026 |
| 36 | 05-Jun-2026 | C-51 | Date | 08-Jun-2026 |
| 37 | 08-Jun-2026 | C-53 | Date | 09-Jun-2026 |
| 38 | 11-Jun-2026 | C_58 | Date | 12-Jun-2026 |
| 39 | 19-Jun-2026 | C-67 | Date | 22-Jun-2026 |
| 40 | 17-Jun-2026 | C_64 | Date | 19-Jun-2026 |
| 41 | 16-Jun-2026 | C_62 | Date | 17-Jun-2026 |
| 42 | 15-Jun-2026 | C_60 | Date | 16-Jun-2026 |
| 43 | 12-Jun-2026 | C_59 | Date | 15-Jun-2026 |
| 44 | 11-Jun-2026 | C_58 | Date | 12-Jun-2026 |
| 45 | 10-Jun-2026 | Corrigendum 55 | Date | 11-Jun-2026 |
| 46 | 09-Jun-2026 | C-54 | Date | 10-Jun-2026 |
| 47 | 11-May-2026 | C-30 | Date | 18-May-2026 |
| 48 | 06-May-2026 | C-25 | Date | 11-May-2026 |
| 49 | 05-May-2026 | C-23 | Date | 06-May-2026 |
| 50 | 04-May-2026 | C_21 sarala | Date | 05-May-2026 |
| 51 | 29-Apr-2026 | C-19 sarala | Date | 04-May-2026 |
| 52 | 25-May-2026 | C-43 | Date | 28-May-2026 |
| 53 | 18-May-2026 | C-35 | Date | 25-May-2026 |
| 54 | 22-Jun-2026 | C-69 | Date | 23-Jun-2026 |
| 55 | 15-Jun-2026 | C_60 | Date | 16-Jun-2026 |
| 56 | 12-Jun-2026 | C_59 | Date | 15-Jun-2026 |
| 57 | 19-Jun-2026 | C-67 | Date | 22-Jun-2026 |
| 58 | 11-Jun-2026 | C_58 | Date | 12-Jun-2026 |
| 59 | 10-Jun-2026 | Corrigendum 55 | Date | 11-Jun-2026 |
| 60 | 16-Jun-2026 | C_62 | Date | 17-Jun-2026 |
| 61 | 17-Jun-2026 | C_64 | Date | 19-Jun-2026 |
| 62 | 23-Jun-2026 | C-71 | Date | 25-Jun-2026 |
| 63 | 22-Jun-2026 | C-69 | Date | 23-Jun-2026 |
| 64 | 17-Jun-2026 | C_64 | Date | 19-Jun-2026 |
| 65 | 19-Jun-2026 | C-67 | Date | 22-Jun-2026 |
| 66 | 11-Jun-2026 | C_58 | Date | 12-Jun-2026 |
| 67 | 12-Jun-2026 | C_59 | Date | 15-Jun-2026 |
| 68 | 15-Jun-2026 | C_60 | Date | 16-Jun-2026 |
| 69 | 16-Jun-2026 | C_62 | Date | 17-Jun-2026 |
| 70 | 25-Jun-2026 | C-73 | Date | 30-Jun-2026 |
| 71 | 17-Jun-2026 | C_64 | Date | 19-Jun-2026 |
| 72 | 23-Jun-2026 | C-71 | Date | 25-Jun-2026 |
| 73 | 19-Jun-2026 | C-67 | Date | 22-Jun-2026 |
| 74 | 22-Jun-2026 | C-69 | Date | 23-Jun-2026 |
| 75 | 16-Jun-2026 | C_62 | Date | 17-Jun-2026 |
| 76 | 15-Jun-2026 | C_60 | Date | 16-Jun-2026 |
| 77 | 12-Jun-2026 | C_59 | Date | 15-Jun-2026 |
| 78 | 30-Jun-2026 | C-76 | Date | 02-Jul-2026 |
| 79 | 05-Jun-2026 | C-51 | Date | 08-Jun-2026 |
| 80 | 01-Jun-2026 | C-47 | Date | 05-Jun-2026 |
| 81 | 27-May-2026 | C-44 | Date | 29-May-2026 |
| 82 | 29-May-2026 | C-45 | Date | 01-Jun-2026 |
| 83 | 25-May-2026 | C-43 | Date | 28-May-2026 |
| 84 | 09-Jun-2026 | C-54 | Date | 10-Jun-2026 |
| 85 | 08-Jun-2026 | C-53 | Date | 09-Jun-2026 |
| 86 | 05-Jun-2026 | C-51 | Date | 08-Jun-2026 |
| 87 | 29-May-2026 | C-45 | Date | 01-Jun-2026 |
| 88 | 01-Jun-2026 | C-47 | Date | 05-Jun-2026 |
| 89 | 05-Jun-2026 | C-51 | Date | 08-Jun-2026 |
| 90 | 08-Jun-2026 | C-53 | Date | 09-Jun-2026 |
| 91 | 10-Jun-2026 | Corrigendum 55 | Date | 11-Jun-2026 |
| 92 | 08-Jun-2026 | C-53 | Date | 09-Jun-2026 |
| 93 | 09-Jun-2026 | C-54 | Date | 10-Jun-2026 |
| 94 | 01-Jun-2026 | C-47 | Date | 05-Jun-2026 |
| 95 | 29-May-2026 | C-45 | Date | 01-Jun-2026 |
| 96 | 27-May-2026 | C-44 | Date | 29-May-2026 |
| 97 | 25-May-2026 | C-43 | Date | 28-May-2026 |
| 98 | 16-Jun-2026 | C_62 | Date | 17-Jun-2026 |
| 99 | 15-Jun-2026 | C_60 | Date | 16-Jun-2026 |
| 100 | 12-Jun-2026 | C_59 | Date | 15-Jun-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. |
| 2 | Providing and Filling stones or spalls into crates and hand packing including supply of boulder from nearest approved quarry to site including loading, unloading and complete in all respect and Stacking with in 15 mtr of unloading point into stack of specified sizes |
| 3 | Weaving of MSA wire crate netting 15 cm to 15 cm mesh i/c binding at site and partition incluing supply of MSA wire 4 mm dia |
| 4 | Laying Gravel 75mm to 25 mm/ Filter Media. It includes supply and carriage of filter material from Haryal to site of work including all taxes, royalty etc. Complete as per site requirement & as per directions of Engineer-In charge. |
| 5 | Filling spaces and foundation with old stone obtained from dismantling including labour for dismantling. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-5 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-6 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-7 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-8 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-9 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-10 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-11 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-12 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-13 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-14 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-15 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-16 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-17 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-18 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-19 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-20 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-21 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-22 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-23 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-24 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-25 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-26 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-27 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-28 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-29 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-30 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-31 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-32 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-33 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-34 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-35 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-36 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-37 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-38 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-39 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-40 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-41 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-42 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-43 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-44 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-45 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-46 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-47 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-48 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-49 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-50 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-51 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-52 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-53 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-54 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-55 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-56 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-57 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-58 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-59 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-60 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-61 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-62 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-63 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-64 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-65 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-66 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-67 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-68 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-69 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-70 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-71 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-72 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-73 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-74 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-75 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-76 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-77 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-78 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-79 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-80 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-81 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-82 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-83 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-84 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-85 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-86 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-87 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-88 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-89 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-90 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-91 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-92 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-93 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-94 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-95 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-96 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-97 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-98 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-99 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-100 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
TodayBid Opening Date
Technical bids will be opened and evaluated.
TodayTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender